Buyers reveal biggest drop in orders for three years

Grant Prior 13 years ago
Share

Construction buyers reported a renewed downturn in output during August as new orders also fell at their fastest rate for three years.

The latest Markit/CIPS Construction Purchasing Managers’ Index fell to 49 from 50.9 as activity fell in all sectors.

Any figure below 50 on the sentiment survey represents a fall in output.

The survey also recorded the fastest fall in new business volumes since April 2009.

David Noble, Chief Executive Officer at the Chartered Institute of Purchasing & Supply, said: “This is dire news for the construction sector which saw its fastest drop in new orders for over three years.

“Undoubtedly the Government will come under more pressure to help the sector and implement Sir Adrian Montague’s proposals to kick-start house building, when it responds later this year.

“Both the decline in commercial activity and the significant drop in new orders are particularly worrying.

“The commercial sector had previously been propping up the figures and the lack of new contracts suggests things will get worse before they get better.

“Inevitably confidence has also been hit hard, and it has not been recorded as low as it is now, since last October. For good reason too, as it’s clear that tough times still lie ahead.”

Tim Moore, Senior Economist at Markit said: “August data reaffirms that UK construction firms are suffering a prolonged downturn in new work and there is little evidence to suggest an imminent rebound in output levels.

“This has been the pertinent message from the UK Construction PMI surveys throughout the summer, and most worryingly the latest drop in new orders was the fastest since the sector was in full scale retreat in early 2009.

“A construction decline for 2012 overall is statistically baked in the cake.

“To bring output for the year as a whole up to the total level seen in 2011 would require a rather implausible double-digit growth surge in each of the final two quarters.

“Therefore, an important issue is simply whether a floor has yet been established, and the survey evidence at this stage seems to suggest it hasn’t.

“Indeed, output dropped in August at the second-fastest rate since the snow-affected month of February 2010, with commercial activity even joining the housing and civil engineering sectors in contraction for the first time in two-and-a half-years.”

Latest news

Bid race starts for £15bn schools framework refresh

DfE throws framework open to more contractors
4 hours ago

Berkeley’s £600m Borough Triangle project approved

Controversial scheme features two towers of 38 and 44-storeys
20 hours ago

London Mayor calls in blocked 600-bed student scheme

Refused 20-storey London PBSA block may still be built
4 hours ago

HG to build 500-bed London Stratford student scheme

Work will start later this year subject to gateway 2 safety approval
20 hours ago

Arrest after pedestrian death on construction site

Tragedy during site preparation works for new Wigan car park
4 hours ago

British Steel threatens closure of Scunthorpe blast furnaces

Chinese owners say sectional steel and rail supplies will be maintained
23 hours ago

Planning green light for Sheffield warehouse site

Existing factories to be demolished in new scheme for Rula Developments
5 hours ago

New rail property company to unlock land for 40,000 homes

First four sites released in Newcastle, Cambridge, Manchester, and Nottingham
1 day ago

Drainage specialist Subscan files administration notice

Specialist employing 131 people files court notice
1 day ago

Four win Network Rail £300m engineering design deal

Eastern region deal will include design for Northern Powerhouse Rail
1 day ago

Funding go-ahead for Banwell bypass after fresh cost hike

Galliford Try contract rises £14m to £64m after final design change
2 days ago

Graham wins Southport £75m Marine Lakes Centre

Firm replaces Kier which parted ways with backer Sefton Council
2 days ago

Chancellor unveils extra £2bn capital spend a year

Construction promised a defence dividend in military base and homes upgrade work
2 days ago

McLaren confirms subcontractor team on £135m warehouse job

Work starts on TN2 Gateway site in Kent.
2 days ago

Vistry profits slump after site costs reporting debacle

House builder launches internal whistle-blowing service in business culture review
2 days ago

Severfield chief to step down

Alan Dunsmore to leave structural steel group by end of June
2 days ago

Funding hurdle remains as Lower Thames Crossing gains consent

Government claims £9bn project may start in 2026 as private finance options explored
3 days ago

Mace wins £600m Euston Tower overhaul

1970s tower's foundations and core to be retained as floor plates extended
3 days ago

Summer start for main works on London green tower

Axa sanctions start at 50 Fenchurch Street 36-storey office block
2 days ago

Japan’s leading flats builder JVs with L&G for UK push

Partners plan to build over 1,000 rental homes in London
2 days ago

Wates submits plan for 1,000 homes Harrow council scheme

Former civic centre Poets' Corner site kicks off housing partnership
3 days ago

Morgan Sindall upgrades forecast for next 12 months

Overbury fit-out arm gets off to a flying start in 2025
3 days ago

Restructure underway at Henry Boot Construction

New management team restructures business after drop in turnover
3 days ago

Government pledges £2bn stop-gap funding for 18,000 homes

Funding avoids cliff-edge in social housing delivery before new grant programme agreed
3 days ago

Just two major new roads schemes to start this year

National Highways sets out one-year interim spending plan after RIS3 delay
3 days ago

Plans go in for £400m GRAHAM Manchester site

Demolition and enabling works underway with main construction set to start next year
3 days ago

Building safety levy rate set at up to £10,000 a home in London

Levy introduction pushed back a year to Autumn 2026 - list of new rates
4 days ago

BAM wins £100m revamp of Broadgate Tower in London

Front of tower 3-storey extension to use cross laminate time and re-used steel
4 days ago

£600m funding to train 60,000 construction workers

Government pledges massive cash injection to produce "site-ready" workers
6 days ago

Construction to start in May on £1bn port expansion

Work at London Gateway site will last four years
7 days ago

Contractor services