London wharf saved for concrete batching plant

Aaron Morby 9 years ago
Share

An East London wharf will be returned to operation after the Port of London Authority secured the site as a planned new centre for heavyside building materials.

Independent building material firm Brett Group will now take a long lease on the site to build a much-needed materials handling facility to supply London development.

But the deal has thrust Brett Group into conflict with Galliard Homes, which owned the whole Peruvian Wharf site and still plans to build nearly 950 flats directly behind the aggregates and batching plant facility.

Brett has just objected to Galliard’s detailed planning application warning that its design fails adequately to take account of noise and air quality issues, particularly regarding its future business needs to work unsociable hours to maximise use on Thames tides.

The wharf has been protected since 1997 under the Mayor of London’s policy to safeguard strategically placed wharves for cargo handling.  

The port authority has now completed the £3m acquisition of the site after a long battle over the wharf’s planning status, subsequently acquiring the site when the former landowner didn’t reactivate it for cargo-handling.

“We’ve fought long and hard to get Peruvian Wharf back into use,” said PLA chief executive, Robin Mortimer. 

“The river will play a key role in servicing the construction of at least 260,000 new homes and communities, offering 360,000 jobs. 

“This will help keep tens of thousands of lorries off London’s roads every year, reducing air pollution and improving local people’s quality of life.” 

Brett will develop an integrated terminal on the site, which is expected to be operational late in 2017.

Galliard Homes is planning to build nearly a thousand flats in three clusters of blocks just behind the facility, next to the West Silvertown DLR station.

Peruvian Wharf

Mike Watson, Technical & Architectural Director at Galliard Homes, said: “The PLA has long had an option to purchase this land and we very much welcome the riverside part of the site finally being bought back into use.

“We recently submitted plans for the remaining parts of Peruvian Wharf for high quality residential development delivering 940 new homes as well as a new public square and commercial space around West Silvertown DLR station.

“The proposals have been specifically designed to co-exist successfully with a working wharf and to ensure there is a comprehensive approach to bring the site back into use as it is an important part of the GLA’s emerging Royal Dock’s planning  framework.”

Peruvian Wharf

Galliard Homes is planning to build three linked housing blocks next to the Peruvian Wharf site

Peruvian Wharf

Peruvian Wharf site with safeguarded wharf areas and development site marked

 

Latest news

HS2 first as giant bridge slid across live motorway

Watch timelapse footage of pioneering 4,600-tonne viaduct installation
2 hours ago

Gilbert Ash breaks ground on £120m Wilde aparthotel

Staycity’s biggest London scheme gets underway in Shoreditch
2 hours ago

Bennett wins brace of retirement home deals

Contractor to build more than 200 apartments for investor Octopus Capital
2 hours ago

Developer showed “total disregard” for site safety

Property firm fined £45,000 for failing to meet basic standards
2 hours ago

Watkin Jones takes £8.7m hit but eyes brighter 2026

A £2bn pipeline and stronger deal flow help rebuild confidence after a year of impairments
2 hours ago

Project manager caught running false invoice scam

Suspended sentence and ban for director after probe into offices to resi scheme
21 hours ago

Cardo nails £52m Sussex council homes roofing deal

Firm beats 14 rivals to take Lewes and Eastbourne roofing programmes
1 day ago

Bachy turnover sinks by over £100m as HS2 surge fades

Piling specialist reports slow year as mega projects step down
1 day ago

Van Elle finds buyer for loss-making Canadian arm

Two-year North America foray ends with £2.6m exit deal
1 day ago

£100m student halls to replace derelict London Crown Court

IQ student project gets go-ahead at Blackfriars court building site
1 day ago

Safety green light for Newcastle student scheme

Gateway 2 approval process delays construction start by a year
1 day ago

Plans go in for next phase of Manchester Waters

New neighbourhood planned for island site
1 day ago

JRL names new fit-out lead to drive expansion

Graham Ardley steps up to drive next phase of commercial and residential growth
1 day ago

Construction output yo-yos as growth falters again

Quarterly output down 0.3% amid cautious investor sentiment
4 days ago

Free school build plans axed to fund £3bn SEND expansion

Education secretary scraps 28 free schools to plug SEND shortfall
4 days ago

McLaren seals £160m funding for Manchester student tower

737-bed Upper Brook Street student scheme forward funded by L&G
4 days ago

Former McAlpine boss lined up for Royal BAM board role

Paul Hamer to replace Paul Sheffield on Dutch group supervisory board
5 days ago

Plans go in for £650m retail park to resi scheme

Construction could start in early 2027 on new neighbourhood for Lewisham
5 days ago

Lovell launches Midlands refurb division

Renew Central to be headed by Carl Yale
4 days ago

M Group muscles into top five contractors after growth spurt

Private-equity backed infra giant builds £8.8bn work mountain
5 days ago

Plans in for first major build phase of £2bn York Central scheme

Developers table plans for nearly 1,000 homes, parkland and York’s new western station gateway
5 days ago

Lords push for staged Gateway 2 approval to aid design and build

Inquiry warns BSR’s over-detailed Gateway 2 demands are freezing D&B process
5 days ago

CITB wage bill tops £52m as staff numbers jump 13%

Accounts show 182 people at training body earn £60,000+ a year
5 days ago

Peterborough electrical specialist files administration notice

EML Electrical Contractors lodges court notice
5 days ago

Ant Yapi UK lands latest Chelsea Barracks deal

Fit-out work on Building 7 will last until summer 2027
5 days ago

Go-ahead for plan to level Cambridge retail park for life-science hub

Minister overturns council refusal as Railpen’s scheme promises £600m economic uplift
6 days ago

Subcontractor competition keeps build costs flat at Berkeley

"Highly competitive tendering" expected to continue next year
6 days ago

Industry calls grow to scrap the CITB

Latest training cuts final straw for a lot of contractors
7 days ago

Green light for major Oxford Circus mixed use scheme

Construction to start in 2029 on revamp of BHS and London College of Fashion site
6 days ago

Coventry to back build of Very Light Rail street pilot

Council set to approve 800m twin-track route in push for rapid-build transport revolution
6 days ago