Green light for 24-storey London city office tower

Aaron Morby 2 years ago
Share

Property developer Brockton Everlast has got the planning thumbs up for its ‘greened’ 24-storey office building in London’s Square Mile.

The proposed 117m tall building will be built at 115-123 Houndsditch next to the Can of Ham building.
The proposed 117m tall building will be built at 115-123 Houndsditch next to the Can of Ham building.

It is the seventh major office scheme to gain planning in the City so far this year, underlying growing momentum for a new wave of major building projects post-pandemic.

Brockton Everlast said the 720,000 sq ft project, which has been designed by architect AHMM to deliver exemplary green credentials, will involve a total investment of over £320m.

Chair of the City Corporation’s Planning and Transportation Committee, Alastair Moss, said: “115-123 Houndsditch is the seventh office-led tall building scheme to secure planning permission in the Square Mile this calendar year.

“This is not only an unprecedented number of major developments to come for decision, but it also clearly illustrates the enduring strength of the office market in the City of London and unwavering confidence from developers.”

Consented Square Mile office schemes in 2021


  • Brockton Everlast:  24-storey office, 115-123 Houndsditch
  • Great Portland Estates: 13-storey 320,000 sq ft office, 2 Aldermanbury Square
  • CO-RE: 660,000 sq ft, 21-storey office scheme, 120 Fleet Street.
  • British Land: Broadgate 37-storey East Tower and 22-storey West Tower.
  • Tenacity: 33-storey scheme at 70 Gracechurch Street
  • Tenacity: 30-storey development 55 Gracechurch Street
  • BREO Hundred: 13-storey 140,000 sq ft office block Fetter lane

Demolition of the existing Houndsditch building and archaeological investigation will take around a year, with construction then expected to take three and a half years, employing around 660 workers on average during the build.

The development design aims to reduce operational carbon emissions by 44%, compared to a Building Regulations compliant building.

It will incorporate thermal stores to retain heat for use during colder months with a heat exchange scheme to share the excess waste heat, which cannot be stored, with the neighbouring Middlesex Street Estate.

The development also includes urban greening features including green walls and landscaped terraces and balconies for office occupiers.

The building will feature green balconies and large roof terraces with trees

Consultant Atelier 10 is investigating the potential for recycling the existing building’s steelwork frame and processing clean concrete back to aggregate for concrete construction.

Delivery of a LEED ‘Platinum’ and WELL ‘Platinum’ rated scheme which represents the highest level of attainment with respect to holistic environmental design and delivers a project with health and wellbeing at its core.

Client project team

Building to be supported at ground level by an array of 5-floor tall Y-shaped transfer props

Development Manager: Brockton Everlast Inc.
PM & EA: Gardiner & Theobald
Architect/Lead Designer: AHMM
Structural & Civils: AKT II
Building Services: NDY
Environmental Design: Atelier 10
Cost Consultant: Alinea

Development Director at Brockton Everlast, Richard Berry, said: “This scheme has been designed from the start with a relentless focus on carbon reduction. We tasked the architects to create an exceptional and sustainable design – one that delivers a vastly improved operational carbon footprint as part of our goal to future-proof the building for the next generation of net-zero occupiers.”

Latest news

Osborne staff start looking for new jobs

"Open to Work" flags appear on LinkedIn profiles
9 hours ago

Plan rejected for 42-storey tower above historic building

Councillor describes as ludicrous plan to build 300 flats above Georgian mansion
10 hours ago

Ventilation deal could hike product prices for contractors

Watchdogs at CMA launch probe after duct firm acquires rival
10 hours ago

Tide gets go-ahead for London 412 student flats scheme

Volumetric developer secures planning for West Ealing project
9 hours ago

Green light for £75m Friar Gate Goods Yard in Derby

Construction set to start this summer on revamp of historic buildings
9 hours ago

Robertson to deliver £45m Newcastle NHS Trust works

Capital works will be focused on Freeman Hospital and the Royal Victoria Infirmary sites
9 hours ago

Winners named for £2bn Healthy Homes framework

CHIC reveals line-up of over 40 firms for net zero and building safety works
10 hours ago

Plan lodged for tallest skyscraper outside London

Developer Salboy submits plan for 76-storey Manchester resi tower
1 day ago

Curo starts £170m race for new homes framework

Bath housing association plans to build up to 300 homes a year
1 day ago

Gove approves major Cambridge North mixed-use scheme

Government backs controversial scheme of 424 flats and 600,000 sq ft of tech and lab space
1 day ago

Pontins holiday park to house Sizewell C builders

Suffolk holiday park to house 500 nuclear construction workers
1 day ago

Adrian Bloor targets 1,000 homes-a-year

Expansion plans after major investment into challenger house building business HarperCrewe
1 day ago

Housing firm fined £528,000 after cable strike

Maintenance workers given no information on underground services
1 day ago

Berkeley subbies face six weeks without payments

Introduction of new finance software means payment hiatus for suppliers
2 days ago

Pagabo reveals 56 winners of latest £1.6bn retrofit deal

Decarbonisation Solutions Framework launched: Full list of winners
2 days ago

Go-ahead for £100m Liverpool Love Lane flats

500-flat scheme will be built across four blocks in Vauxhall area of city
2 days ago

Unions win HS2 site access battle at Old Oak Common job

Skanska, Costain, Strabag JV now the last denying unions access to HS2 sites
2 days ago

Contractors jack 1,100t viaduct into place in 13-hour operation

158m-long composite deck structure jacked into place 10-hours ahead of schedule
2 days ago

Wates wins former Daily Mail printworks transformation

British Land advances major cultural venue at London’s Canada Water
3 days ago

Mace poaches Ramboll chief to be Head of Engineering

Martin Feakes will develop civil and structural engineering offer at Mace
3 days ago

Subcontractors form alliance for major civils jobs

Trio of specialists join forces to collaborate and offer Tier 1 contractors a turnkey solution
3 days ago

Fear of supply chain failures boosting collaboration

Procurement survey also reveals project bank account use is rising
3 days ago

Wates sets up business to target 160,000 mouldy social homes

Healthy Homes service will be offered to social landlords across England
3 days ago

Higgins wins £75m Peabody Passive House job

Latest phase of Deptford Landings to start construction
3 days ago

Contractors and unions agree Sizewell C working deal

New deal offers improved sick pay and parental leave over Hinkley Point deal
4 days ago

Competition chiefs win legal fight for more construction raids

High Court rules CMA officials can raid a domestic property as part of investigation
4 days ago

More Osborne companies file administration notices

Three more divisions lodge notices with court
4 days ago

McLaren wins multi-storey urban logistics contract

South London win with British Land is pioneering urban logistics hub
4 days ago

Big social housing schemes at risk over funding uncertainty

Housing associations warn uncertainty over public funding beyond 2026 is curbing new schemes
4 days ago

Kier wins Worcestershire town centre renewal

Firm secures Bromsgrove commercial and cultural hub project
4 days ago

Contractor services