Rebar maker fined £200k for crane hook death

Grant Prior 16 years ago
Share

A Cardiff-based steel reinforcement bar manufacturer has been ordered to pay over £230,000 after an employee died after being hit by 3.7 tonne crane hook.

John Penhalagan, 44, was employed by Celsa Manufacturing (UK) when he was struck by the crane hook used to convey ladles of molten steel in the firms new ‘melt’ shop on 30 May 2007.

Penhalagan of Bridgend suffered fatal head injuries and died later at the University Hospital of Wales, Cardiff.

A Health and Safety Executive (HSE) investigation found that while there was no mechanical defect with the crane, the hooks were able to move at head height near to operators on the ground without adequate safeguards.

Celsa pleaded guilty to safety breaches at Cardiff Crown Court and was fined £200,000 and ordered to pay costs of £36,294.38.

After sentencing, HSE inspector Stephen Jones said: “This was a horrific incident – an extremely heavy, moving piece of equipment was able to strike Mr Penghalagan directly in the head because Celsa Manufacturing didn’t have safe systems of work in place.

“The operation had recently moved to a new melt shop but while there was no mechanical defect with the crane, the company did not address the fact that the hooks were able to move at head height near to operators on the ground.

“The system of work did not enable crane operators at the site to clearly see employees working on the ground, putting them at serious risk of being struck by moving objects.

“Celsa should have put in place a thorough risk assessment and most importantly acted upon that assessment, given the generally hazardous nature of this type of operation – but sadly the plans in place were just not adequate and led to this man’s terrible death.”

Latest news

Winvic lands £130m Leeds BTR towers job

Twin-block scheme of 578 flats to start in the late Autumn
16 hours ago

Platform collapse fractures neck of drilling worker

Court hears catalogue of errors around temporary platform during concrete cutting work
13 hours ago

Domis clears Gateway 2 hurdle for Manchester tower

July start confirmed on 237-home Cornbrook scheme with aparthotel
17 hours ago

Steel tariff loophole puts 30,000 fabrication jobs on the line

Industry demands urgent Government rethink as 1 July tariff cliff edge looms
22 hours ago

Vistry launches voluntary exit scheme for staff

Swathe of job cuts loom as staff offered route out as debt reduction becomes top priority
23 hours ago

Scores bag places on £9.5bn education building framework

Galliford Try, Graham, Seddon, CBES and GMI feature across multiple lots on CPC deal
23 hours ago

Groundworks firm Mackoy bought in pre-pack deal

Former chairman and MD set up new firm after administration
4 days ago

Met Police launch £560m construction framework hunt

Nine-lot deal will drive refurbishments, security upgrades and new-build projects
23 hours ago

CITB set for £20m pension windfall

Training body set to receive cash from fund wind-down
23 hours ago

Construction leaders recognised in King’s birthday honours

Former Tideway boss Andy Mitchell knighted, and Rick Willmott gets OBE
21 hours ago

McAlpine replaced on £4bn Somerset gigafactory job

Rival contractor TSL believed to be waiting in wings to take over
4 days ago

Contractors circle to finish Ardmore’s 10 big London jobs

De Group and RED Construction close in on two jobs
4 days ago

Ardmore Construction Group collapses into administration

Safety liability fears choke new work pipeline as London contractor shuts sites and calls in administrators
5 days ago

Kier wins £140m water contract extension

Sole appointment on two-year South West Water framework extension
4 days ago

New boss strengthens Severfield delivery team

Steelwork specialist appoints transformation and operations chiefs
4 days ago

Guildmore gets start date for £68m leisure centre

Demolition to get underway this autumn at Tower Hamlets site
4 days ago

Gatwick picks 11 firms to drive £2bn airport upgrade

Mace, Morgan Sindall and Costain land Gatwick framework spots
5 days ago

Allied London unveils landmark Castlefield tower plan

46-storey residential block would complete regeneration of long-vacant city centre site
5 days ago

Derby backs 1,150-home Derbion masterplan

Eagle Market and Bradshaw Way sites form part of wider city centre regeneration plans
5 days ago

Lorne Stewart returns to profit after two years in the red

M&E specialist posts £1.6m pre-tax profit after operational reset
5 days ago

CCTV captures scaffolder’s skylight roof plunge

Two firms fined £79,300 after worker suffers broken arm, leg and head lacerations
6 days ago

Subcontractors wanted for jobs across Yorkshire

Constructionline latest event in Leeds: Register now
5 days ago

McAlpine/Vinci £1.3bn Crewe hospital gets green light

Leighton Hospital replacement moves towards delivery phase
6 days ago

Sellafield site pay dispute sparks new week-long strike

Nearly 2,000 construction workers to walk out after talks over nuclear site allowance stall
6 days ago

Plan unveiled for new London high-rise hospital in Paddington

£2bn St Mary's 30-storey super-hospital set to reshape London skyline
7 days ago

Portsmouth lines up £120m tower block safety blitz

Framework bidders need Gateway 2 experience
6 days ago

Quartet of care home wins for Kori

Work to start this summer on schemes worth £47m
6 days ago

Motorway concrete barrier safety drive hits the hard shoulder

National Highways replaces just 53km of ageing steel with concrete in five years
6 days ago

Thieves steal 6,000 litres of petrol from motorway site

Raid on Galliford Try M5 upgrade job
7 days ago

Duo share £1.2bn coastal beach management framework

Environment Agency 8-year deal covers beach recharge, flood protection and emergency response works
6 days ago