Construction firms slammed for corporate silence in Grenfell Inquiry

Aaron Morby 7 years ago
Share

Key firms involved in refurbishing Grenfell Tower have been accused of attempting to derail the public inquiry with a wall of corporate silence.

Stephanie Barwise QC, representing survivors and the bereaved, launched a broadside against the construction companies involved
Stephanie Barwise QC, representing survivors and the bereaved, launched a broadside against the construction companies involved

Design and build contractor Rydon, its subcontractors and suppliers have refused to comment on their work and the key issue of compliance claiming they need more information or are unable to provide information now.

Stephanie Barwise QC, representing survivors and the bereaved, launched a stinging attack on the construction firms at the public inquiry

She said: “It is inhumane to remain silent when so many seek understanding and answers, answers which are within the corporates’ gift.

“Despite their words of condolence to the victims, these corporates have no desire to assist this inquiry, even though their participation could save lives in the immediate future.

“The inability to produce a basic account of how, if  at all, they considered Grenfell Tower complied with the Building Regulations is itself indicative of the culture of non-compliance which Arup’s fire expert Dr Lane has identified.”

Her criticism was echoed by Pete Weatherby QC, who warned them: “This is a public search for the truth.  It’s not a game of cat and mouse. 

“We call on all of the corporates who have yet to do so to set out most fully their positions in their opening statements.”

Barwise said: “Rydon, the main contractor under a design and build contract, is being obtuse in arguing, as it does in its position statement, that it was not responsible for critical decisions.

“Whether or not others had suggested or dictated the use of certain materials, Rydon would anyway have been under an obligation implied either by the design and build contract and/or the preconstruction agreement to warn Royal Borough of Kensington and Chelsea if the materials were unsuitable or hazardous or non-compliant.”

She revealed that architect Studio E’s specification had previously required higher quality materials than were in fact used. 

Fire resistant Celotex, FR5000 not RS5000, was specified originally, and the rainscreen cladding proposed for the spandrel and column panels was an aluminium honeycomb core bonded between two zinc skins.

“Rydon was asked to submit alternative costs for Reynobond over Alucobond and zinc but, as detailed designer of the cladding, it would have been for Rydon or its subcontractors to consider the degree of  resistance to fire necessary and to warn if it considered them insufficient,” she added.

“It is therefore disingenuous of Rydon to suggest that someone else made all the critical decisions before it became involved and  it was stuck with them.

“No doubt others may share responsibility, but attempts such as this to reduce the significance of Rydon’s role are misleading.”

She added: “As to Rydon’s subcontractors, CEP, the subcontractor which purchased and fabricated the Reynobond panels, claims it cannot participate at all until it has had full disclosure. 

“If CEP wishes not to incriminate itself, that is its choice, but it is disingenuous for CEP to plead inability to comment on the compliance of its own work.  The same applies to Harley (the cladding contractor), as it does also to Studio E.

“These parties make no comment on the detailed criticisms of their work, nor do they even comment on drawings which they themselves drafted.”

Barwise said: “The time has come – indeed, is overdue – for the contractors and suppliers to clearly state their positions, and also to respond to the positions taken by others. 

“Their stance that they need more than the documents they already have before engaging at all with any of the criticisms made of them is demonstrably untenable and disingenuous.

“These contractors should not be allowed, by their deliberate refusal to participate, to derail determination of the compliance issue, even though we are concerned with blatant non-compliance.”

 

 

Latest news

London new home starts plunge 38% as Building Safety Act bites

Capital only region to see Q1 fall in NHBC new home registrations
4 hours ago

145 firms win places on £800m building safety framework

Fusion21 confirms latest winners: Full list
12 minutes ago

Higgins Homes and site workers face manslaughter charges

Contractor and four site staff charged after woman killed by falling pallet of bricks
1 day ago

Operator spots cracked mast on Hinkley tower crane

Hinkley Point C contractor hit with safety notice over failed mast pin and cracks
8 hours ago

Countdown starts for £1bn Birmingham highways bid race

Council will break-up mega framework into five lots
8 hours ago

Acciona wins £400m Thames waterworks upgrade

Lea Valley Coppermills water treatment works to get full overhaul
8 hours ago

Pension giants pledge £25bn for infrastructure push

Seventeen pension providers pledge to invest in projects
7 hours ago

Safety row over London tower ducking fire regs by 30cm

Fire union calls on Mayor to block Bromley flats plan over single staircase
8 hours ago

Midgard lands £145m deal to build Edition Birmingham

Construction to start shortly on twin residential towers
1 day ago

McAleer & Rushe set to break £500m turnover barrier

Pre-tax profit jumped 16% to £46m last year
1 day ago

Top design team picked for £2.5bn York Central scheme

Massive city centre regen scheme moves to detailed design
1 day ago

MoD to bid £100m command HQ enabling works

Hertfordshire joint forces command centre expansion advances
1 day ago

Failed shed specialist Marbank owed suppliers £10m

Contractor was facing a string of adjudication claims
1 day ago

New scaffolding training trade body launches

Scaffolding Training Alliance formed amid disquiet caused by planned training changes
1 day ago

£1.8bn framework planned for green retrofit drive

Procure Plus to invite bids later this month
1 day ago

Breakthrough for HS2 as first Birmingham tunnel section dug

Balfour Beatty VINCI completes 3.5-mile TBM drive in 652 days
4 days ago

HS2 Curzon Street station redesign approved as timber roof axed

Change to meet stricter fire safety rules and cut maintenance costs
4 days ago

Care home fire trial collapses

Prosecution withdrawn against four firms including Morgan Sindall Property Services
5 days ago

Leicester rebids £22m station revamp after failed tender race

Council opts for ECI route after receiving one bid for project
4 days ago

Kier wins £58m East Coast College rebuild job in Great Yarmouth

Work to start this summer for 1,300-student college
4 days ago

R G Carter wins £28m hospital car park job in King’s Lynn

MSCP paves way for £1.5bn Queen Elizabeth Hospital rebuild in 2027
4 days ago

London to relax green belt building rules

Sadiq Khan shifts position on planning
4 days ago

Willmott Dixon wins Great Yarmouth waterfront deal

North Quay 10.5 acres mixed-use scheme to advance
5 days ago

SIG chief quits to join Travis Perkins

Gavin Slark to leave by the end of this year
4 days ago

Eight take key spots on £250m Prosper framework

Housing and public building upkeep deal for North East awarded
5 days ago

Early call-out for £150m Ebbsfleet Garden City infrastructure

Bidders day to set out plan for Ebbsfleet Central commercial scheme
6 days ago

McLaren storms April contracts league with flurry of wins

Cardiff Bay Arena job headlines a series of big contract wins
5 days ago

Balfour Beatty lifts cash forecast after strong first quarter

Contractor set to hit £1bn average monthly net cash in 2025
5 days ago

Goldman Sachs-owned Adler & Allan buys 180-strong civils outfit

West Country's Glanville Environmental gets new owner
5 days ago

Caddick lands first contract for £200m Skelmersdale revamp

Developer gets green light for masterplan
5 days ago

Contractor services