Culvert collapses on workers

Grant Prior 1 year ago
Share

Two building firms have been fined after a man was seriously injured when a structure that allows water to flow under roads collapsed on him.

Maidstone Crown Court heard that Kent County Council appointed Enterprise to replace a damaged brick culvert under Tudely Lane Tonbridge.

Enterprise in turn appointed Topbond to do the majority of the work.

A culvert is an embedded structure, usually surround by soil and can be made from steel, brick or reinforced concrete or other material and is used to transport water underground from one side of a road or railway to another.

The HSE prosecuting told the court that on 27 January 2012 water was being pumped out of the work area when three workers including 63-year-old Michael Skitt of Kingsnorth, Ashford, entered the area between two culverts in order to clear a channel for the remaining water to flow toward the pump head.

They had begun to clear loose material, but had not started digging.

Shortly after they entered the area, the old brick culvert collapsed. One man jumped clear, another was hit but managed to release himself, but Skitt was trapped and injured.

Skitt suffered multiple injuries including shoulder blade breaks, an open shin break and a dislocated knee.

Ongoing issues with his foot may see him need further operations. Skitt spent 26 days in hospital and has now had to give up full time work and walks with a stick.

HSE said the stability of the structure was not assessed adequately, nor sufficient planning undertaken to ensure adequate control measures were in place.

Its investigation found that originally the old culvert was to be totally demolished early in the work, when this was changed the implications of uncovering half of the damaged culvert and therefore loading it unevenly and undermining it were not managed.

Although culvert repair/replacement is a relatively unusual construction job, the collapse of excavations and structures is common and the court heard the defendants in the case were made aware of the potential of collapse by the original designers/engineers several times.

The culvert could have been demolished early in the work, failing this, there are a number of commonly used ways to support structures during construction work.

Enterprise (AOL) Ltd of Halley Road, Oxford admitted safety breaches and were fined a total of £90,000 and ordered to pay an additional £22,876 costs.

Topbond PLC, of Sittingbourne, Kent also admitted safety breaches and were also ordered to pay £22,876.60 costs and were fined £70,000.

After the case, HSE inspector Nicola Wellard said: “This is a sad case that has changed at least one man’s life for ever. The culvert was being replaced because it had been damaged previously.

“Just this one piece of information should have been enough to ensure both contractors assessed the stability of the culvert throughout the work and took appropriate measures to ensure people were protected from the risk of collapse.

“These risks are well known and the fact that the two other men escaped without serious injury was just pure luck, this could easily have been a multiple fatality.”

Latest news

Firms sentenced after four killed in site excavation tragedy

Companies fined £700,000 after disaster in Norfolk
3 days ago

BAM books in £35.5m refurb deal at listed castle

Studley Castle will become hotel owned by Butlin's group
2 days ago

Carillion plans job losses as rail spending cuts bite

Union vows to fight against redundancies as renewal spending falls
3 days ago

Ardmac wins fit-out deal at Kirkstall Forge

Work to start next month on new offices for vehicle leasing specialist
2 days ago

McLaren lands £38m Brighton College sports and science centre

Contractor bags third major deal in five years with college
3 days ago

CITB to sell awarding body

Cskills Awards to have new owners
2 days ago

Balfour to close seven offices in Scotland

All operations north of the border to be directed from one new main office
3 days ago

Cemex drivers call off strike plans

Fear of disruption to site materials deliveries subsides as pay deal struck
3 days ago

Nine firms win places on £225m modular framework

Fusion 21 picks winners for education authorities to use
4 days ago

Winners revealed for LHC modular buildings deal

Big week for offsite as another major framework agreed
3 days ago

Helical bullish about London office market

Developer focuses on London, Manchester and logistics sites
3 days ago

Tarmac poaches director from FM Conway

Surfacing boss Toby Pyper to join Tarmac next month
3 days ago

Private rented sector fund raises £250m

Investors pile-in to new PRS fund looking for stakes in new schemes across the country
3 days ago

Race starts for first £15m Brent Cross infrastructure deal

Roads and utilities work to pave way for £1.4bn shopping centre revamp
3 days ago

Developers scale down plans for Wylfa nuclear plant

Number of construction workers needed falls to 8,500 from 10,000
4 days ago

Facebook snub prompts refurb rethink on Oxford Street

Great Portland Estates considers more extensive revamp at Oxford House
4 days ago

McLaren lands deal to fit-out new home of the FT

Newspaper staff will have a running track on the roof of New Bracken House
5 days ago

Skanska appoints new head of building business

Katy Dowding promoted as contractor unveils management reshuffle
5 days ago

Bid race begins for £20m mega car park

Port of Southampton plans largest car storage facility yet
4 days ago

MVS Group lands mechanical deal at new Spurs stadium

Midlands specialist boosts turnover and opens new North West office
5 days ago

BAM wins £20m Sheffield school

Mercia secondary school will open late next year
5 days ago

Sparks down tools on Skanska Crossrail sites

Electricians "cabin-up" in row over bonus pay and union recognition
5 days ago

Renew pulls out of low pressure gas mains work

Forefront Utilities business to focus on medium pressure replacement schemes
5 days ago

Wonky crane gets Multiplex out of a tight fix

Ingenious crane design at London's tallest tower site
5 days ago

200 Quadrant Construction staff face restructure

L&Q to close Quadrant Construction brand in big shake-up of development activities
5 days ago

Construction to start on £100m Bath resi scheme

Investment fund buys former Bath Press site
5 days ago

Three bosses jailed after fatal roof fall

Court hears how safety measures were ignored to save money
6 days ago

Property firm merges with main contractor

Wigley Building and Development will target projects up to £12m
6 days ago

Go Interiors acquires cladding specialist FGF

Deal creates £65m distribution business
6 days ago

Revamp of world’s first factory trials novel procurement

Derby Silk Mill project to test integrated project insurance
6 days ago

Contractor services