Costain fined £1.2m after steel cage collapse on road job

Grant Prior 6 years ago
Share

Costain and one of its subcontractors have been fined after two workers were injured when a mobile elevating work platform was struck by a collapsing reinforcement cage during construction of a bypass.

Manchester Minshull Street Crown Court heard that in the summer of 2015, to support the construction of the A556 bypass in Cheshire, work had started to build a pier designed to eventually support a bridge.

This involved erecting a steel cage. On 3 August, two workers on a MEWP were working on the structure, when it collapsed. The cage crashed into the MEWP, causing it to fall on its side.

The first employee sustained life changing head injuries and the second a leg fracture. A third worker nearby escaped injury by moving away just in time.

An HSE investigation found there was no temporary support for the reinforcement cage during construction of the central pier.

Costain was principal contractor and Brenbuild Limited was appointed by Costain to construct seven bridges and an underpass.

Both firms were aware the cage was visibly leaning and that workers on site had raised concerns.

Neither company recognised the inherent instability of the reinforcement cage or took measures to ensure the work could be carried out safely.

Brenbuild Limited failed to stop work to prevent injuries from the risk of collapse and to implement control measures to prevent instability. Costain failed to plan, manage and monitor construction of the central pier.

Brenbuild Limited of Scunthorpe pleaded guilty to safety breaches and was fined £80,000 and ordered to pay costs of £21,730.11.

Costain also pleaded guilty and was fined £1.2m and ordered to pay costs of £21,644.51.

Speaking after the hearing HSE inspector Deborah Walker said: “This incident could have been easily prevented and the risk of collapse should have been identified by both companies.

“If a suitable safe system of work had been in place, this incident would not have occurred, and the two workers would not have suffered these injuries.”

Latest news

London office fit-out second most pricey in the world

High-spec fit-outs now cost nearly £4,400 per sq m as occupiers chase top quality workspace
1 day ago

Statom builds £617m order book after board strengthened

Essex contractor reshapes around integrated engineering and self-delivery model
1 day ago

Developers called up for £10bn Old Oak mega-scheme

Race starts to find developer partner by spring 2027 to deliver 8,000 homes
1 day ago

Speller Metcalfe replaces Curo on £18m leisure job

Fenland council acts swiftly to keep Manor Leisure Centre on track
1 day ago

Bachy and Kilnbridge team up for ground-to-frame offer

New UrbanCore venture to target complex basement and structural packages
1 day ago

Lovell signs off £1bn Birmingham estate regen deal

Developer to lead 3,500-home rebuild of Druid’s Heath over 20 years
2 days ago

Legendre to start £70m Mayfair office revamp

Main construction begins in June at 50 Stratton Street site
2 days ago

Road worker loses leg in milling machine

Court hears how worker became entangled in machine while road planing
2 days ago

Costain on track for 4% margin as workload builds

Contractor expects revenue and profit growth this year ahead of bigger 2027 uplift
2 days ago

Falkirk steelwork firm workers protest after wages fail to land

Workers gather at Hescott Engineering as fears grow over firm’s future
2 days ago

Ageing M53 bridges first in line for £1bn motorway structures repair

Four bridge decks to be replaced in three-year Merseyside and Cheshire upgrade
2 days ago

Landsec flags more delays on major housing starts

Developer waiting for policy concessions to make schemes more profitable
2 days ago

Plans in for £100m Buxton town centre reboot

Capital&Centric finalises plan for Spring shopping centre redevelopment
2 days ago

Ex-Skanska VP joins M Group as energy infrastructure chief

Former COO Andrew English brought in to drive sector growth
3 days ago

Vistry warns first-half profits to be hit by discount drive

New Vistry chief starts operational review as cash drive shifts private homes stock
3 days ago

Strabag UK gears up for civils work surge next year

Trio of major tunnelling jobs to drive revenue to £1bn target
3 days ago

Glencar revealed as builder of £50m Minecraft World

Contractor confirmed on latest attraction at Chessington World of Adventures
3 days ago

King’s speech building safety bill puts manufacturers in firing line

Government aims for new powers to make construction product firms contribute to remediation costs
3 days ago

TfL names trio for £700m station upgrade framework

Amey Rail, Costain and Dragados secure places on London stations deal
3 days ago

Quinn London sold to staff

£109m turnover contractor latest to transition to an Employee Ownership Trust
4 days ago

More fines and bans for former Carillion chiefs

Finance chiefs and trio of accountants hit with penalties
4 days ago

Fusion21 starts race for £350m housing repairs framework

Firms face fight to retain spots on third-generation repairs and voids deal
4 days ago

London builder Curo Construction ceases trading

Directors write to up to 100 staff telling them not to return to sites
4 days ago

Vistry gets £600m Olympic Park homes go-ahead

First 355-home phase approved at Pudding Mill Lane in Stratford approved
4 days ago

Fox snaps up highways contractor and readymix firm

DSD Construction and Moore Readymix acquisitions dig group deeper into civils
5 days ago

Kier and Multiplex line up for Derwent London office starts

Developer presses button on two West End schemes as leasing demand and rents strengthen
4 days ago

McLaren lands £99m London Bond Street over-station job

Retrofit-led West One Shopping Centre will retain 60% of existing concrete frame
4 days ago

£26bn Pagabo developer framework goes live for bidders

Four-year framework targets councils, NHS trusts and housing providers
4 days ago

Starmer confirms plan to nationalise British Steel

Plan could clear way for greener electric arc furnace produce steel in five years
5 days ago

Cardo gains place on L&Q’s £3bn home upgrade programme

Housing body expands delivery line-up for 15-year investment plan
5 days ago