Government commits to net zero carbon by 2050

Aaron Morby 5 months ago
Share

The UK is to become the first G7 nation to set a legally-binding target to achieve net zero carbon emissions by 2050.

Prime Minister Theresa May announced Government will tomorrow lay a statutory instrument before Parliament that will amend the Climate Change Act and introduce a  net zero emission target.

Presently the country is committed to cut greenhouse gas emissions by 80% by 2050.

According to the Committee on Climate Change, which recommended the move in its recent report, the industry has little more than 10 years to take all new buildings over to net zero carbon if the goal is to be met.

The commitment will also need wholesale changes to energy generating infrastructure and big changes to new buildings and improvements to existing buildings.

This will require a switch away from fossil-fuel based heating, increasing the energy efficiency of the building stock, and improving the energy efficiency of lighting and electrical appliances.

It will also necessitate the widespread use of heat pumps to replace boilers and accelerating district heating and hydrogen technologies.

Julie Hirigoyen, Chief Executive at UKGBC said: “This is a powerful and positive move by the Prime Minister that will give her time in office a legacy beyond Brexit.

“UKGBC knows that the built environment contains some of the biggest opportunities to slash emissions.

“We must accelerate action in all areas including improving the efficiency of our aging building stock, and overcoming the challenge of decarbonising heat.


“To do this, we need to see both policy and industry leadership to ensure the built environment is at the vanguard of emissions reductions. There is no time to lose, now is the time to act.”

Paul Reeve, director of the Electrical Contractors Association, said: “No-one should expect the feat of resolving the UK’s carbon footprint to be anything other than daunting, but the Government has issued a truly remarkable response to the ‘zero carbon’ challenge set out by the CCC in May.

“The task ahead is immense: the UK is drastically short of the infrastructure, supply and installation capacity needed to introduce low-carbon building heating at scale.

“There are also major ‘low carbon’ skills gaps across building design, construction and installation. We also need to ensure that whatever happens in the years ahead delivers the quality and performance necessary for whole-life low carbon buildings.”

 

Latest news

Muse clinches developer role on £650m Slough regeneration

North West Quadrant scheme involves building 1,400 homes, offices, retail and leisure in the heart of Slough
2 hours ago

Scape starts race for £1bn consultancy framework

Bids now invited for national four year deal
21 mins ago

London office starts slump by nearly half

Contractors use of non-UK labour in Capital falls from a third to a quarter of workforce
14 hours ago

Kier suffers shareholder revolt over chief’s pay

Almost 54% of shareholders vote against board pay
3 days ago

Cladding probe after Bolton student block blaze

Latest fire raises more questions over cladding
15 hours ago

Weston and Tesco submit plan to turn store site into 1,280 homes

Major mixed-use scheme planned for Goodmayes in East London
6 hours ago

Kingspan UK insulation sales fall 15%

Building products giant expects weak sales to continue next year
6 hours ago

Goldbeck lands £31m Gatwick car park deal

Latest win adds to recent successes in aviation sector
7 hours ago

String of M&E wins sees HE Simm touch £100m turnover

Repeat business for satisfied clients boosts results at specialist
7 hours ago

Interserve restructure paves way for possible break-up

Chief executive Debbie White to step down by end of December
3 days ago

Kier Chief Operating Officer leaves as cost cuts continue

Claudio Veritiero joins 1,200 staff set to go by next June
3 days ago

Eurovia trials robo-cars to ferry tools to highways sites

Driverless delivery vehicles will also survey road conditions as they go
3 days ago

PDR Construction starts Arco HQ in Hull

£16m project marks major milestone in £80m waterfront regeneration
3 days ago

Crossrail traffic marshall threatens passer-by and kids

Bond Street station subcontractor sacked after confrontation with public
3 days ago

Multiplex Europe chief Ashley Muldoon exits

Muldoon steps down after 22 years in top management shake-up
4 days ago

New-build housing completions top 200,000

Completions rise to the highest level since the 1980’s
4 days ago

Interserve chalks up 15th school project this year

Specialist needs school to be built in Oldham
4 days ago

Styles & Wood chiefs leave the business

CEO Tony Lenehan and finance boss Phil Lanigan depart
4 days ago

Commonwealth Games aquatic centre cost soars by 20%

Wates to start building work in January after £73m budget sign-off next week
4 days ago

New safety template in fight to prevent falls on site

New industry-standard guide launched: Download free now
4 days ago

Plan in for £365m Salford Cotton Quay scheme

Cotton Quays will include 37 and 48-storey buildings
4 days ago

Carillion liquidator to clawback £510m

Financial watchdog to consider whether to take action over conduct of directors in March
5 days ago

Graham wins £26m Poynton relief road

Main works on 3km Cheshire road to start next May
4 days ago

Interserve hires new construction commercial director

Ben Edwards takes up new role after seven years in Middle East
5 days ago

Developer fined £600,000 for white finger outbreak

Groundworkers suffer Hand Arm Vibration Syndrome on Places for People sites
4 days ago

British Land makes £200m profit on luxury Mayfair flats

Developer hails "highly successful" Clarges scheme
5 days ago

Network Rail plans Dragons’ Den to drive SME innovation

Rail infrastructure on track to deliver a third of spending via SMEs by 2022
5 days ago

Balfour tops October contracts league after road win

Morgan Sindall unseats Kier with the highest value of orders over last 12 months
6 days ago

Plans go in for 20-storey Bolton tower

Seddon lined-up as main contractor for major mixed-use scheme
5 days ago

Galliard to start luxury apartments above Crossrail station

Go-ahead for £140m residential scheme above delayed station
6 days ago

Contractor services