Steelwork contractor goes into administration

Aaron Morby 11 years ago
Share

West Sussex-based steelwork contractor Graham Wood Structural has collapsed.

The firm, which is owned by the Irish SIAC Construction Group, had run up losses in recent years, but managed to keep afloat with the help of parent company loans.

Graham Wood’s problems crystallised when the SIAC Construction Group itself ran into financial difficulties from loss-making road jobs in Poland.

Last October, SIAC Construction Group was placed into examinership, owing €42m to three banks, KBC, Bank of Scotland and Bank of Ireland.

Since then the Feighery family, who are majority shareholders of SIAC Holdings, have been battling to save the business.

Yesterday the family together with French giant Bouygues gained court approval for a plan to rescue seven key companies within the group, saving 200 jobs.

This will see a €10.5m investment in the company, with about €5m going to secured banker creditors – Bank of Ireland, Bank of Scotland and KBC Bank.

The SIAC companies have 1,255 creditors, including 876 Irish/UK creditors and 379 Polish creditors, and most of those will get between 5-10% of what they are owed.

But the deal does not save Graham Wood Structural, which employed 25 management and office staff with around 50 operatives, according to the last accounts and owed SIAC £2.6m.

Grant Thornton will now see what can be raised through a possible sale of the steelwork contractor’s assets including a fabrication unit at Lancing, which is capable of producing 12,000 tonnes of fabricated steel per year.

Latest news

Buyers report boom in commercial work

Construction bucks slowdown in general economy
2 hours ago

Plans in for £250m Stockport 8 housing-led scheme

Work to start on phase 1 by the end of next year
2 hours ago

Galliford Try tops monthly contracts league

Contract awards slow down in November
5 hours ago

Erith explosives set demolition record at Sizewell

Watch blast at former nuclear turbine hall: Video
5 hours ago

Vistry to build 950 homes next to Olympic Park

Developer signed for £600m Pudding Mill Lane scheme in East London
5 hours ago

Inflatable formwork used for 45m tall cement silo

Ground-breaking dome silo inflated at Tilbury Docks
5 hours ago

Briggs & Forrester sells maintenance arm

100 engineers to move over to new owner
22 hours ago

£2bn Edinburgh ‘West Town’ scheme approved

7,000 homes to be built at 205-acre site
21 hours ago

Rayner approves Lancashire super prison

Communities secretary overrules planning inspector for 1,700 inmate prison.
1 day ago

Wates boss returns after collapse of his own contractor

Paul Nicholls was head of the failed Real construction group
2 days ago

Trio secure Birmingham deal to retrofit 3,000 homes a year

Specialist contractors to install insulation, efficient heating and solar panels
1 day ago

Costain confirms £400m HS2 tunnels win

Work to start early next year on tunnel and lineside mechanical and electrical systems
1 day ago

First nuclear reactor installed at Hinkley: Video

Watch precision operation at Somerset site
1 day ago

Winner named for £14m Harbourside revamp

Local Irvine contractor to transform beach front
1 day ago

New Fair Payment Code goes live today

Latest bid to get subcontractors and suppliers paid within 30 days
2 days ago

Lincolnshire concrete supplier files administration notice

Ever Readymix Concrete & Screed operates three depots and a fleet of 20 trucks
2 days ago

Graham lands first deal on Liverpool’s largest brownfield site

Contractor bags infrastructure package on 10.5 hectare site
3 days ago

Bouygues UK boss to step down

Fabienne Viala to leave after eight years at the helm
3 days ago

Galliford Try scoops £87m brace of London jobs

Firm will redevelop a prominent corner building on Sloane Street in Chelsea
2 days ago

New HS2 boss Mark Wild starts amid prep for final TBM drives

Former Crossrail CEO starts with a sharp focus on controlling costs
3 days ago

Ten consultants land Thames Water major upgrade places

Firms will share £400m of fee work over next five years
3 days ago

Rayner ultimatum to fix all unsafe tall buildings by 2029

Recladding work must start on all 18m+ resi buildings by 2027
3 days ago

ISG administrator finds just £35m to pay down £1.1bn debt

Failed firm was set to report £148m blackhole from legacy jobs
3 days ago

Redesign needed on Colas “bridge to nowhere”

Technical challenges continue as £38m scheme faces further delays
3 days ago

Skanska UK shakes-up boardroom team

Four new board appointments as two directors step down
3 days ago

Ultra rich clamour for Mace super prime resi scheme

Topping out at £2bn 1 Mayfair scheme where homes start at £35m
3 days ago

Watkin Jones wins £48m St Helen’s affordable homes deal

Firm to build nearly 300 homes for housing association
3 days ago

Barratt sets start date for High Barnet station scheme

Latest scheme to be delivered by the £1.9bn West London Partnership
3 days ago

Investors lose £26m after M&E contractor goes under

78 private investors hit by Gallant Building Services collapse
6 days ago

First contractor call for £80bn Government mega-framework

Seven-year deal will cover construction work across all departments
7 days ago

Contractor services