London starts £2,500 lane rental charges for utility firms

Aaron Morby 13 years ago
Share

Transport for London today rolls out out its pioneering lane rental scheme charging utility companies £2,500 a day for working in congested areas and at busy times.

The groundbreaking scheme has been designed to push utility contractors to work on the roads during the night and at off-peak times to cut traffic congestion.

Funding generated by the scheme will be ploughed back into innovative methods to further reduce disruption associated with roadworks

The scheme covers over 200 miles or 60% of the TfL road network, covering the areas most susceptible to major roadwork disruption.

Local Transport Minister Norman Baker said: “Everyone who uses London’s roads is acutely aware of how frustrating it is to find major routes being dug up in the middle of the rush hour.

“The delays caused by roadworks are inconvenient and expensive, which is why we have authorised a pioneer lane rental scheme in the Capital to see whether these delays can be cut.

“I hope that this scheme will encourage those who need to do road works to get them finished faster as well as reducing disruption for those using London’s roads and I look forward to seeing the results of this project.”

TfL is not exempt from the rules and the new scheme will also ensure that their works are delivered with minimal disruption.

Currently, around 70% of TfL works are carried out outside of peak hours, compared to around 20% of utility works.

    Innovative methods

    An 18-month project, run by the Transport Research Laboratory, is exploring engineering techniques that could see utilities use temporary road surfacing methods such as plating, fast-setting replacement road surfaces or more innovative methods such as core and vac techniques.

    This would allow utility works to be carried out under the road surface without the need to excavate a large area of the road surface.

    All these methods would allow both TfL and utility companies to carry out more work at quieter times, meaning that more roads could be re-opened during peak traffic periods; cutting delays and disruption across the Capital.

    Leon Daniels, Managing Director of Surface Transport at TfL, said: “Our lane rental scheme allows us to encourage more roadworks on the Capital’s busiest roads to take place outside the busiest hours, cutting unnecessarily prolonged and disruptive roadworks from our road network.

    “By using any surplus raised to discover new and innovative working methods, TfL and the utility companies can further ensure that works take place outside of the charging periods, allowing all to benefit greatly.”

Latest news

BSR backlog swells as new build approvals run to 36 weeks

First official Government figures expose full extent of Gateway project logjam
7 hours ago

Repair slowdown drags down construction output

New work activity rises in May despite overall 0.6% output fall
7 hours ago

Equans suffers £29m loss as new build exit drags on

Refocused retrofit contractor still dogged by legacy losses despite profitable core work
6 hours ago

Scaffolding trade body NASC facing discrimination claim

Former training manager to take trade body to Employment Tribunal
7 hours ago

ACS lands lead role on Stafford transformers lab

Contractor to start main £20m expansion in live site environment
6 hours ago

GRAHAM sees profits rise despite dip in turnover

Record order book as contractor confident about future prospects
7 hours ago

Nixon Hire sells 200-strong welfare van fleet to Sunbelt

Sunbelt more than doubles mobile site welfare capability
1 day ago

Henry family and directors face claims topping £31m

Administrators chasing dividend payout, unpaid loans and family benefits
1 day ago

Vistry eyes second-half affordable homes work surge

Government rent reforms and funding pledges power-up work pipeline
1 day ago

JV picked to progress Severn-Thames water transfer plan

AtkinsRéalis and Stantec to map pipeline or canal link
1 day ago

Police catch on the run construction boss

Director missing for months after failing to appear in court after site death
1 day ago

Green light for £800m Poplar estate revamp

Construction to start next year at Teviot Estate
2 days ago

Civil engineering trade body boss leaves to join Mace

CECA Chief Executive Alasdair Reisner joins consulting arm
2 days ago

House builders offer £100m to drop competition probe

CMA set to strike deal with cash going to affordable housing programmes
2 days ago

Transport Secretary axes £1.4bn road jobs in south east

Alexander pulls plug on A12 and A47 upgrades in budget crackdown
2 days ago

Fusion taps HG for first Birmingham student job

622-bed Bristol Road scheme kicks off contractor’s Midlands push
2 days ago

VolkerWessels UK parent group to sell core Dutch business

UK, German and North American operations remain with Dutch owner Reggeborgh
2 days ago

Union claims sex pests are rife in construction

Shock assault figures following Unite survey of 100 workers
2 days ago

Green light for two more City of London towers

Combined 77 more storeys of office schemes approved
3 days ago

John F Hunt starts enabling works on £200m Strand Premier Inn

Main contractor due to be appointed this summer
3 days ago

£200m deal unlocks full 1,000-home Digbeth scheme

Caddick has started early works on the Moda-led Stone Yard project
3 days ago

10 big road and rail upgrades get funding green light

£1.3bn A66 dualling, Simister Island junction upgrade and Midlands Rail Hub get funding
3 days ago

Design, build and finance plan for £1bn Cheddar 2 reservoir

South West Water starts pre-bid market engagement on 75km pipeline and reservoir
3 days ago

Illegal working blitz catches Indian builders

Home Office raids target migrants working cash-in-hand on sites
4 days ago

Major Sizewell concrete win for local supplier

Eastern Concrete Ltd wins its biggest ever contract
3 days ago

SIG chief put on gardening leave

New CEO appointed as Gavin Slark steps down immediately
3 days ago

Adjustable hard hat launched for different hair types

AtkinsRéalis initiative will also make PPE more comfortable for bald builders
3 days ago

Lynch appeal sees £800,000 abnormal load fine reduced to £10k

Judge rules original fine was was 'manifestly excessive'
4 days ago

Government calls up firms to explore PPP healthcare projects plan

New public-private partnership idea to be scoped out with contractors
4 days ago

Balfour Beatty terminates Danny Sullivan labour deals

Around 500 workers on HS2 will be moved to alternative agencies or be taken on direct
7 days ago