Offsite Solutions lands £3.7m bathroom pod package

Grant Prior 3 years ago Offsite Solutions
Share

Offsite Solutions has been awarded its largest bathroom pod contract this year.

The  £3.7m deal is to manufacture nearly 1,000 pods for a £105m build-to-rent residential scheme in Leeds for main contractor Galliford Try.

Developed by Highline Investments and designed by Carey Jones Chapman Tolcher, Monk Bridge is set to transform the cityscape in Leeds.

The ambitious skyline project on a major regeneration site near the River Aire will provide 665 homes for rent over five buildings from 12 to 22 storeys high.

The scheme includes the restoration of the adjacent former railway arches for retail, leisure and restaurant uses and the top of a Grade II listed historic viaduct will be transformed into a new public park.

Offsite Solutions is manufacturing and fitting out 700 bathroom pods, and 288 ensuite shower pods for the studios, one, two and three-bedroom apartments at Monk Bridge.

The project will use Offsite Solutions’ recently launched enhanced GRP pods which offer numerous aesthetic features designed to appeal to prospective tenants, as well as significantly lower capital and operating costs.

The pods will have porcelain-tiled feature walls, a tiled recess above the bath, a tiled splashback above the hand basin, a solid surface vanity shelf, wall hung toilet, full width mirrored bathroom cabinets and high quality Hansgrohe brassware. The shower pods will have bifold glass doors.

Mark Neale, Senior Design Manager at Galliford Try said: “Bathroom pods are an ideal solution for a residential development of this scale.

“This use of offsite construction reduces the programme and the number of trades on site – from plumbers to tilers and plasterers – and provides the level of quality we need because of the extra control you can achieve in a factory.

“Offsite Solutions has a flexible approach and was able to offer us a more bespoke solution for the bathrooms and shower rooms to accommodate the client’s specific requirements, such as door widths and locations.

“The pod specification was upgraded to include a number of enhancements such as the addition of porcelain feature tiles and a high-quality shower and brassware. We visited the factory with the client which was very useful. It is an impressive set up.”

All the pods for Monk Bridge will be supplied floorless, which allows the units to be installed directly onto the floor slab, making it easier to achieve continuous level floors throughout and minimise floor build-up for each storey.

The bathroom and shower pods will have an integral tile-effect finish within the GRP carcase, which compliments the porcelain-tiled feature wall.

This avoids the need for grout and tiles in the wet areas and significantly reduces the cost of ongoing maintenance – an ideal solution for build-to-rent.

Latest suppliers & buyers news

Deanestor lands £3m deal at Passivhaus school

Fitout specialist lands latest contract from Robertson
5 days ago
Deanestor

Offsite Solutions lands £2.4m shower pod deal

Major contract win on McAleer & Rushe student tower
3 weeks ago
Offsite Solutions

J3 arranges insurance deal on £55m McGoff resi scheme

Independent insurance and finance advisory continues to win work in new build market
1 month ago

Revamp for CSCS skills card website

Overhaul makes it easier to get the right card
1 month ago

IBMG strengthens senior management team

Peter Cudd becomes CCO and Allun Pittingale COO at builders' merchant's chain
1 month ago
IBMG

Vivalda offers “dust free” manufacturing

Cladding specialist offers effective off site cutting service
1 month ago
Vivalda Group plc

AFI Rentals launches carbon offsetting scheme

Customers can offset 100%+ of environmental impact of machines delivery
1 month ago
AFI-Rentals

Scaffold firms urged to claim training cash

NASC has an extra £180,000 for member firms
2 months ago
NASC

Materials giant Heidelberg drops Hanson brand

Hanson UK renamed Heidelberg Materials
2 months ago
Heidelberg Materials

MCL-PM bounces back from Ilke Homes setback

Modular specialist "stronger than ever" despite sector failures
3 months ago

Pod specialist delivers in Canary Wharf

Latest deal sees Offsite Solutions deliver 356 shower pods
3 months ago
Offsite Solutions

Fit-out specialist hits record turnover

Deanestor back in the black
3 months ago
Deanestor

FP McCann opens new concrete roof tile factory

New plant can produce 60m roof tiles a year
3 months ago
FP McCann

New CEO at Etag

Former Saint Gobain MD joins fixings specialist

Alternative Heat lands £35m biomass deal

Contract in Scottish Highlands is one of largest awarded in UK
4 months ago
Alternative Heat Ltd.

McLaren and Lyons & Annoot use Cemfree at Excel

McLaren cuts carbon emissions on ExCeL London project using cement free mortar, Cemfree
4 months ago
Cemfree

Straightline boosts management team

Graham Drummond joins leading provider of commissioning management services
4 months ago

Collett unveils new heavy lift warehouse

Logistics specialist continues expanding
4 months ago
Collett & Sons Ltd

Deanestor lands another deal with Morrison

Latest school contract is 16th package for fitout specialist
4 months ago
Deanestor

Offsite Solutions lands £5m Downing deal

Specialist to manufacture 1,487 bathroom pods for Manchester towers
5 months ago
Offsite Solutions

AFI appoints new finance chief

Paul Roberts joins powered access specialist
5 months ago
AFI-Rentals

BSI bids to cut costs on infrastructure projects

New whitepaper from standards body aims to boost construction savings
5 months ago

Surging demand sees AFI boost Zoomlion electric fleet

100 powered access machines added to fleet
6 months ago
AFI-Rentals

Conquip lands propping deal with John F Hunt

Specialist to start work on One Liverpool Street site later this year
6 months ago

IBMG expands with the acquisition of Roofing Gear

Latest deal adds three new branches to group
6 months ago
IBMG

McAlpine adopts AI technology from Buildots

Data from sites will be captured by wearable cameras
6 months ago

Lyndon launches trio of new brochures

Learn the latest about scaffolding and access sector businesses
6 months ago
Lyndon SGB

Causeway helps Balfour speed up payments

New system now active on 230 sites
6 months ago

Leading bored piling rig manufacturer Comacchio appoints AGD

Distributer deal with leading manufacturer
6 months ago
AGD Equipment Ltd

J S Wright lands latest package for Hill Group

M&E specialist bags deal on Surrey resi job
6 months ago
J S Wright & Co Ltd

Firm Quick Find

Join Now

Sorry, there was a problem with the details you have entered. Please review the highlighted fields.

Sorry, this email address has already been registered.

Top searches

Contractor services