London law court conversion into ‘sky forest’ approved

Aaron Morby 5 years ago
Share

Plans have been approved to transform Blackfriars Crown Court into a mixed-use office with extra floors and what is claimed to be London’s first urban forest rooftop.

Roots in The Sky building design
Roots in The Sky building design

The radical revamp of the court building into a next-generation office will see over 100 established trees planted on the one-acre rooftop.

Investment manager and developer Fabrix plans to extend the existing two-storey court building to six storeys using a lightweight hybrid steel and CLT frame.

Existing Blackfriars Crown Court building

Work will start early next year on the 385,000 sq ft workspace, which includes a rooftop restaurant and swimming pool alongside community gardens.

Architect Studio RHE has led the two-storey court building design overhaul to create a new six storey office

Clive Nichol, CEO of Fabrix, said that the building would make a significant contribution to London’s ambitious targets for greening, biodiversity and sustainability.

“This building anticipates the shift in the way people are thinking about their working life post-Covid.

“It’s designed with generous spaces and natural ventilation, access to nature and a mix of uses that reflects new ways of working and living,” said Nichol.

“Our vision for Roots In The Sky is a modern workplace that actively engages with its local surroundings, and helps shape a neighbourhood that is enjoyable, liveable and economically productive.

1300 tonnes of soil and 1.5m deep tree pits will support trees and plants on the rooftop

“It’s a commercial building that aims to be a ‘good citizen’, offering a genuine place for community uses, contributing to the ongoing regeneration of Bankside and to London’s wider greening targets.”

Project team


Architect: Studio RHE
Structural Engineer: Symmetrys
MEP, Fire & Sustainability Consultant: Atelier Ten
Project Management: Gardiner & Theobald
Cost Consultant: Quantem
Landscape Design: Harris Bugg Studio

Spaced around a large light well atrium, timber-clad office spaces will be built with floor to ceiling heights of between 3.2 and 6m.

The design maximises the use of natural light with opening sash windows for natural ventilation, filtered displacement air conditioning, as well as removable timber floors to allow maximum flexibility through the space.

Glass-floored infinity-edge swimming pool is heated by the building’s waste heat

Placing the services and cooling in the basement liberates the roofspace to re-introduce trees and create space for a new ‘barn’ meeting space, roof gardens, potting shed and seed bank in the wider roofscape, which has been designed by landscape design practice Harris Bugg.

The rooftop exceeds the urban forest criteria set out by the United Nations, providing canopy cover of 23%, uses a passive water capture and irrigation system and reintroduces wildlife to the city.

The building is designed to be BREEAM outstanding and rated as WELL Gold under the human health and wellness building assessment system

Latest news

Another bad month for construction buyers

Industry activity falls for eighth month in a row in August
1 hour ago

Thames Water to start £840m major projects framework race

Utility giant sets date for launch event ahead of September tender
4 hours ago

Michael J Lonsdale founder joins SES

Michael Hoodless finds new role after collapse of M&E giant
4 hours ago

M&E specialist Pentalec files administration notice

Kent contractor lodges court notice
5 hours ago

Speller Metcalfe trebles profit in record year

Second-generation Speller brothers leadership drives margin recovery
5 hours ago

Vinci to start St Helens’ £100m town centre rebuild

Reserved matters consent clears path for hotel, homes and market hall
4 hours ago

Subcontractors wanted across North of England

Register now for latest Constructionline event in Leeds
4 hours ago

Costain transformation board director exits

Abi Lalani departs as 30-strong change team enters redundancy consultation
1 day ago

Clancy profit up a third as infra boom drives growth

Family contractor lifts operating margin to 6.3% as turnover tops £430m
1 day ago

Bouygues gets nod for £185m Exeter Uni student campus

Six new blocks and a major refurbishment to reshape Streatham campus
2 days ago

Salford civils firms joins employee-owned ranks

Lowbury Construction builds future on employee ownership model
1 day ago

Southern Water gears up £70m Andover pipeline bid race

Hampshire pipeline job to boost water supplies and protect rare chalk streams
1 day ago

Homes England signs deal to boost York housing push

Joint plan to deliver new homes at York Central, Maltkiln and Elvington
1 day ago

UK cement production drops to lowest level since 1950

Domestic producers warn government construction plans are under threat
1 day ago

Merit looking to expand despite unexpected tax demand

Offsite specialist blindsided by HMRC action
2 days ago

Costain poaches Amey highways boss

Andy Denman charged with restoring growth in core road market
2 days ago

McAlpine slims down board with focus on three core markets

Former MDs step back from board but stay with business
2 days ago

Sisk swoops to buy Farrans from CRH

625-strong Northern Ireland based business to continue trading under own brand
3 days ago

Winvic breaks £1bn turnover as profit jumps 70%

Margins improve and order book swells as BSR approvals and frameworks kick in
2 days ago

IES Utilities installs utilities expert Neil Kirkby as new CEO

Ex-Enterprise and Balfour Beatty director appointed to drive growth push
2 days ago

Keepmoat to deliver 600-home urban village in Sandwell

Big decontamination job needed to unlock one of region’s largest brownfield sites
3 days ago

Michelmersh profits hit by ‘highly competitive’ pricing

Stocks back above average levels as Building Safety Act hits demand
2 days ago

Graham to start £71m enabling works at Liverpool Central Docks

Work to pave the way for Peel Waters’ 2,350-home waterfront neighbourhood
3 days ago

Bouygues to build LSE’s 2,000-bed London Bankside towers

LSE plans to replace Bankside House with trio of towers up to 28 storeys
3 days ago

Lack of sewerage blocking building work on 30,000 homes

House builders blast planning delays over inadequate wastewater infrastructure
3 days ago

Race starts for £145m River Dee Bridge rebuild

Welsh Government sets 2026 start date for major cross-border link
3 days ago

Canary Wharf to submit plan for Olympic-sized lido

Plan to deliver six-lane natural water pool at Eden Dock by 2026
3 days ago

Plans go in for six-tower Leeds resi scheme

New £100m "urban community" for 3.7acre site
3 days ago

Genuit buys ventilation firm Monodraught for £56m

Building products giant acquires £17m turnover business
3 days ago

Ardmore Construction Ltd falls into administration

Move isolates fire safety claims, leaving main Ardmore group free to grow profitability
6 days ago