Joiner knocked down stair void by telehandler forks

Grant Prior 10 years ago
Share

A house builder has been sentenced after a joiner suffered serious injuries when he fell five metres from the second floor of a new development in Alderley Edge.

The 25-year-old from Congleton, who has asked not to be named, was knocked unconscious in the fall down a staircase void and was in hospital for six days as a result of his injuries.

Cheshire Housebuilders Ltd was prosecuted by the HSE following the incident at its Oak Park development on Heyes Lane in Alderley Edge.

Macclesfield Magistrates’ Court heard the joiner had been laying floorboards on the second floor of a five-bedroom detached house when the incident happened on 25 September 2012.

Another worker was using the forks on a telehandler to lift a stack of roof beams onto the second floor when they swung out of control and struck the joiner.

He was knocked down a two-metre square staircase void to the ground below.

His injuries included a fractured wrist, arm and punctured knee. He also needed stitches to his lower lip and tongue.

The HSE investigation found that there were no handrails or other safety measures in place around the void, despite the company’s own health and safety document highlighting this requirement.

There was also no crash decking beneath the joists to catch the workers if they fell through the gaps while they fitted the floorboards.

Cheshire Housebuilders Ltd, of Byley, was fined £10,000 and ordered to pay £3,633 in prosecution costs after pleading guilty to a safety breach.

Speaking after the hearing, HSE Inspector Kevin Jones said: “The joiner suffered serious injuries in the incident but he could easily have been killed in a fall of that distance.

“The workers should never have been allowed to fit floorboards to the second floor before safety measures had been put in place, such as a handrail around the void for the stairs.

“Cheshire Housebuilders identified the need for these measures in its own health and safety document but there was absolutely no point in having the document unless it was going to act on it.”

 

Latest news

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
8 hours ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
1 day ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
8 hours ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
8 hours ago

Aston Villa to revamp North Stand

Club to reuse existing structure rather than complete rebuild
1 day ago

Mace signs ex-ISG director to lead Euro health and tech push

Gary Sweeney to head up healthcare and life sciences consultancy arm
7 hours ago

Sir Robert McAlpine claws way back into profit

Firm says return to profit and strong cash balance validates new strategy
1 day ago

Severfield to cut staff by 6% amid pricing pressure

Steelwork contractor warns of extended tighter pricing due to project delays
1 day ago

JRL completes sale of 50% stake to Malaysian giant IJM

Deal boosts balance sheet and kicks starts growth plan
1 day ago

Green light for £100m Liverpool Baltic station build

Enabling highway works to start in the autumn
2 days ago

First live tests for flying construction robots

Drones can lay construction materials at height on site
1 day ago

Three firms land £170m Gentoo Sunderland housing deal

PHS Solutions, Esh and RE:GEN to deliver 10-year home upgrade plan
2 days ago

Gateway gridlock hits build-to-rent delivery as starts nosedive

Build to rent starts plunge 18% in the capital
2 days ago

Call to shift Gateway 2 checks to end building bottleneck

"The current system isn't working but we all want to see safe buildings"
2 days ago

GBN launches £600m bid race for SMR engineer roles

Owner engineers to provide technical and assurance services
2 days ago

Wates hires ex-Homes England chief to head public sector push

Robert Stone to spearhead its public sector and national frameworks strategy
2 days ago

Acheson Construction collapse costs suppliers £8.5m

One frustrated creditor seized a telehandler after contractor went into administration
3 days ago

Dominus wins go-ahead for 173-bed Glasgow scheme

Old Wynd Street job expected to cost around £25m to build
3 days ago

Safety Regulator misses deadline to clear Gateway 2 backlog

Investors pulling out of funding high rise buildings
3 days ago

CITB still sitting on £95m cash pile

Staff numbers jump from 666 to 763 as training body wage bill soars
3 days ago

£500m road surfacing framework market call

NEPO goes out to consultation on north east regional highways deal
3 days ago

Two share £220m Scottish rail repairs and minor works deal

AmcoGiffen and CPMS win civils and building repair deals
3 days ago

Builder wanted for £60m London leisure and flats job

Tower Hamlets aims to replace St George’s Leisure Centre in Shadwell
3 days ago

Contractor confirmed for business park expansion

Roe Developments to start on next phase of Castle Donington scheme
3 days ago

Driver escapes injury as scaffold collapses onto van

Major three-lift scaffold fall blocks north London high street
1 week ago

Gilbert Ash to be sold to staff

£267m turnover contractor to transition to an Employee Ownership Trust
1 week ago

M Group seals biggest-ever deal with Telent takeover

Digital infrastructure specialist deal lifts turnover to £3bn
1 week ago

Aggregates firm Ashville went down owing more than £3m

Debts revealed in Companies House update
1 week ago

Cardo saves 100 jobs at Breyer roofing arm

Private equity-backed Welsh maintenance group continues to expand
1 week ago

Excavator knocked off lorry going under bridge

Traffic Commissioner inquiry after accident in south London
1 week ago

Contractor services