Derwent sees future in long-life, loose-fit offices

Aaron Morby 4 years ago
Share

London property developer Derwent is evolving its office development model in response to the coronavirus crisis.

Derwent's Featherstone Building near Old Street roundabout features higher ceilings of 3.1m
Derwent's Featherstone Building near Old Street roundabout features higher ceilings of 3.1m

The firm, which during the last decade pioneered the development of stripped out offices with exposed building services, is altering its model again to meet changing work patterns and staff demands.

Its next-generation model designs will feature ‘long-life loose-fit’ adaptable spaces, which boast higher ceilings and higher-spec ventilation.

Paul Williams, chief executive, said he believed the fundamentals supporting offices remained.

He said: “Companies still need to bring their staff together, for the collaboration that social interaction brings, to build culture, to attract and retain talent and to have a physical embodiment of their brand.

“There is no substitute for building relationships with colleagues and clients in person.

“That is fundamental to the recovery of the economy and to our wellbeing. We expect the benefits of having technology working better from home will be supplemented by relationship building as businesses across sectors get back into work and London’s villages come alive again.”

Williams added: “We will continue to adapt. More flexible working, heightened health and safety, more space required between desks and in communal areas all impacts the way in which we think about occupational density.

“As time progressed questions have been raised about office use and its role in business.

“We believe that this debate has highlighted workplace trends that were already in place which the pandemic has accelerated.

“For some time, occupiers have looked for more flexible, adaptable and increasingly higher quality and ‘greener’ space.

“As part of our planning and design, in conversation with business, with architects and with local authorities, we are focused on ‘long-life loose-fit’ adaptable spaces and wellness factors that can enable people to meet together in larger common areas, with higher ceilings and better air quality and ventilation.”

Williams said in the war on attracting talent, employees would increasingly favour well-designed modern office space that provided good amenity and promoted wellbeing.

He added: “We think our focus on progressive design, our wide range of leases, customer focus, flexible approach and early adoption of our Net Zero Carbon Pathway to 2030 leaves us well placed to meet the continually changing office demand.”

Derwent also confirmed it was continuing to progress its largest pipeline office scheme at 19-35 Baker Street in London.

Work is still expected to start on the 293,000 sq ft mixed-use development in the second half of 2021.

Its other major consented project at Holden House in Oxford Street will be delayed given the current uncertainties in the retail market.

Latest news

Construction T Level scrapped due to lack of demand

Courses canned after less than 100 sign-up for latest round
4 hours ago

Bid rigging probe launched into school repair work

Firms raided this week with focus on roofing contracts
1 day ago

McLaren hires ex-ISG regional boss for north east expansion

Andrew Beaumont becomes MD of new Yorkshire and North East business
13 hours ago

Government commits to four new prisons in seven years

£2.3bn pledged for new prison build programme
1 day ago

Road and rail delays hit revenue at Van Elle

Turnover drops 5% as markets remain challenging for piling specialist
12 hours ago

Boot reports ‘noticeable improvement’ in planning system

Government planning reforms already unblocking council planning
12 hours ago

Go-ahead to revamp former London city hall

Project will straighten the building's leaning profile with terraces to every level
20 hours ago

United Living to divert Midlands gas pipeline

600m pipeline diversion clears way for M54 to M6 link road construction
11 hours ago

Credit insurance saves Billington from ISG hit

Steel specialist puts on extra shifts at its plants to cope with demand
2 days ago

M&E specialist Dodd doubles profit on retrofit surge

Family-owned Telford specialist delivers record revenue of nearly £250m
1 day ago

Go-ahead for 800-home Croydon dual towers

One Lansdowne Road build to rent scheme to cost £260m to build
2 days ago

Construction inflation set to return raising tender prices

End of 2024 to mark the bottom of present inflationary trough
2 days ago

Start date for vast Balfour and Costain carbon capture power job

£4bn Teesside project to start construction next year creating 3,000 jobs
2 days ago

Plans go in to start revamp of North Finchley town centre

Developer Regal unveils first details of Barnet masterplan
2 days ago

Glencar bags £18m Big Yellow London store

Six-storey stoarage centre to be built at Staples Corner
1 day ago

Plan unveiled for 31-storey London Fenchurch Street tower

Demolition work to start in 2026 for new office tower
3 days ago

Vinci Building buys tower cranes for first time

Contractor invests in two WOLFFKRAN all-electric cranes at £138m Sheffield site
3 days ago

30 local firms land United Utilities £500m framework

Minor works deal win for North West civils and M&E specialists
3 days ago

Restructure pays off as Higgins returns to profit

Housing contractor recovers from £25.9m loss last year
3 days ago

Former Heathrow boss joins Mace in board rejig

Firm completes string NED appointments to expanded group board
3 days ago

Planning officers to get powers to bypass committee stage for housing

Rayner reform plan to cut out local council planning committees
3 days ago

National Insurance hike to delay construction recovery

Arcadis paints varied picture with full recovery delayed until 2026
4 days ago

Gratte Bros rides out cost rises with profit increase

M&E specialist warns of further upward pressure on wage costs
3 days ago

Sellar’s 36-storey London City office tower approved

Demolition work to start in 2026 at 60 Gracechurch Street site
5 days ago

Roofers caught using phone lights to work at night

Roofing boss handed suspended prison sentence for lack of edge protection
4 days ago

£380m North West housing framework out for bid

St Helens-based Torus aims to build 9,000 homes by 2029
4 days ago

Historic property magazine to close

Estates Gazette has been in business since 1858
6 days ago

M&S Marble Arch rebuild approved after three-year planning fight

Plans were delayed when Michael Gove backed carbon campaigners
1 week ago

£191m revamp funding approved for London Barbican Centre

Construction to start in 2027 on five-year programme
7 days ago

RED Construction tops £100m turnover

Builder maintains profit margin at 1.7% as business nearly doubles in size
7 days ago

Contractor services