Plans for 17-storey Manchester Maldron hotel

Aaron Morby 6 years ago
Share

Property investor Catalyst Capital has revealed plans to build a new 4-star hotel in Manchester city centre.

Hotel site is opposite Circle Square
Hotel site is opposite Circle Square

The 17-storey hotel will boast 278 rooms, a restaurant and bar and will be located in close proximity to Oxford Road train station.

Maldron Hotels – part of Irish hotel operator Dalata – will operate the hotel, which is set to open in the summer of 2021.

Catalyst Capital, which has significant property interests in Manchester, is on course to submit a full planning application to the city council towards the end of January.

Bardsley Construction is presently building a Stay City Apart Hotel for the property firm at Cross Street in Manchester.

The proposed site is dissected by Mouncey Street and is home to a 40-space surface car park and four-storey commercial building at 60 Charles Street, which will be replaced by the hotel.

Manchester architect SimpsonHaugh has designed the hotel.

Dan White, Development Director – Catalyst Capital, said: “Given the key location opposite the Circle Square masterplan area and close to the Oxford Road Corridor, the site presents an excellent opportunity for enhancement.

“The proposals will help to reinforce a key east-west route, connecting key regeneration initiatives spanning HS2/Mayfield/North Campus to the north, and, Oxford Road Corridor, First Street and Great Jackson Street to the south.”

Under present plans construction work would start in September 2019 if planning is approved in June as hoped.

 

Latest news

Four jailed after Keltbray corruption trial

Jail sentences following probe into jobs including Battersea Power Station
5 hours ago

Leeds United unveil stadium revamp design

Club has still to set a timeframe for staged Elland Road upgrade
2 hours ago

Bowmer & Kirkland boosts margins as profits surge to £69m

Revenue nudges up towards £1.3bn in year of expansion
19 hours ago

Offshore construction starts on £4bn windfarm

Foundations for first of 95 turbines installed: Watch video
18 hours ago

AECOM buys civils consultant Allen Gordon

Global giant acquires Scottish water and energy specialist
18 hours ago

Plans in for £1bn Northern Gateway site in Manchester

Plan for 500-acre manufacturing and logistic park advance
18 hours ago

RED wins £31m London Shoreditch student digs job

Two extra floors will be added to Willen House scheme
19 hours ago

Deconstruct handed £12m Grenfell demolition

Firm maintaining building awarded job without bid race to speed process
19 hours ago

Sizewell site workers get made to measure PPE

Bespoke fitting service on offer at new Bryson branch
19 hours ago

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
4 days ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
5 days ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
4 days ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
4 days ago

Aston Villa to revamp North Stand

Club to reuse existing structure rather than complete rebuild
5 days ago

Mace signs ex-ISG director to lead Euro health and tech push

Gary Sweeney to head up healthcare and life sciences consultancy arm
4 days ago

Sir Robert McAlpine claws way back into profit

Firm says return to profit and strong cash balance validates new strategy
5 days ago

Severfield to cut staff by 6% amid pricing pressure

Steelwork contractor warns of extended tighter pricing due to project delays
5 days ago

JRL completes sale of 50% stake to Malaysian giant IJM

Deal boosts balance sheet and kicks starts growth plan
5 days ago

Green light for £100m Liverpool Baltic station build

Enabling highway works to start in the autumn
6 days ago

First live tests for flying construction robots

Drones can lay construction materials at height on site
5 days ago

Three firms land £170m Gentoo Sunderland housing deal

PHS Solutions, Esh and RE:GEN to deliver 10-year home upgrade plan
6 days ago

Gateway gridlock hits build-to-rent delivery as starts nosedive

Build to rent starts plunge 18% in the capital
6 days ago

Call to shift Gateway 2 checks to end building bottleneck

"The current system isn't working but we all want to see safe buildings"
6 days ago

GBN launches £600m bid race for SMR engineer roles

Owner engineers to provide technical and assurance services
6 days ago

Wates hires ex-Homes England chief to head public sector push

Robert Stone to spearhead its public sector and national frameworks strategy
6 days ago

Acheson Construction collapse costs suppliers £8.5m

One frustrated creditor seized a telehandler after contractor went into administration
6 days ago

Dominus wins go-ahead for 173-bed Glasgow scheme

Old Wynd Street job expected to cost around £25m to build
6 days ago

Safety Regulator misses deadline to clear Gateway 2 backlog

Investors pulling out of funding high rise buildings
7 days ago

CITB still sitting on £95m cash pile

Staff numbers jump from 666 to 763 as training body wage bill soars
7 days ago

£500m road surfacing framework market call

NEPO goes out to consultation on north east regional highways deal
7 days ago

Contractor services