Olympic Stadium conversion costs rise by another £51m

Grant Prior 9 years ago
Share

London Mayor Sadiq Khan has ordered an investigation into the cost of converting the Olympic Stadium into West Ham’s new home.

The move comes as it was revealed the conversion costs have jumped by another £51m to £323m from £272m.

Balfour Beatty was in charge of converting the stadium under a £190m contract.

The Enquirer first revealed two years ago that the costs were going to bust the original budget

Balfour was granted extra cash for construction work pushing the overall conversion cost to £272m.

But Sky News has now learned the price has risen again with the higher costs being partly blamed on extra outlay for retractable seats.

Deputy Mayor Jules Pipe told Sky News: “Last year the previous administration told the public that the costs had risen in total to around £270m. The new Mayor has now been told that cost will be over £320m.

“Understandably, Sadiq has ordered an investigation as to why those two figures are so wildly different.

“As the new administration at City Hall clearing up the mess of the previous administration, we need to make sure that the stadium runs on a sustainable basis and it is affordable to London.”

When Balfour was granted an extra £36m for the work in October 2014 the authorities said the increase “reflects the huge scale of the works undertaken to transform the former Olympic venue from a temporary athletics stadium into a year-round multi-use arena capable of delivering world class sporting and cultural events.”

The LLDC said: “The stadium work included the removal of the original roof and light paddles and installation of a new permanent roof, the largest of its kind in the world.

“The 45,000sqm cantilevered roof needed significant strengthening of the superstructure to support the 8km of cable net, 112 steel rafters, 9,900 roof panels and 14 light paddles each weighing 45 tonnes.

“The new roof covers every seat in the venue, improving the acoustics and spectator experience.

“An innovative retractable seating system required the removal of the lower seating bowl. The 21,000 movable seats bring the fans close to the pitch for football and rugby ensuring the Stadium has a long-term legacy.”

Latest news

HS2 first as giant bridge slid across live motorway

Watch timelapse footage of pioneering 4,600-tonne viaduct installation
2 hours ago

Gilbert Ash breaks ground on £120m Wilde aparthotel

Staycity’s biggest London scheme gets underway in Shoreditch
2 hours ago

Bennett wins brace of retirement home deals

Contractor to build more than 200 apartments for investor Octopus Capital
2 hours ago

Developer showed “total disregard” for site safety

Property firm fined £45,000 for failing to meet basic standards
2 hours ago

Watkin Jones takes £8.7m hit but eyes brighter 2026

A £2bn pipeline and stronger deal flow help rebuild confidence after a year of impairments
2 hours ago

Project manager caught running false invoice scam

Suspended sentence and ban for director after probe into offices to resi scheme
21 hours ago

Cardo nails £52m Sussex council homes roofing deal

Firm beats 14 rivals to take Lewes and Eastbourne roofing programmes
1 day ago

Bachy turnover sinks by over £100m as HS2 surge fades

Piling specialist reports slow year as mega projects step down
1 day ago

Van Elle finds buyer for loss-making Canadian arm

Two-year North America foray ends with £2.6m exit deal
1 day ago

£100m student halls to replace derelict London Crown Court

IQ student project gets go-ahead at Blackfriars court building site
1 day ago

Safety green light for Newcastle student scheme

Gateway 2 approval process delays construction start by a year
1 day ago

Plans go in for next phase of Manchester Waters

New neighbourhood planned for island site
1 day ago

JRL names new fit-out lead to drive expansion

Graham Ardley steps up to drive next phase of commercial and residential growth
1 day ago

Construction output yo-yos as growth falters again

Quarterly output down 0.3% amid cautious investor sentiment
4 days ago

Free school build plans axed to fund £3bn SEND expansion

Education secretary scraps 28 free schools to plug SEND shortfall
4 days ago

McLaren seals £160m funding for Manchester student tower

737-bed Upper Brook Street student scheme forward funded by L&G
4 days ago

Former McAlpine boss lined up for Royal BAM board role

Paul Hamer to replace Paul Sheffield on Dutch group supervisory board
5 days ago

Plans go in for £650m retail park to resi scheme

Construction could start in early 2027 on new neighbourhood for Lewisham
5 days ago

Lovell launches Midlands refurb division

Renew Central to be headed by Carl Yale
4 days ago

M Group muscles into top five contractors after growth spurt

Private-equity backed infra giant builds £8.8bn work mountain
5 days ago

Plans in for first major build phase of £2bn York Central scheme

Developers table plans for nearly 1,000 homes, parkland and York’s new western station gateway
5 days ago

Lords push for staged Gateway 2 approval to aid design and build

Inquiry warns BSR’s over-detailed Gateway 2 demands are freezing D&B process
5 days ago

CITB wage bill tops £52m as staff numbers jump 13%

Accounts show 182 people at training body earn £60,000+ a year
5 days ago

Peterborough electrical specialist files administration notice

EML Electrical Contractors lodges court notice
5 days ago

Ant Yapi UK lands latest Chelsea Barracks deal

Fit-out work on Building 7 will last until summer 2027
5 days ago

Go-ahead for plan to level Cambridge retail park for life-science hub

Minister overturns council refusal as Railpen’s scheme promises £600m economic uplift
6 days ago

Subcontractor competition keeps build costs flat at Berkeley

"Highly competitive tendering" expected to continue next year
6 days ago

Industry calls grow to scrap the CITB

Latest training cuts final straw for a lot of contractors
7 days ago

Green light for major Oxford Circus mixed use scheme

Construction to start in 2029 on revamp of BHS and London College of Fashion site
6 days ago

Coventry to back build of Very Light Rail street pilot

Council set to approve 800m twin-track route in push for rapid-build transport revolution
6 days ago