Wates to go waste and carbon free by 2025

Grant Prior 5 years ago
Share

Wates has committed to eliminating waste and carbon from its operations by 2025.

The company has committed to three headline targets to help ensure it does ‘zero harm’ to the environment:

  •      Zero waste from Wates operations by 2025reduce and then eliminate the production of all waste created from on-site operations.
  •       Zero carbon from Wates operations and operational vehicles by 2025reduce carbon emissions and become carbon neutral.
  •       Positive impact on nature from all operationsenhance the natural environment wherever it operates and to increase the value and community benefit of natural environments.

Measure taken will include switching to an all-electric commercial vehicle fleet and eliminating single-use plastic from its operations and supply chain.

Wates will also be investing in sustainable building techniques, organising sustainability placements for graduate and apprenticeship staff, planting 5,000 trees annually and ensuring that all sites or frameworks deliver at least one nature enhancement project.

This year the focus will be on raising awareness, education and engagement and using data collection to set accurate benchmarks.

The company is using a similar approach to its health and safety programme where a target-led approach has resulted in a “sea-change” in culture and behaviour.

David Allen, Wates Chief Executive, said: “We have established bold, ambitious, deliberately stretching targets for creating zero harm to the environment by 2025 because we believe that by committing to something extraordinary, we can achieve something extraordinary.

“Together with our partners, we will reduce waste and carbon, and improve our natural environment for generations to come.

“Our industry has made and continues to make an unhelpful contribution to the global climate crisis.

“We have a responsibility to reduce and eventually to reverse the impact we’re having on our planet and are determined that everyone in the Wates Group will do what is necessary to make a real and lasting difference.”

John Dunne, Group Health, Safety, Environment and Quality Director, added: “We are choosing to take a leading role in reducing our industry’s environmental impact.

“We work with a diverse range of public and private sector partners and businesses of all sizes are part of our supply chain.

“A key part of achieving zero harm to the environment will be working collaboratively with these partners.

“Our strategy will focus our attentions and energies on achieving zero waste, zero carbon and positive nature enhancement by 2025; and everyone has a vital role to play in achieving it.”

Latest news

Bid rigging probe launched into school repair work

Firms raided this week with focus on roofing contracts
14 hours ago

Government commits to four new prisons in seven years

£2.3bn pledged for new prison build programme
13 hours ago

Go-ahead to revamp former London city hall

Project will straighten the building's leaning profile with terraces to every level
2 hours ago

Credit insurance saves Billington from ISG hit

Steel specialist puts on extra shifts at its plants to cope with demand
18 hours ago

M&E specialist Dodd doubles profit on retrofit surge

Family-owned Telford specialist delivers record revenue of nearly £250m
18 hours ago

Go-ahead for 800-home Croydon dual towers

One Lansdowne Road build to rent scheme to cost £260m to build
18 hours ago

Construction inflation set to return raising tender prices

End of 2024 to mark the bottom of present inflationary trough
18 hours ago

Start date for vast Balfour and Costain carbon capture power job

£4bn Teesside project to start construction next year creating 3,000 jobs
1 day ago

Plans go in to start revamp of North Finchley town centre

Developer Regal unveils first details of Barnet masterplan
18 hours ago

Glencar bags £18m Big Yellow London store

Six-storey stoarage centre to be built at Staples Corner
17 hours ago

Plan unveiled for 31-storey London Fenchurch Street tower

Demolition work to start in 2026 for new office tower
2 days ago

Vinci Building buys tower cranes for first time

Contractor invests in two WOLFFKRAN all-electric cranes at £138m Sheffield site
2 days ago

30 local firms land United Utilities £500m framework

Minor works deal win for North West civils and M&E specialists
2 days ago

Restructure pays off as Higgins returns to profit

Housing contractor recovers from £25.9m loss last year
2 days ago

Former Heathrow boss joins Mace in board rejig

Firm completes string NED appointments to expanded group board
3 days ago

Planning officers to get powers to bypass committee stage for housing

Rayner reform plan to cut out local council planning committees
3 days ago

National Insurance hike to delay construction recovery

Arcadis paints varied picture with full recovery delayed until 2026
3 days ago

Gratte Bros rides out cost rises with profit increase

M&E specialist warns of further upward pressure on wage costs
3 days ago

Sellar’s 36-storey London City office tower approved

Demolition work to start in 2026 at 60 Gracechurch Street site
5 days ago

Roofers caught using phone lights to work at night

Roofing boss handed suspended prison sentence for lack of edge protection
3 days ago

£380m North West housing framework out for bid

St Helens-based Torus aims to build 9,000 homes by 2029
3 days ago

Historic property magazine to close

Estates Gazette has been in business since 1858
5 days ago

M&S Marble Arch rebuild approved after three-year planning fight

Plans were delayed when Michael Gove backed carbon campaigners
6 days ago

£191m revamp funding approved for London Barbican Centre

Construction to start in 2027 on five-year programme
6 days ago

RED Construction tops £100m turnover

Builder maintains profit margin at 1.7% as business nearly doubles in size
6 days ago

Timber designs shortlisted for roads ‘footbridge of the future’

Three of five designs for National Highways propose timber structures over busy highways
6 days ago

PM pledges to fast-track 150 infrastructure schemes

Fresh promise to speed up planning decisions on infrastructure and house building
7 days ago

Amey FM firm fined after legionella kills prisoner

Court fines company £600,000 for prison upkeep failures
6 days ago

Buyers report boom in commercial work

Construction bucks slowdown in general economy
7 days ago

Plans in for £250m Stockport 8 housing-led scheme

Work to start on phase 1 by the end of next year
7 days ago

Contractor services