Taylor Wimpey wants bidders for £30m Battersea block

Grant Prior 1 year ago
Share

A Taylor Wimpey joint venture is looking for contractors to bid for a £30m commercial and residential job in south London.

The York Road and Winstanley Regeneration LLP is a joint venture between the London Borough of Wandsworth and Taylor Wimpey redeveloping the Winstanley and York Road Estates in Battersea.

The overall scheme comprises a number of community buildings, retail and amenity spaces and 2,290 mixed-tenure residential units.

The JV is seeking interest from suitably experienced and competent building contractors to undertake the design and construction of the existing RIBA Stage 4 design to build completion (end of RIBA Stage 6) for the second phase of the scheme (Block 5).

Work will include provision of commercial space and circa 132 residential units across three residential blocks and associated external works.

The forecast construction cost for Block 5 is £30m and the contract will be a JCT Design & Build 2016 with Employer’s amendments.

The JV LLP said: “We invite expressions of interest from suitably qualified, competent and experienced contractors.

“All respondents to this notice will receive a pre-qualification questionnaire to be subsequently completed and returned in order to be considered for the competitive tender process, on completion of which the construction works package will be awarded.”

Expressions of interest must be made before November 9 with prequal questionnaires due to be issued on November 20.

Questionnaires will have to be returned by December 4 with invitations to tender issued on January 11 2021 ahead of an April 1 return date and winner announced on June 14.

The JV LLP added: “The building contractors should be aware that both mid and post tender interviews will take place within the periods above.”

To express an interest please email WYRBlock5@taylorwimpey.com putting ‘Block 5 Construction Works’ in the subject bar.

Expressions of interest must be submitted by email by 12:00 noon on Monday 09 November 2020.

As a minimum, expressions of interest must contain the full company name and postal address, along with a contact name, email address and telephone number.

Any expression of interest received after 12pm on Monday 09 November 2020 or which does not comply with the above requirements will not be considered for the contract.

Latest news

Overbury gets green light for £300m Citi Tower refurb

Revamp of 42-storey Canary Wharf tower will be one of London's biggest ever refurb jobs
7 hours ago

McAleer & Rushe confirms £23m Manchester hotel job

Work to start on 17 storey Maldron hotel next month
2 hours ago

£130m cash injection kick-starts first Wirral Waters resi blocks

Wirral Waters One 600-home project secures funding
8 hours ago

Government commits £100m to Sizewell C nuclear project

Government’s cash injection hoped to ‘maximise investor confidence’ while EDF courts private investors
7 hours ago

Public raise alarm over unsafe roof work high above Manchester

Court hears how HSE swooped to shut down site after tip off
1 day ago

Realstar and Lendlease ink £120m London build to rent deal

Forward funding deal for 251 private rental flats at Deptford Landings scheme
8 hours ago

Balfour Beatty chalks up 100th Scape civils job

Procurement body prepares to invite bids next month for next generation net zero civils framework
8 hours ago

Forterra hikes brick prices by 10%+ with more rises to come

Demand continues to surge and costs increase for masonry products giant
1 day ago

Go-ahead for £40m Manchester spec office scheme

Local firm PP O'Connor to demolish Speakers House for 17-storey office block
1 day ago

Spanish giant lands deal to build £683m waste power plant

New plant will turn black bin bag waste into electricity
2 days ago

Henry wins six Ealing council housing projects

Henry Construction secures £40m West London council homes deal
1 day ago

Landsec eyes £825m Glasgow Buchanan Galleries rebuild

Glasgow's mammoth shopping mall could be demolished for mixed-use city quarter
2 days ago

Mace lands £300m London court and police complex

Main construction works to start on Fleet Street site this autumn
2 days ago

Graham bags £30m Birmingham build to rent job

Work set to start Crown Works residential scheme in the Colmore Business District
1 day ago

Balfour Beatty names new investment arm chief

Leo Quinn promotes former major projects finance director Gavin Russell
2 days ago

M1 fraud probe exposes contract management problems

M1 J13-16 investigation finds £320,000 of central barrier scrap metal went missing
2 days ago

Beaumont Morgan Developments goes into administration

Begbies Traynor now in charge of £47m turnover Manchester contractor
2 days ago

Green light for major overhaul of Surrey pharma campus

Kier and Mace bidding for revamp project with three storey glulam building at its heart
2 days ago

Morgan Sindall hires Crossrail safety director

Carole Bardell-Wise joins infrastructure business as SHEQ Director.
2 days ago

Galliford Try bags £28m Dover inland border control facility

Major inland border facility to be built alongside the A2 outside of Dover
2 days ago

Plans go in for £280m Leeds Whitehall Riverside scheme

Major office and flats scheme to be built next to River Aire
2 days ago

Roofer dies in six metre plunge through asbestos sheets

Court hears no safety nets were fitted on site
3 days ago

Subbies stop working for Beaumont Morgan Developments

Manchester based contractor was delivering Fortis Quay for associate development company
3 days ago

Gove threatens ban on cladding suppliers failing to pay for retrofits

Cladding and insulation suppliers now in firing line for cash for £9bn post-Grenfell remediation bill
4 days ago

Bill for £22bn HS2 extension to Manchester goes to Parliament

52-mile extension of HS2 to Manchester via Manchester Airport will support 17,500 construction jobs
3 days ago

Galliard scoops up trio of sites for schemes worth £265m

Sites in Redbridge, Ipswich and Milton Keynes to be developed
3 days ago

Plans in for 350-flat Salford student scheme

Developer X1 hopes to start 15-storey building later this year
3 days ago

Green light for Birmingham Paradise landmark hotel

17-storey hotel will be the 'cornerstone' of Phase 2
6 days ago

Structural steel price jumps another £50 a tonne

British Steel blames New Year's price hike on continuing high product costs
6 days ago

Enabling works start at £400m Manchester First Street

Downing to start main construction in March of three resi buildings rising up to 45 storeys
6 days ago

Contractor services