McAleer & Rushe plans 21-floor Sheffield student scheme

Aaron Morby 6 years ago
Share

McAleer & Rushe has submitted plans to build a major student accommodation and office project in Sheffield city centre.

Architect Urban Innovations designed the city centre scheme
Architect Urban Innovations designed the city centre scheme

The 21-storey mixed-use development next to the Jurys Inn hotel at Furnival Square will offer 412-bed spaces for students above ground floor and first floor offices.

The site was previously the home of Office World, which has now been demolished after previous planning for an office scheme was granted.

McAleer & Rushe will act as both developer and builder on the project, which has been designed by architect Urban Innovations and will use a brick cladding system for the building envelope.

A report in support of the fresh plans for the site submitted by WSP said that while the level of office development has been reduced compared to the previously approved scheme, it believed that any harm from the reduction in office space was outweighed by the overall benefits of the scheme, including the level of student accommodation given that the development is located adjacent to Sheffield Hallam University in a highly sustainable location.

 

Latest news

Race for £100m Immingham ferry terminal job

AB Ports aims to start work in mid 2023
20 hours ago

Sisk wins Stockport £60m Weir Mill restoration

Work to start next month on 250 flats scheme
21 hours ago

Developer swoops for 1,000-flats landmark Leeds site

Revised plans to be submitted by the end of the year for start soon after
1 day ago

Dominvs seals £173m funding for 713-bed student job

HG Construction to start major Hammersmith student complex in November
2 days ago

Briefings start for £1bn Midland Mainline Electrification plan

Market engagement starts for next seven sections covering 139km route to Sheffield
20 hours ago

Forterra pushes back £27m factory refurb plan

Supply chain shortages hit project as brick prices rose another 12% last month
21 hours ago

Speedy Hire results slowed down by KPMG

Hire giant left "frustrated and disappointed" by delay request from auditor
21 hours ago

London office starts set to surge over next 6 months

Deloitte Crane Survey predicts jump in starts in Capital despite high building costs
2 days ago

Fit-out firm BW Workplace slips into the red

£5.2m backdated R&D tax credit deal lifts after tax performance
2 days ago

Hinkley Point delayed another year as costs rise by £3bn

Covid blamed for construction delays and cost increases
5 days ago

Competition probe launched into Bouygues’ Equans takeover

Bouygues is hoping to finalise acquisition later this year
2 days ago

TfL seeks developers for trio of over-station sites

Plum sites at Bank, Paddington and Southwark come with consent for 600,000 sq ft
2 days ago

Underwater drone used to check offshore wind farm foundations

Underwater robots deployed for inspection and maintenance work
2 days ago

DfE to unveil plans for school procurement shake-up

Supply chain summit to be held next month in Birmingham on future of schools frameworks
5 days ago

Plan for £100m clifftop hotel and flats in Newquay

Developer Salboy's landmark scheme to go in for planning shortly
5 days ago

Top 30 M&E contractors set for growth – ranking

Major M&E firms prepare for work surge after riding out pandemic
5 days ago

Former Mace boss joins Taylor Wimpey board

Mark Castle takes on another non-exec role
5 days ago

ISG starts £28m duo of Yorkshire leisure centre jobs

Harrogate and Knaresborough leisure centre jobs get underway
5 days ago

HS2 workforce surges to 25,000 jobs milestone

Over 2,500 firms form the HS2 supply chain
5 days ago

Green light for 1.4m sq ft Yorkshire logistic hub

Work at the site, located 24 miles from Leeds city centre, is expected in September.
5 days ago

Contractors lift tender margins to 9% on bids in the Capital

Developer Landsec to press ahead with trio of London office schemes this year despite cost inflation
6 days ago

Fire safety work plunges Countryside to £182m loss

Countryside Partnerships forms dedicated division to handle retrofits on a 123 buildings
6 days ago

Site wages row looms as union dismisses “derisory” pay offer

Unions want 10% increases but employers offer less than 4%
6 days ago

Fusion wins Manchester high rise student block appeal

Planning inspector overturns city council refusal for 28-storey Deansgate block
6 days ago

Failed London fit-out specialist owed trade firms £13m

Twenty 1 Group owed HMRC £9.7m leaving more than 300 firms with no hope of payment
6 days ago

Demolition work imminent on half-built Taylor Wimpey flats

Angry local residents share pictures of site set to be torn down
6 days ago

B&K returns to strong profit growth across the group

Pre-tax profit jumps 23% to £65m as revenue edges up to £1.18bn
7 days ago

British Land expects tender price inflation to hit 10%

Developer says 91% of costs are fixed on planned schemes
7 days ago

Morgan Sindall set for £80m leisure and health hub

West Suffolk public service development to be built at no extra cost to tax payers
7 days ago

Plans in for £500m Hollow Mountain pumped hydro scheme

Work removing 2m tonnes of rock could start within two years
1 week ago

Contractor services