Woman killed in London crane collapse

Aaron Morby 4 years ago
Share

A woman has died and at least four people were injured when a tower crane collapsed onto houses in East London on Wednesday.

Picture courtesy of London Fire Brigade
Picture courtesy of London Fire Brigade

A Wolff luffing crane at a 62-flat housing site in Bow is understood to have toppled over backwards.

The jib crashed into the roof of two nearby terraced homes while the tower came down on the under-construction scheme.

Picture courtesy of Sky News

The dead woman was found on the first floor of one of the houses.

Firefighters arrived at the scene and spent several hours freeing people trapped inside the damaged house.

Eyewitnesses said the crane driver had been rescued.

London Fire Brigade Assistant Commissioner Graham Ellis said: “A 20 metre crane collapsed onto a block of flats under development and into two terraced houses on Compton Close.

“Our Urban Search and Rescue crews undertook a complex rescue operation and used specialist equipment to search the properties.

“Sadly one woman died at the scene. The London Ambulance Service have confirmed that two people were taken to hospital with head injuries and a further two were treated at the scene.”

The crane was operating on a major housing site for NU Living, the in-house building arm of Swan Housing Association.

A spokeswoman for the housing association said: “Swan Housing Association /NU living is deeply saddened by an incident that has occurred at our Watts Grove development site this afternoon.

“Our thoughts are with those affected and their families at this difficult time.

“We would like to thank the emergency services for their swift and dedicated response and those who are supporting residents who have had to leave their homes as a safety precaution.

“Our staff are on site to provide support to the emergency response and the investigation.”

Unite national officer for construction Jerry Swain said: “There must be an urgent, full and complete investigation into the circumstances that led to this accident.

“The preliminary findings of which must be released in weeks, rather months or years, in order to ensure that similar accidents are avoided in the future.”

Latest news

Morgan Sindall to build former Willmott Dixon leisure job

New contractor appointed on
14 hours ago

Graham consortium wins £400m Manchester job

Equitix consortium to now work up DBFO plans for University of Manchester’s Fallowfield Campus
11 hours ago

Keltbray looking to sell infrastructure business

£378m turnover rail, energy and highways business up for sale
21 hours ago

Innovative viaduct building method used for first time in UK

HS2 contractors will build nine viaducts in Delta Junction using special cantilevered process
22 hours ago

Unite buys London site to fast-track 444-bed student scheme

£800m to be spent on London development pipeline in next five years
22 hours ago

CITB awards £2.5m of contracts to management consultant

Three outsourced deals in the last year for "project leadership and management consultancy"
22 hours ago

Village centre approved for 6,000-home new town plan

Hampshire's Welborne Garden Village plan has been in the pipeline for two decades.
21 hours ago

£3m fine after cherry picker demolition death

Court rules after tragedy during decommissioning of gas rig
22 hours ago

BAM plans wave of job cuts at UK Construction arm

Co-op Live arena plunges Bam Construction to £19.5m first-half loss
2 days ago

Robot tunnel builder goes into administration

Hypertunnel was hoping to revolutionise how underground structures are built
2 days ago

Wates to build £86m Guildford Council housing scheme

40% of the 248 homes will become council homes under partnership deal
2 days ago

“Scrap CITB” say three quarters of construction firms

Payroll giant Hudson Contract calls for CITB to be absorbed into new Skills England training body
2 days ago

£100m Prestwich Village revival approved

Vinci and Willmott Dixon in chase for Muse-led regeneration scheme
2 days ago

Carbon negative asphalt aggregate trialled on M11

Skanska and Tarmac test CO2 absorbing aggregate material on stretch of Essex motorway
2 days ago

Father and son sentenced over covid construction loan fraud

Bristol builders given suspended jail sentences over bogus Bounce Back Loans
2 days ago

Beck Interiors files administration notice

Supply chain has suffered delayed payments from £139m-turnover luxury fit out specialist
3 days ago

Green light for York Central civil service office hub

£60m office project accelerates York Central goods yard redevelopment
3 days ago

Blenheim House Construction enters administration

Administrators looking at options on present projects
3 days ago

Profits rise at Esh Group with more to come

Contractor confident about year ahead as market conditions move in right direction
3 days ago

Piling specialist Van Elle sees housing orders rise 30%

Mark Cutler says firm on course to deliver 10% annual sales growth
3 days ago

HS2 to spend £100m shutting sites where work never started

Remediation of sites no longer needed for cancelled Phase 2 will take three years
4 days ago

Willmott Dixon wins £61m deal for new Army dog unit

Contractor to revamp Kendrew Barracks in Rutland
3 days ago

Stockport advances 4,000-home Town Centre East plan

Council seeks consultants to steer plan for 280-acre area in the city
3 days ago

ISG sale imminent as buyers set-up UK holding company

South African nutrition entrepreneur and Australian partner primed to take over
4 days ago

CR Construction wins £210m Manchester towers

Construction to start next year on four blocks ranging from nine to 34-storeys
4 days ago

Southern Housing to rationalise supply chain following merger

Firms put on alert for £1.7bn construction framework renewal
4 days ago

Decision delayed on 52-storey Isle of Dogs tower

Hong Kong developer plans 460 flats block next to Millwall Inner Dock
4 days ago

Go-ahead for £850m North London estate rebuild

Flagship Edmonton housing estate redevelopment will deliver 2,000 new homes
4 days ago

Mace lands £184m Oxford Science Park contract

Contractor to build trio of laboratory and office buildings
5 days ago

Worker paralysed in 30ft fall during electricity pylon demolition

Specialist firm fined £240,000 after court hears linesman attached lanyard to a loosened steel section
4 days ago

Contractor services