Demolition starts for £400m Marble Arch Place

Aaron Morby 5 years ago
Share

Demolition contractor Erith started work today on a landmark tower overlooking London’s Hyde Park to make way for developer Almacantar’s £400m Marble Arch Place mixed-use scheme.

Brookfield Multiplex was also today confirmed main contractor for the scheme under a contract thought to be worth around £180m. 

The existing 1960’s building will be replaced by a residential, office and retail scheme, scheduled for completion in 2020.

Marble Arch Tower

Existing site

Almacantar Marble Arch

Vinoly designed mixed-use development

Designed by renowned architect Rafael Vinoly, and interior designers, Millier London, the development consists of an 18-storey residential tower, with 54 apartments and a 7-storey commercial building providing a total of over 95,000 sq ft of offices.

Almacantar will also create a new build multi-screen Odeon cinema and deliver 18,000 sq ft of new retail remains a key aspect of the development.

The affordable housing element of the scheme will be delivered at a different site at 466-490 Edgware Road, where Almacantar is also developing a new mixed tenure housing and retail scheme.

Kathrin Hersel, property director, Almacantar said: “Marble Arch Place will be a stunning new landmark for London – an enviable residential and commercial address where the sophistication of Mayfair meets the calmness of Hyde Park. The scheme’s design and position makes it a prominent new addition to a flourishing West End.”

Latest news

Construction output surge sees cost inflation hit record high

Buyers report rises in input costs hit near 25-year high as materials shortages bite
7 hours ago

Fire at tower days before Grenfell-style cladding due to be removed

More than 40 people injured during blaze at 19-storey building
3 hours ago

Firms shortlisted for £140m Havant reservoir

Balfour, Hochtief and Mackley/Jones JV hunt main reservoir package
10 hours ago

Blackstone makes £1.2bn bid for St Modwen

Investment giant set to acquire big name developer
10 hours ago

London Chalcots towers £100m reclad out to bid again

Camden Council hopes to let Swiss Cottage estate reclad before the end of this year
1 day ago

Balfour facing strike ballot over “insulting” pay offer

Industrial action ballot planned for workers on £1.5bn Central Rail System Alliance contract
1 day ago

Hill wins 142-home McArthurs Yard job in Bristol

Housing contractor bags first Bristol job at harbourside site
1 day ago

BarhaleDoosan to build organic waste water treatment works

Natural integrated wetland to be built at Clifton wastewater treatment works
9 hours ago

London Nine Elms 12-storey office approved

Construction to start this summer at former Royal Mail site
10 hours ago

Fresh price hike takes structural steel to £800 per tonne

Seventh price hike since last July sees steel sections rise by £50/t
1 day ago

Barratt problem concrete frames and cladding bill hits £163m

House builder sees demand and construction surge but legacy property charges rise
1 day ago

Materials shortages threatening pace of rebound

RICS survey reveals confidence running high but shortages could put brakes on recovery
2 days ago

Henry Boot rejigs senior management

New MDs appointed to head construction and plant operations
1 day ago

Procure Plus plans £1.3bn low carbon housing framework

Firms wanted to supply or fit solar panels and air and ground source heat pumps
1 day ago

Keltbray sells electrical engineering arm to management

MBO at Keltbray Lagan Power three years after contractor acquired majority stake in business
2 days ago

BAM awards £150m worth of Manchester arena packages

North West subcontractors win top billing at Co-op Live project
2 days ago

Contractor Kilnbridge sold to 800-staff ownership trust

Founder of £90m East London contractor sells to workforce trust
2 days ago

ISG chalks up £48m haul of school wins

Deals include a £12m pathfinder 'net zero' school in Bristol
2 days ago

Green light for £37m Dawlish train rockfall shelter

Work to start on 209m long track protection structure this August
2 days ago

Keltbray posts £9.4m loss due to Covid and restructuring

Specialist contractor confident about future with £25m net cash and £224m order book
3 days ago

Construction start date for £200m Basildon scheme

Work to start this autumn on Essex site being developed by Inland Homes and Homes England
2 days ago

New Buro Happold chief to double staff in six years

James Bruce aims rapidly to grow engineering consultant into a global player
3 days ago

Atkins raids Skanska for new finance director

Jo Jarman returns to consultant as new finance director
3 days ago

Kier wins £15m Braintree enterprise centre

Building work at Great Notley to start later this month
3 days ago

Big name concrete firms miss out on major HS2 deal

Skanska Costain Strabag JV awards major package to Kelly Formwork
3 days ago

Covid shakes-up Top 30 M&E contractors rankings

Several M&E firms grow despite 9% fall in revenue last year among top 30 specialists.
3 days ago

Bylor builds second Hinkley reactor shell a third faster

Next massive prefabricated steel ring section for reactor building lifted in by Big Carl
3 days ago

Plans in for 700-bed Nottingham student scheme

Next phase of The Island Quarter scheme submitted for approval
3 days ago

M Group rebrands Skanska highways arm as Milestone

New business launched as £50m takeover deal signed off
4 days ago

Henry Boot to start £110m Walsall logistics project

Remedial works to start at 620,000 sq ft Phoenix 10 logistics scheme
4 days ago

Contractor services