Vast Barking shopping mall rebuild approved

Aaron Morby 8 years ago
Share

Local planners have given the green light for the wholesale redevelopment of the Vicarage Field Shopping Centre site in Barking town centre in east London

A cluster of five high-rise buildings will stand around a central pedestrian area
A cluster of five high-rise buildings will stand around a central pedestrian area

Property investor Benson Elliot and development managers Londonewcastle are planning to clear the shopping mall site for a major mixed-use scheme of around 900 homes, a primary school, cinema, 300-capacity music venue and 150-room hotel.

Designed by architect Studio Egret West, the five-acre plot in the town centre will see five central buildings rising from 13 to 36 floors from two large footprint podium buildings containing the retail and leisure space.

Peter Cornforth, Director of Retail at Benson Elliot, said: “We welcome the council’s decision to grant outline planning permission for the redevelopment of the Vicarage Field Shopping Centre site in Barking town centre.

“This comprehensive redevelopment of the site will deliver new homes for the borough as well as a host of shopping, leisure and community facilities and up to 1,000 new jobs, all of which will significantly benefit the local area.”

Barking town council, which is currently recruiting board members to a new regeneration company called Be First, believes the new scheme will provide a huge boost to economic development in the borough, which is already planning 42,500 new homes and 10,000 new jobs over the next 20 years.

Vicarage Field barking town centre

View from Barking Station of town centre scheme

Vicarage Field barking town centre

Internal pedestrian area containing shops and leisure facilities beneath housing blocks

In approving the outline scheme,  councillors agreed to a range of safeguards on noise and construction methods to minimise disruption to local residents and to local businesses. 

They also specified that the detailed design would have to meet the Design Code to ensure that the development is of an exemplary quality to justify the location, heights and density.

In order to secure outline planning permission, the application now needs to be referred back to the Mayor of London for a final rubber stamping.

Latest news

80 energy projects unlocked as Ofgem backs grid expansion

£24bn energy networks deal gets green light from regulator
19 hours ago

New boss at Eric Wright Civil Engineering

Gavin Hulme takes top job as Diane Bourne moves to group role
4 hours ago

Pinewood submits £1bn data centre plan

Studio giant adds green and learning spaces to tech hub blueprint
20 hours ago

Record results after TClarke goes private

Britain's biggest M&E contractor flourishes after de-listing
20 hours ago

Dalkia lands £200m nuclear maintenance deal

1,000 nuclear FM staff to join M&E contractor
20 hours ago

Construction comeback to outpace wider economy

Arcadis forecast fueled by spending review optimism
2 days ago

First steel goes up on giant car battery site

Severfield gets to work on McAlpine Somerset site
2 days ago

Permasteelisa wins cladding deal on Bovis city tower

Facade specialist lands package at 60 Gracechurch Street
20 hours ago

Fox buys recycled asphalt specialist Fisher

Acquisition adds major recycled asphalt capacity in north west
2 days ago

Major Building Safety Regulator shake-up to end tower delays

HSE stripped of control and top fire chiefs brought in to fast-track stalled schemes
2 days ago

Hinkley trio sign Sizewell civils deal

Balfour,Bouygues and Laing O'Rourke form Civil Works Alliance for new power station
2 days ago

£3.9bn data centre plan for Ravenscraig steelworks

Green energy to power massive new steel to silicon AI campus
2 days ago

Breakthrough on HS2’s second longest tunnel

8.4 mile Northolt to Old Oak Common drive completes
2 days ago

Neilcott on fast-track to debt-free employee ownership

£22.5m loan nearly paid down after big profit year
2 days ago

TfL kicks off race for £700m Tube station upgrade

South Kensington and Elephant & Castle top the pipeline list
2 days ago

Corbyn Plant Hire fleet goes under the hammer

Kit to be sold off by sister firm to collapsed groundworks contractor
2 days ago

Government wields procurement stick on late payment

New rules would block slow payers from bidding on big public jobs
5 days ago

Hercules buys power line labour firm for £15.7m

Labour supply specialist snaps up Advantage NRG to tap booming electricity upgrade market
5 days ago

Universal bid to fast-track planning for theme park

Entertainment giant eyes 2026 start at Bedford site
5 days ago

Developer Breck to transform former Ibstock brick factory

Ravenhead works to become 300-home development
5 days ago

SP Energy Networks awards contracts worth £1.4bn

First round of awards under £5.4bn national electricity grid upgrade programme
6 days ago

Travelodge to convert Liverpool Street office building

Office-to-hotel conversion in City of London
5 days ago

Plans lodged for 1m sq ft City of London office

Barbican landmark building will reuse 40% of existing structure
6 days ago

PTSG acquires roofing specialist HD Sharman Group

Premier Technical Services Group expands building maintenance division
5 days ago

Balfour Beatty lands £833m carbon capture power plant job

Work to start later this year on Teesside carbon capture gas-fired power station
6 days ago

Svella agrees deal to save Cubby Construction

Solvent purchase set to save 214 jobs and protect supply chain
6 days ago

J Coffey holds line on margins despite £52m revenue slide

Pre-tax profit down 14% but firm eyes strong pipeline to bounce back
6 days ago

Consultants called up for £2.3bn NHS SBS panel reboot

Market asked for views ahead of next-gen procurement rollout
6 days ago

Hochtief launches new UK data centre division

German business model to be introduced for UK construction
7 days ago

Construction skills body launches with 100,000 worker target

Industry to work closer with Jobcentres to find new talent
6 days ago