£400m Marble Arch Tower plan approved

Aaron Morby 9 years ago
Share

Developer Almacantar has been granted full planning for its £400m Marble Arch scheme in London.

Enabling work is now set to get underway in the Autumn and will involve demolishing the existing 24-storey Marble Arch Tower.

A contractor has not yet formally been appointed although Brookfield Multiplex is tipped to win the £180m building job.

This will make way for two distinct new buildings of 18 storeys and 7 storeys in a 400,000 sq ft mixed-use scheme.

Almacantar originally received planning permission last June and submitted revised plans late last year.

These included a greater proportion of office space, transforming the first level of residential area in the Western tower into office area and adding an extra floor of apartments to the top of the tower.

Almacantar will also create a new build multi-screen Odeon cinema and deliver 18,000 sq ft of new retail remains a key aspect of the development.

The affordable housing element of the scheme will be delivered at a different site at 466-490 Edgware Road, where Almacantar is also developing a new mixed tenure housing and retail scheme.

This scheme will comprise 76 homes of which 47 will be affordable. The development will also see the reinstatement of the disused petrol filling station – marking the first new petrol station in London for over 10 years.

Marble Arch Tower
Existing site

Almacantar Marble Arch
New scheme

Kathrin Hersel, Development Director of Almacantar, said: “I am delighted that the revised plans for the Marble Arch Place scheme have been approved. The plans will address The Portman Estate’s requirements. Also, the scheme will deliver much needed additional office floor space and will unlock a very important affordable housing project for the City of Westminster. This gateway location overlooking the finest of the Royal Parks deserves a world class development.”

Latest news

McLaren gets green light for 45-storey Leeds tower

Landmark Wellington Square scheme will see 464 flats built with 360,000 sq ft of offices
1 day ago

Heavy rain causes 1.9% construction output fall

Hopes remain undampened of a resi-led recovery this summer
1 day ago

Taziker restruture to return to profitability after £1.2m loss

Founders bought the business back from private equity after last year's loss
1 day ago

£220m London wharf homes scheme approved

285 homes to be built beside protected Albert and Swedish Wharves in Wandsworth
1 day ago

Major project veteran named civils director for Sizewell C

David Speight previously worked on Hinkley, Heathrow and HS2 client teams
1 day ago

Morgan Sindall lands £19m Milton Keynes hospital job

Crane lifts to be carefully co-ordinated to ensure air ambulance remains active
2 days ago

Clancy bolsters civils leadership team

Daniel Tonkin and Simon Hyams join as operation directors of water and infrastructure
2 days ago

Balfour names new project boss for HS2’s super-hub station

Steve O’Sullivan replaces Nigel Russell who was promoted to CEO of Balfour's HS2 ops
2 days ago

Buckingham Group supply chain hit doubles to £256m

Total owed to unsecured creditors soars as surety providers finalise claims
2 days ago

Builders demand an end to police plant bans

Call to suspend all embargoes on moving mobile cranes and large site kit
2 days ago

Green light for £65m Blackpool multiversity campus

Education campus of 350,000 sq ft will be delivered in phases
2 days ago

Vinci signs £138m Sheffield steel forge expansion deal

Sheffield Forgemasters signs landmark contract after two years of pre-construction works
3 days ago

McAlpine hires HS2 programme boss to head defence arm

Armed forces logistics expert Mike Hickson takes role as MD of defence
3 days ago

£200m carbon capture plan for Deeside site

Energy from waste operator enfinium looking to invest in North Wales plant
2 days ago

McAleer & Rushe promotes five staff to contracts directors

Design and build contractor targets £500m revenue next year
3 days ago

Consultant quartet win Government estate upgrade deal

Government Property Agency selects Arcadis, Tetra Tech, AtkinsRéalis and McBains
3 days ago

Resi towers pioneer to transform Liverpool site

Beetham founder Hugh Frost to help develop 1,200 new homes
4 days ago

Construction Manager of the Year crowned

Galliford Try's Barry Kingscote wins coveted prize: Full list of winners
3 days ago

Landsec £250m London terraced office job approved

Skanska tipped for 20-storey Hill House scheme near Fleet Street
4 days ago

Lendlease tops March contracts league

BAM and ISG rank third with big contract wins
3 days ago

Vistry strikes deal with Homes England for 1,000 units

Firm's timber frames factory will supply most of the Midlands houses
3 days ago

Morgan Sindall go-ahead to build 23-storey Salford resi job

Funding deal with CBRE allows latest project on bank of River Irwell to proceed
4 days ago

Unite Students gains planning for London and Bristol schemes

RG Group will build landmark Stratford tower and Freestone Island projects
4 days ago

Rolls-Royce gets go-ahead for 1.1m sq ft expansion in Derby

Major expansion of Raynesway campus planned to met submarine fleet orders
4 days ago

GMI Construction edges back into profit

A year of controlled consolidation helped generate £0.9m profit but cash at bank dropped to £10m
4 days ago

Balfour gets final sign-off for HMP Highland at £209m

Deal struck for delayed Inverness prison after costs rocket
5 days ago

Renew buys bridge maintenance business

Contractor boosts highways division with £5m acquisition
4 days ago

HS2 tests market for £150m mass transit job

2.4km long elevated Automated People Mover to go out to tender in 2026
4 days ago

Cardo completes fourth acquisition in a year

Expanding Welsh building maintenance specialist reaches £170m turnover
5 days ago

Watchdog clears Heidelberg takeover of Mick George

Four quarries and five ready-mix operations to be sold to meet competition concerns
5 days ago

Contractor services