Laing O’Rourke lands £195m zero carbon office job

Grant Prior 5 years ago
Share

Developer Landsec and Laing O’Rourke have signed a pre-construction services agreement (PCSA) for main building work on the sustainable Timber Square development in London.

A start date is yet to be confirmed for the scheme to build 370,000 sq ft of mixed-use space, including 350,000 sq ft of grade A offices, affordable workspace, roof terraces and enhanced public realm.

Landsec’s Head of Development, David Heaford, said: “We have completed a rigorous assessment process to reach this stage.

“We are delighted to be working with a globally-recognised contractor to deliver this exciting, sustainable development which focuses on connecting communities within a net zero carbon scheme.”

The development will retain 90% of the existing building and use a hybrid steel frame and timber structure, significantly reducing embodied carbon, construction traffic, demolition waste and local air pollution.

Low carbon and recycled materials will also be used across the scheme which is 10 years ahead of UKGBC net zero carbon targets for energy intensity reduction targets.

Céire O’Rourke, Director of UK Clients & Markets at Laing O’Rourke said: “We are excited at being appointed preferred bidder to deliver Timber Square, which is a bold and pioneering project with sustainability at its core.

“Our unique operating model, based on digital engineering, precision manufacturing at our factory in the east Midlands and assembly on site, will help us bring to life LandSec’s vision of modern buildings which support sustainable living and working in the heart of London.

“Our team will now bring the power of their experience to the table to work closely with the client team and make this stunning project a reality.”

Latest news

Sisk swoops to buy Farrans from CRH

625-strong Northern Ireland based business to continue trading under own brand
30 minutes ago

Keepmoat to deliver 600-home urban village in Sandwell

Big decontamination job needed to unlock one of region’s largest brownfield sites
3 hours ago

Graham to start £71m enabling works at Liverpool Central Docks

Work to pave the way for Peel Waters’ 2,350-home waterfront neighbourhood
5 hours ago

Bouygues to build LSE’s 2,000-bed London Bankside towers

LSE plans to replace Bankside House with trio of towers up to 28 storeys
7 hours ago

Lack of sewerage blocking building work on 30,000 homes

House builders blast planning delays over inadequate wastewater infrastructure
8 hours ago

Race starts for £145m River Dee Bridge rebuild

Welsh Government sets 2026 start date for major cross-border link
8 hours ago

Canary Wharf to submit plan for Olympic-sized lido

Plan to deliver six-lane natural water pool at Eden Dock by 2026
8 hours ago

Plans go in for six-tower Leeds resi scheme

New £100m "urban community" for 3.7acre site
8 hours ago

Genuit buys ventilation firm Monodraught for £56m

Building products giant acquires £17m turnover business
7 hours ago

Ardmore Construction Ltd falls into administration

Move isolates fire safety claims, leaving main Ardmore group free to grow profitability
3 days ago

Aston Villa gets go-ahead for £100m North Stand expansion

Project to modernise 1897-built ground ahead of EURO 2028
3 days ago

Quartet wins £1.75bn Midlands Rail Hub upgrade deal

VolkerRail, Laing O’Rourke, AtkinsRéalis and Siemens team up on Birmingham upgrade
4 days ago

McLaren confirmed for £250m Cardiff arena

Robertson Property secures planning green light for 16,500-capacity venue
4 days ago

John F Hunt starts work on £150m West End office revamp

Six month strip out deal at 125 Shaftesbury Avenue
3 days ago

Former Skanska vice president to join Galliford Try

Thomas Faulkner to head up specialist services division
3 days ago

Bowmer + Kirkland snaps up office fit-out firm Denton

Acquisition gives £40m turnover interiors specialist firepower to chase bigger jobs
4 days ago

Contractors sought for £667m Welsh Water mega project

Utility tests appetite for design, build and finance for twin water treatment jobs
4 days ago

Worker killed on Mace London site

Fatal accident on major site in Brent
5 days ago

Willmott Dixon veteran takes construction COO role

Former trainee Stewart Brundell promoted after nearly 40 years at the firm
5 days ago

BSR delays dent margins at OHOB despite record sales

Turnover up 18% to £369m as pre-tax profit nudges £22m
4 days ago

Plans go in for 30-storey Preston tower

£40m scheme will be tallest residential building in Lancashire
4 days ago

Former Laing O’Rourke leader to join Skanska

James Davies to oversee key defence and health projects
4 days ago

Green light for £10bn data hub prep works in Northumberland

Enabling works to roll out over 16 months on former Blyth Power Station site
6 days ago

VolkerWessels UK profits jump as rail and marine work surges

Infrastructure contractor posts £48m pre-tax profit and stronger order book
6 days ago

Groundworks boss wins payout over gagging order

Subcontractor raised fears over asbestos on housing sites
5 days ago

B+K to start £50m rebuild of Northumberland school

Cramlington Learning Village redevelopment contract signed off
6 days ago

New Homes Accelerator targets six new major sites

Construction to be sped-up on another 12,000 homes
5 days ago

Network Rail spend down as CP7 shift bites contractors

Firms warn of inflation squeeze and reprofiled workbanks
6 days ago

Wall of six towers planned for North London strip site

Hendon Goods Yard site plan for line of resi blocks rising to 29 storeys
6 days ago

SCF opens door to single stage tenders for first time

Gen-6 Southern Construction Framework to widen scope for smaller jobs
6 days ago