Worker loses leg in wind farm horror

Grant Prior 13 years ago
Share

A groundworks company has been fined for safety failings after a 20 year-old worker had to have a leg amputated when it was crushed during the construction of Griffin Wind Farm in Perth and Kinross.

Gregor Steele, from Perthshire, suffered severe injuries when his left leg was crushed between a tractor pulling a heavy water bowser and the bucket of a loading shovel on 3 September 2010.

Steele, who had been employed by Gallagher Groundworks since leaving school, was airlifted to hospital where he underwent a nine-hour operation in an attempt to save his leg.

Despite a second operation, this proved unsuccessful and his leg was amputated above the knee on 10 September 2010.

Perth Sheriff Court hear that between 13 August and 3 September 2010 the company failed to make a suitable and sufficient risk assessment for the work being carried out and failed to ensure that the machinery being used was appropriate for the work, was properly maintained and that safety equipment was fully operative.

Steele had positioned the tractor to empty the bowser and used the handbrake on it. There was no parking brake, as this had been disabled by Gallagher Groundwork’s mechanic around five months previously.

As Steele stood between the tractor and the loading shovel, the tractor was dragged backwards by the weight of the bowser, pinning him between the two.

HSE concluded Gallagher Groundworks had failed to ensure that the tractor was capable of safely towing the weight of the loaded water bowser or ensure its ‘parking lock’ braking system was working correctly.

The tractor had a maximum towable mass of three tonnes, well below the weight of the full bowser, estimated at around 12 tonnes.

In addition, the bowser’s drum brakes were in a poor state of repair and could not be fitted to the tractor because the connecting hose was missing.

Gallagher Groundworks of Crieff, was fined £32,000 after pleading guilty to a safety breach.

Steele was unable to work for two years. He has since been fitted with a prosthetic limb and has returned to work for Gallaghers using an automatic tractor.

Following the case, HSE Inspector Kerry Elliot, said: “This was an entirely avoidable incident and the failures by Gallagher Groundworks led directly to this life-changing injury sustained by a young man, aged just 20 at the time of the incident.

“The equipment was not suitable in combination for the work it was being put to and furthermore was poorly maintained with the parking lock actually being disabled rather than repaired.

“Mr Steele has finally been able to return to work but he will endure the after effects of this incident for the rest of his life.”

Latest news

Chief executive Mark Lawrence leaves TClarke

CEO leaves with immediate effect after 40 years at the busines
41 minutes ago

Turnover dips as Laing O’Rourke focuses on bottom line

Pre-tax profits nearly double as Europe Hub surges ahead while Australia stalls
5 hours ago

Cladding retrofit drive faces red alert over delivery delays

NISTA warns acceleration plan looks increasingly difficult as regulator delays, rising costs and social housing pressures mount.
8 hours ago

Galliford Try and Balfour Beatty join forces for £1.9bn A9 race

Firms form Scottish joint venture to target final five dualling packages under new framework set-up
9 hours ago

Diversification paying dividends for brick giant

Specialist contracting division performing well at BRCK Group
8 hours ago

Panattoni gets green light for Southampton logistics site

223,000 sq ft of space to be built at latest scheme
8 hours ago

Bouygues high-rise key worker housing pilot gains consent

Construction due to start next year on landmark London living rent model
9 hours ago

SCAPE starts tender race for £1.2bn regional deal

Up to 12 winners will be chosen for latest framework
1 day ago

JRL back in the black with record order book

Chairman John Reddington says £2bn record pipeline underpins recovery
1 day ago

Worker killed in fall at Birmingham hospital job

BSN Group Construction assisting police and HSE investigation into fatal accident
1 day ago

Stalled £1bn Harlow biosecurity mega project revived

Government launches market engagement after four-year hiatus
1 day ago

HG Construction lands brace of student schemes

Contract wins from Fusion Group in Cardiff and Loughborough
1 day ago

Funding deal sparks £1bn Golden Valley cyber hub build

Bowmer & Kirkland starts £95m first phase after Henry Boot secures finance
1 day ago

Linear Living gets green light for Manchester resi tower

24-storey scheme to be built by Linear Design and Construct
4 days ago

Clegg Construction lands £19m Leicester estate revamp

Work to start by end of year at Stocking Farm estate
1 day ago

Worker dies in fall on Mayfair site

Air ambulance arrives but worker pronounced dead at scene yesterday
4 days ago

Seddon defies sluggish market with profit lift

Operating margin restored to 2.2% despite public sector scheme delays
4 days ago

Green light for ‘poo powered’ eco homes scheme

Yorkshire Water seeks developer for pioneering wastewater powered community
4 days ago

Speller Metcalfe posts record £5m profit as cash pile hits £32m

Midlands contractor lifts profits despite flat turnover with nearly all next year's workload booked
4 days ago

Apprentice joiner crushed to death by falling boards

Company and director in court after renovation site tragedy
4 days ago

Four firms land £300m Scottish electricity network deal

Quartet to upgrade network across north of Scotland
5 days ago

Industry unites to warn new PM against more infrastructure cuts

Twenty eight leaders warn against damaging return to stop-start funding
5 days ago

Funding deal to kick-start Middlewood Locks tower phase

Scarborough JV targets early 2027 start on 909-home phase 4
5 days ago

Hampshire council seeks D&B firm for £100m housing job

Phase two set to start at country's largest council led housing scheme
5 days ago

Margins hit 4.8% as profits triple at Esh Group

Record year for North of England contractor
5 days ago

Labourer dies after scissor lift fall

Court hears falling wall panels knocked worker from machine during demolition work
5 days ago

MoD to split £6.6bn military homes maintenance mega deal

Procurement rethink aims to widen competition and boost SME opportunities
5 days ago

Vistry warns of first-half loss as daily net debt nears £800m

Finance chief to step down in October after new CEO completes strategic plan
6 days ago

Battersea job lifts Sisk to top of contracts league

Infrastructure work buoys top contractor order books in June
6 days ago

Council bosses blast ‘shoddy’ work by failed contractor

£3m of problems found on housing job hit by collapse of Westridge Construction
1 week ago