Mouchel accused over bridge safety checks

Grant Prior 12 years ago
Share

Mouchel has been accused of not carrying out bridge inspection work properly under a £1.56m contract with Milton Keynes Council.

The council has conducted an audit of work by the consultant since 2004.

Auditors claimed general inspections were not delivered according to contract.

Mouchel denied the allegation and said it had met the terms of the “service level agreement” which has now been renegotiated by Milton Keynes Council.

Auditors said they found evidence parts of a maintenance agreement for Milton Keynes’ 1,200 bridges were not being “adequately performed and other parts are disputed by Mouchel”.

A BBC Inside Out investigation found the council hired an external specialist who made 12 inspections and discovered repairs that would cost a minimum of £650,000.

Mouchel told the programme it had kept to the terms of its contract.

The report also criticised Milton Keynes Council for not overseeing the necessary work properly.

Council leader Andrew Geary said a lot of the work had now been brought in-house and a new subsidiary owned by the council hopes to complete it by the end of next year.

Geary told the BBC: “We are getting our bridge inspections up to date and we have done a huge programme of putting things correct.

“Mouchel won’t be carrying out many functions or services for Milton Keynes as of the end of December.”

“We believe bringing this work back in house… is the best value for the taxpayers.

“Yes, we had a fee that we paid them (Mouchel) every year to deliver services for us.

“It was a 12-year deal and we have paid to come out of that three years early.”

In a statement, a spokesman for Mouchel said it had “fully met the requirements” of the agreement it has had with the council since 2004.

“In the past year, Mouchel has completed a significant number of additional general bridge inspections over and above the contractual requirement,” the spokesman said.

The company said it had been asked earlier this year to provide extra services, including a three-year programme of bridge inspections that started in August.

The existing contract with the council, which has been extended by three years to 2018, has recently been “restructured” to provide “greater flexibility” to the council, the spokesman added.


Latest news

Tide gets go-ahead for over 1,000-home London scheme

Volumetric expert gains planning for co-living homes scheme in Southwark
16 hours ago

Construction output flickers into life in March

First quarter activity flatlines after slow start to year
19 hours ago

Skanska lifts margin to 4.3% as profit hits £78m

Infrastructure and FM drive near-tripling of profits
1 day ago

Mayor backs 46-storey student tower at Canary Wharf

City Hall overturns Tower Hamlets council rejection of 912-bed scheme
1 day ago

Plans go in for 100 acre Port of Tilbury expansion

Construction could start next year on site the size of 70 football pitches
18 hours ago

Inland Homes creditors face £38m hit

Administrator confirms no cash for supply chain
2 days ago

Durkan dogged by legacy jobs despite return to trading profit

Durkan scales down new homes contracting to focus on retrofit work
1 day ago

Munnelly founder hands over CEO role to son

Paul David Munnelly steps up to CEO as father becomes chairman
19 hours ago

Barking build to rent towers face rebuild

Major remedial work needed on resi scheme built by Shapoorji Pallonji UK Ltd
2 days ago

London new home starts plunge 38% as Building Safety Act bites

Capital only region to see Q1 fall in NHBC new home registrations
3 days ago

Sureserve swoops for rival compliance outfit Kinovo in £56m deal

Recommended cash offer will take AIM listed contractor private
2 days ago

Crown Golf tees up £1bn plan to build 3,000 homes on course land

Major housing plan for spare land on eight UK courses
2 days ago

Green light for Peterborough Station Quarter £48m revamp

First phase to start before the end of the year
2 days ago

Morgan Sindall starts £38m Caerphilly leisure hub

New swimming pool and health suite forms part of town regeneration plan
2 days ago

145 firms win places on £800m building safety framework

Fusion21 confirms latest winners: Full list
2 days ago

Higgins Homes and site workers face manslaughter charges

Contractor and four site staff charged after woman killed by falling pallet of bricks
4 days ago

Operator spots cracked mast on Hinkley tower crane

Hinkley Point C contractor hit with safety notice over failed mast pin and cracks
3 days ago

Countdown starts for £1bn Birmingham highways bid race

Council will break-up mega framework into five lots
3 days ago

Acciona wins £400m Thames waterworks upgrade

Lea Valley Coppermills water treatment works to get full overhaul
3 days ago

Pension giants pledge £25bn for infrastructure push

Seventeen pension providers pledge to invest in projects
3 days ago

Safety row over London tower ducking fire regs by 30cm

Fire union calls on Mayor to block Bromley flats plan over single staircase
3 days ago

Midgard lands £145m deal to build Edition Birmingham

Construction to start shortly on twin residential towers
4 days ago

McAleer & Rushe set to break £500m turnover barrier

Pre-tax profit jumped 16% to £46m last year
4 days ago

Top design team picked for £2.5bn York Central scheme

Massive city centre regen scheme moves to detailed design
4 days ago

MoD to bid £100m command HQ enabling works

Hertfordshire joint forces command centre expansion advances
4 days ago

Failed shed specialist Marbank owed suppliers £10m

Contractor was facing a string of adjudication claims
4 days ago

New scaffolding training trade body launches

Scaffolding Training Alliance formed amid disquiet caused by planned training changes
3 days ago

£1.8bn framework planned for green retrofit drive

Procure Plus to invite bids later this month
4 days ago

Breakthrough for HS2 as first Birmingham tunnel section dug

Balfour Beatty VINCI completes 3.5-mile TBM drive in 652 days
7 days ago

HS2 Curzon Street station redesign approved as timber roof axed

Change to meet stricter fire safety rules and cut maintenance costs
7 days ago

Contractor services