London law court conversion into ‘sky forest’ approved

Aaron Morby 4 years ago
Share

Plans have been approved to transform Blackfriars Crown Court into a mixed-use office with extra floors and what is claimed to be London’s first urban forest rooftop.

Roots in The Sky building design
Roots in The Sky building design

The radical revamp of the court building into a next-generation office will see over 100 established trees planted on the one-acre rooftop.

Investment manager and developer Fabrix plans to extend the existing two-storey court building to six storeys using a lightweight hybrid steel and CLT frame.

Existing Blackfriars Crown Court building

Work will start early next year on the 385,000 sq ft workspace, which includes a rooftop restaurant and swimming pool alongside community gardens.

Architect Studio RHE has led the two-storey court building design overhaul to create a new six storey office

Clive Nichol, CEO of Fabrix, said that the building would make a significant contribution to London’s ambitious targets for greening, biodiversity and sustainability.

“This building anticipates the shift in the way people are thinking about their working life post-Covid.

“It’s designed with generous spaces and natural ventilation, access to nature and a mix of uses that reflects new ways of working and living,” said Nichol.

“Our vision for Roots In The Sky is a modern workplace that actively engages with its local surroundings, and helps shape a neighbourhood that is enjoyable, liveable and economically productive.

1300 tonnes of soil and 1.5m deep tree pits will support trees and plants on the rooftop

“It’s a commercial building that aims to be a ‘good citizen’, offering a genuine place for community uses, contributing to the ongoing regeneration of Bankside and to London’s wider greening targets.”

Project team


Architect: Studio RHE
Structural Engineer: Symmetrys
MEP, Fire & Sustainability Consultant: Atelier Ten
Project Management: Gardiner & Theobald
Cost Consultant: Quantem
Landscape Design: Harris Bugg Studio

Spaced around a large light well atrium, timber-clad office spaces will be built with floor to ceiling heights of between 3.2 and 6m.

The design maximises the use of natural light with opening sash windows for natural ventilation, filtered displacement air conditioning, as well as removable timber floors to allow maximum flexibility through the space.

Glass-floored infinity-edge swimming pool is heated by the building’s waste heat

Placing the services and cooling in the basement liberates the roofspace to re-introduce trees and create space for a new ‘barn’ meeting space, roof gardens, potting shed and seed bank in the wider roofscape, which has been designed by landscape design practice Harris Bugg.

The rooftop exceeds the urban forest criteria set out by the United Nations, providing canopy cover of 23%, uses a passive water capture and irrigation system and reintroduces wildlife to the city.

The building is designed to be BREEAM outstanding and rated as WELL Gold under the human health and wellness building assessment system

Latest news

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
4 hours ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
1 day ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
4 hours ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
4 hours ago

Aston Villa to revamp North Stand

Club to reuse existing structure rather than complete rebuild
24 hours ago

Mace signs ex-ISG director to lead Euro health and tech push

Gary Sweeney to head up healthcare and life sciences consultancy arm
3 hours ago

Sir Robert McAlpine claws way back into profit

Firm says return to profit and strong cash balance validates new strategy
1 day ago

Severfield to cut staff by 6% amid pricing pressure

Steelwork contractor warns of extended tighter pricing due to project delays
1 day ago

JRL completes sale of 50% stake to Malaysian giant IJM

Deal boosts balance sheet and kicks starts growth plan
1 day ago

Green light for £100m Liverpool Baltic station build

Enabling highway works to start in the autumn
2 days ago

First live tests for flying construction robots

Drones can lay construction materials at height on site
1 day ago

Three firms land £170m Gentoo Sunderland housing deal

PHS Solutions, Esh and RE:GEN to deliver 10-year home upgrade plan
2 days ago

Gateway gridlock hits build-to-rent delivery as starts nosedive

Build to rent starts plunge 18% in the capital
2 days ago

Call to shift Gateway 2 checks to end building bottleneck

"The current system isn't working but we all want to see safe buildings"
2 days ago

GBN launches £600m bid race for SMR engineer roles

Owner engineers to provide technical and assurance services
2 days ago

Wates hires ex-Homes England chief to head public sector push

Robert Stone to spearhead its public sector and national frameworks strategy
2 days ago

Acheson Construction collapse costs suppliers £8.5m

One frustrated creditor seized a telehandler after contractor went into administration
3 days ago

Dominus wins go-ahead for 173-bed Glasgow scheme

Old Wynd Street job expected to cost around £25m to build
3 days ago

Safety Regulator misses deadline to clear Gateway 2 backlog

Investors pulling out of funding high rise buildings
3 days ago

CITB still sitting on £95m cash pile

Staff numbers jump from 666 to 763 as training body wage bill soars
3 days ago

£500m road surfacing framework market call

NEPO goes out to consultation on north east regional highways deal
3 days ago

Two share £220m Scottish rail repairs and minor works deal

AmcoGiffen and CPMS win civils and building repair deals
3 days ago

Builder wanted for £60m London leisure and flats job

Tower Hamlets aims to replace St George’s Leisure Centre in Shadwell
3 days ago

Contractor confirmed for business park expansion

Roe Developments to start on next phase of Castle Donington scheme
3 days ago

Driver escapes injury as scaffold collapses onto van

Major three-lift scaffold fall blocks north London high street
1 week ago

Gilbert Ash to be sold to staff

£267m turnover contractor to transition to an Employee Ownership Trust
1 week ago

M Group seals biggest-ever deal with Telent takeover

Digital infrastructure specialist deal lifts turnover to £3bn
1 week ago

Aggregates firm Ashville went down owing more than £3m

Debts revealed in Companies House update
1 week ago

Cardo saves 100 jobs at Breyer roofing arm

Private equity-backed Welsh maintenance group continues to expand
1 week ago

Excavator knocked off lorry going under bridge

Traffic Commissioner inquiry after accident in south London
1 week ago

Contractor services