Barratt to build 1000 homes at West London Nestle site

Aaron Morby 9 years ago
Share

Industrial estate developer SEGRO has selected Barratt London to deliver over 1,000 homes on the former Nestle plant in Hayes, West London.

Former coffee and chocolate factory site in West London
Former coffee and chocolate factory site in West London

The site will also be developed with around 230,000 sq. ft. of modern industrial and urban logistics warehouses

Both partners will work with Hillingdon Council now to obtain planning consent for the major scheme at the former coffee and chocolate factory site.

SEGRO bought the 30-acre site in January in 2015 as part of its strategy to provide high quality urban warehousing to meet the growing demand from occupiers.

Alastair Baird, Barratt London’s Regional Managing Director said: “This year we are set to complete around 2,000 new homes across London and this agreement with SEGRO will boost our pipeline of future projects.

“It demonstrates that our technical capability in delivering complex schemes continues to provide us with a competitive advantage in London.

“Working with SEGRO, we will draw on our experience to design and build a great place to live and work on this important regeneration site in Hayes.”

The site is in a prime location for business and residents located next to the Hayes and Harlington railway station which will become a Crossrail station in 2019. 

Latest news

Civils work fuels fastest output rise in two-and-a half years

Construction buyers see September surge
1 day ago

Renew sells Walter Lilly building arm

100-year-old building business sold to luxury contractor Size
2 days ago

Work to start on Teesside and Merseyside carbon capture schemes

Government commits £22bn funding to world's first industrial-scale carbon capture projects
2 days ago

Flagship £200m London Premier Inn scheme approved

700-bed hotel to be built on the Strand near Trafalgar Square
2 days ago

Kilnbridge appoints new construction director

Former McGee director Darren Wickins joins concrete frame specialist
2 days ago

HS2 trial to replace cement with baked clay

Extra funding for programme to replace cement in concrete with calcined clay
2 days ago

Subcontractors wanted across the South West

Register now for latest Constructionline event in Bristol
2 days ago

Galliford Try profits and revenue surge

Release of delayed building jobs and surging water spend boosts firm
3 days ago

Octavius Infrastructure national expansion push pays off

Revenue leaps 28% to £277m with order book at over £1bn
3 days ago

Skanska staff get access to digital doctors

Contractor launches benefit for staff and their families
3 days ago

Another new name for former Kier Living housing arm

Tilia Homes and Hopkins Homes now known as untypical
3 days ago

Danny Sullivan Group buys M&E recruitment firm

Acquisition boosts presence in infrastructure sector
3 days ago

Sisk in talks to finish ISG’s £200m Teesside vaccine plant

First big job to restart since crash of ISG nearly two weeks ago
4 days ago

Wates snaps up 1,100-staff social housing upgrade contractor

Liberty deal spearheads push into heating and compliance market
5 days ago

Go-ahead for Liverpool film studios and museum jobs

£60m Littlewoods film studio and £58m museum revamp approved
4 days ago

London RC frame specialist goes under

Bela Structures had a 100-strong workforce at peak
3 days ago

VolkerWessels lifted by marine arm’s return to profit

Group operating margin slips to 2.5% in challenging year
4 days ago

United Living appoints Director of Water

Scott Beard joins from Welsh Water where he was head of engineering
4 days ago

HE Simm eyes return to profit after £10m loss

£4m family cash injection helps engineering division rebound
5 days ago

Dragados lands Elephant & Castle tunnel deal

Work to start next year on excavating 135m of new passenger tunnels
4 days ago

Caddick bolsters Midlands construction team

John Currie and Ian Calder to oversee operations in region
5 days ago

Angry staff call for investigation into collapse of ISG

Former staff say business began to unwind two years ago amid management failures
5 days ago

Direct labour model lifts Clancy to record revenue

Pre-tax profit jumps 55% to £21m from £379m revenue
5 days ago

Tyne Coast College put firms on alert for £60m campus job

Tenders set to be invited for South Shields town centre college campus
5 days ago

Costain trials project carbon tracker

Online tracker helps contractor measure emissions across supply chain
5 days ago

Sisk starts £80m Manchester Ancoats resi blocks

Jersey Wharf and Eliza Yard will provide 316 flats
5 days ago

Rayner scraps London housing plan review

Mayor's annual target hiked to 81,000, up from 37,000 delivered in recent years
6 days ago

Vp lands rail supply deal with Balfour Beatty

Torrent Trackside division wins two-year deal
5 days ago

L&G modular homes amassed loss hits £359m

Firm still counting cost of failed foray into modular homes
6 days ago

£200m Wimbledon tennis courts expansion approved

Plan includes 8,000 seat covered show court alongside 38 more courts
6 days ago

Contractor services