London law court conversion into ‘sky forest’ approved

Aaron Morby 3 years ago
Share

Plans have been approved to transform Blackfriars Crown Court into a mixed-use office with extra floors and what is claimed to be London’s first urban forest rooftop.

Roots in The Sky building design
Roots in The Sky building design

The radical revamp of the court building into a next-generation office will see over 100 established trees planted on the one-acre rooftop.

Investment manager and developer Fabrix plans to extend the existing two-storey court building to six storeys using a lightweight hybrid steel and CLT frame.

Existing Blackfriars Crown Court building

Work will start early next year on the 385,000 sq ft workspace, which includes a rooftop restaurant and swimming pool alongside community gardens.

Architect Studio RHE has led the two-storey court building design overhaul to create a new six storey office

Clive Nichol, CEO of Fabrix, said that the building would make a significant contribution to London’s ambitious targets for greening, biodiversity and sustainability.

“This building anticipates the shift in the way people are thinking about their working life post-Covid.

“It’s designed with generous spaces and natural ventilation, access to nature and a mix of uses that reflects new ways of working and living,” said Nichol.

“Our vision for Roots In The Sky is a modern workplace that actively engages with its local surroundings, and helps shape a neighbourhood that is enjoyable, liveable and economically productive.

1300 tonnes of soil and 1.5m deep tree pits will support trees and plants on the rooftop

“It’s a commercial building that aims to be a ‘good citizen’, offering a genuine place for community uses, contributing to the ongoing regeneration of Bankside and to London’s wider greening targets.”

Project team


Architect: Studio RHE
Structural Engineer: Symmetrys
MEP, Fire & Sustainability Consultant: Atelier Ten
Project Management: Gardiner & Theobald
Cost Consultant: Quantem
Landscape Design: Harris Bugg Studio

Spaced around a large light well atrium, timber-clad office spaces will be built with floor to ceiling heights of between 3.2 and 6m.

The design maximises the use of natural light with opening sash windows for natural ventilation, filtered displacement air conditioning, as well as removable timber floors to allow maximum flexibility through the space.

Glass-floored infinity-edge swimming pool is heated by the building’s waste heat

Placing the services and cooling in the basement liberates the roofspace to re-introduce trees and create space for a new ‘barn’ meeting space, roof gardens, potting shed and seed bank in the wider roofscape, which has been designed by landscape design practice Harris Bugg.

The rooftop exceeds the urban forest criteria set out by the United Nations, providing canopy cover of 23%, uses a passive water capture and irrigation system and reintroduces wildlife to the city.

The building is designed to be BREEAM outstanding and rated as WELL Gold under the human health and wellness building assessment system

Latest news

Geoffrey Osborne files administration notice

Contractor in talks to save parts of the business
1 day ago

RG Group signs £121m Newcastle rental homes job

Developer Olympian Homes advances 519 flats plan at Pottery Lane site
1 day ago

Winners named for £260m Manchester Uni framework

B&K, Henry Bros, Graham, Robertson and Vinci among new line-up
1 day ago

Shed specialist Benniman rides out market lull

Worcestershire warehouse builder says industrial and logistics work is picking up again
1 day ago

Another contractor cleared after high profile immigration raid

Adana Construction employees were working legally on site swooped on by Home Office
1 day ago

McAleer & Rushe wants to meet new London suppliers

Contractor holding Meet the Buyer event in London: Register now
1 day ago

McAlpine signs £500m Broadgate dual towers deal

Work to start on iconic 36-storey and 21-storey towers
2 days ago

Worker rescued from collapsed four metre deep trench

Fire crews take six hours to save trapped builder near Blackwall Tunnel
2 days ago

Gove puts another major building scheme on hold

Secretary of State starts another planning fight after M&S defeat
3 days ago

Greenwich University tenders £300m framework

Up to five firms will carry out upgrade and newbuild work at three campuses
2 days ago

Work starts on Manchester 26-storey Obsidian tower

Contractor Domis starts Salboy's 10th Manchester scheme in seven years
2 days ago

Race for £1.3bn West Midlands social homes framework

The Community Housing Group reboots tender race for new build housing
2 days ago

Delancey submits £400m King’s Cross lab plans

200,000 sq ft lab/office project will be built above railway and tube tunnels just 4.5m below
3 days ago

Winners revealed for £150m fire safety framework

New deal will help organisations comply with the Building Safety Act
2 days ago

Sellar plans £500m City tower next to Walkie-Talkie

Consultation starts on London 60 Gracechurch Street tower
3 days ago

Severfield ends year on high with record order book

Orders top £500m with strong future pipeline of opportunities ahead
3 days ago

Second senior director exits National Highways

Commercial director Malcolm Dare set to move on to new role
3 days ago

New scheme fuels London lab building boom

Plans in for 160,000 sq ft Whitechapel scheme near Royal London hospital
3 days ago

Contract race starts for next £155m section of A9 dualling

Prior Information Notice published for Tay Crossing to Ballinluig stretch
4 days ago

£55m Sheffield build-to-rent scheme approved

Demolition to start later this year for 158-flat Sheffield Garden project
4 days ago

London back as most expensive place to build in world

Capital leapfrogs Geneva to top costliest construction rankings
4 days ago

Gas supplier Regent to buy TClarke for £90m

£491m turnover listed building services specialist to be sold
4 days ago

Steel contractor Billington launches into bridge market

Steelwork firm hires staff from failed architectural and bridge specialist SH Structures
4 days ago

McGee employees benefit from rise in profits

Pre-tax profit doubles boosting payouts for Employee Ownership Trust
4 days ago

Lendlease veteran is latest new McAlpine director

Paul Sims joins as Operations Director after 40 years at rival contractor
5 days ago

Costain signs site labour supply deal with four firms

Contractor to use only a quartet of providers for temporary labour supply
4 days ago

BAM go-ahead for Leeds 200,000 sq ft office

Latitude Yellow will complete final plot at Doncaster Monk Bridge site
5 days ago

VolkerFitzpatrick wins £30m logistics job

Latest deal to build five distribution units for Prologis UK
5 days ago

Trio win new Scape utilities consultancy framework

Perfect Circle, AtkinsRéalis and Arcadis win places on
4 days ago

Precast firm FP McCann cleared after immigration raid

Home Office takes no action after public raid on construction site
5 days ago

Contractor services