Main Contractor Chalcroft has been fined £14,000 and ordered to pay £23,000 in costs after two workers fell eight metres from collapsing formwork at a factory building job in Coleford.

Cheltenham Magistrates Court heard that Spencer Gosney from Yeovil, and Matthew Brewer from Nottingham, had been subcontracted to build a concrete core as part of a new GlaxoSmithKline factory.

On August 12 2009, the two men were building the core using a large piece of climbing formwork.

As the tower got higher, the formwork was lifted up and fixed in place enabling the men to work at the top to set more concrete.

But one of the anchor points holding the section of formwork where the men were standing came out of alignment before the concrete was poured in.

The men used a bolt not suited for this use in its place, but fixed it at an acute angle. The bolt was unable to withstand the weight of the concrete and broke, tipping the platform upon which the men were standing, sending them falling to the ground.

Gosney suffered a laceration to his head and severe bruising to his internal organs and leg. Brewer fractured his hip and pelvis and has still not returned to work.

Sue Adsett, the HSE inspector who investigated the incident said: “It is vital all work is properly planned and checked in order to prevent or reduce the impact of falls. Safety-critical parts of temporary work equipment should be checked before use.

“This incident occurred because neither of these things was done. Crucially, Chalcroft Ltd had no formal procedures in place to make safety-critical checks.

“These checks would have revealed that the working platform was not secure, and this failing has caused serious injury to two men.”

Chalcroft Ltd, of Keytec 7 Business Park, Pershore, Worcestershire, admitted breaching Construction (Design and Management) Regulations 2007 Reg 22 (1)(a) and was fined £14,000 with £23,236.28 in costs.

Latest news

Civils work fuels fastest output rise in two-and-a half years

Construction buyers see September surge
1 day ago

Renew sells Walter Lilly building arm

100-year-old building business sold to luxury contractor Size
2 days ago

Work to start on Teesside and Merseyside carbon capture schemes

Government commits £22bn funding to world's first industrial-scale carbon capture projects
2 days ago

Flagship £200m London Premier Inn scheme approved

700-bed hotel to be built on the Strand near Trafalgar Square
2 days ago

Kilnbridge appoints new construction director

Former McGee director Darren Wickins joins concrete frame specialist
2 days ago

HS2 trial to replace cement with baked clay

Extra funding for programme to replace cement in concrete with calcined clay
2 days ago

Subcontractors wanted across the South West

Register now for latest Constructionline event in Bristol
2 days ago

Galliford Try profits and revenue surge

Release of delayed building jobs and surging water spend boosts firm
3 days ago

Octavius Infrastructure national expansion push pays off

Revenue leaps 28% to £277m with order book at over £1bn
3 days ago

Skanska staff get access to digital doctors

Contractor launches benefit for staff and their families
3 days ago

Another new name for former Kier Living housing arm

Tilia Homes and Hopkins Homes now known as untypical
3 days ago

Danny Sullivan Group buys M&E recruitment firm

Acquisition boosts presence in infrastructure sector
3 days ago

Sisk in talks to finish ISG’s £200m Teesside vaccine plant

First big job to restart since crash of ISG nearly two weeks ago
4 days ago

Wates snaps up 1,100-staff social housing upgrade contractor

Liberty deal spearheads push into heating and compliance market
5 days ago

Go-ahead for Liverpool film studios and museum jobs

£60m Littlewoods film studio and £58m museum revamp approved
4 days ago

London RC frame specialist goes under

Bela Structures had a 100-strong workforce at peak
3 days ago

VolkerWessels lifted by marine arm’s return to profit

Group operating margin slips to 2.5% in challenging year
4 days ago

United Living appoints Director of Water

Scott Beard joins from Welsh Water where he was head of engineering
4 days ago

HE Simm eyes return to profit after £10m loss

£4m family cash injection helps engineering division rebound
5 days ago

Dragados lands Elephant & Castle tunnel deal

Work to start next year on excavating 135m of new passenger tunnels
4 days ago

Caddick bolsters Midlands construction team

John Currie and Ian Calder to oversee operations in region
5 days ago

Angry staff call for investigation into collapse of ISG

Former staff say business began to unwind two years ago amid management failures
5 days ago

Direct labour model lifts Clancy to record revenue

Pre-tax profit jumps 55% to £21m from £379m revenue
5 days ago

Tyne Coast College put firms on alert for £60m campus job

Tenders set to be invited for South Shields town centre college campus
5 days ago

Costain trials project carbon tracker

Online tracker helps contractor measure emissions across supply chain
5 days ago

Sisk starts £80m Manchester Ancoats resi blocks

Jersey Wharf and Eliza Yard will provide 316 flats
5 days ago

Rayner scraps London housing plan review

Mayor's annual target hiked to 81,000, up from 37,000 delivered in recent years
6 days ago

Vp lands rail supply deal with Balfour Beatty

Torrent Trackside division wins two-year deal
5 days ago

L&G modular homes amassed loss hits £359m

Firm still counting cost of failed foray into modular homes
6 days ago

£200m Wimbledon tennis courts expansion approved

Plan includes 8,000 seat covered show court alongside 38 more courts
6 days ago

Contractor services