Contractors warned over surge in contaminated plastic waste

Aaron Morby 4 years ago
Share

Contractors are being told to clean up their act after thousands of tonnes of contaminated plastic film and wrap produced in construction were blocked from export at UK ports.

Fresh crackdown after surge in illegal export of plastic waste contaminated with mud, sand and brick
Fresh crackdown after surge in illegal export of plastic waste contaminated with mud, sand and brick

The Environment Agency has pointed the finger at construction and demolition as the worst offenders for generating waste contaminated with materials such as mud, sand, bricks and wood.

Waste exporters are frequently classifying this as ‘green list’ waste of low risk to the environment, but it is often contaminated poor grade plastic waste which is illegal to export.

Firms convicted of illegally exporting this contaminated waste face an unlimited fine and a two-year jail sentence.

But Agency enforcers are warning construction firms are also in the firing line and could face enforcement action if they are found to show disregard for the environment.

During the last year, the EA said it had intercepted huge numbers of shipments to prevent their illegal export.  Of 1,889 waste containers inspected at English ports, agency enforcers stopped a quarter from being illegally exported.

This, combined with regulatory intervention upstream at sites, prevented the illegal export of nearly 23,000 tonnes of waste.

It said exporters were undermining legitimate businesses in the UK seeking to recover such waste properly.

Malcolm Lythgo, Head of Waste Regulation at the Environment Agency, said: “We are seeing a marked increase in the number of highly contaminated plastic film and wrap shipments from the construction and demolition industry being stopped by our officers.

“I would strongly urge businesses to observe their legal responsibility to ensure waste is processed appropriately, so we can protect human health and the environment now and for future generations.

“It’s not enough just to give your waste to someone else – even a registered carrier. You need to know where your waste will ultimately end up to know it’s been handled properly.

“We want to work constructively with those in the construction and waste sectors so they can operate compliantly, but we will not hesitate to clamp down on those who show disregard for the environment and the law.”

Simple, practical steps to ensure that C&D site waste is handled legally

Construction businesses should check what’s in their waste

  • Different waste types need different treatments and so must be correctly categorised to ensure it goes to a site that is authorised to handle it safely.Businesses can also check if waste is hazardous as different rules might apply.
  • When a waste collector is transporting site waste, contractors must check they have a waste carrier’s licence from the EA.
  • Contractors must also check that the end destination site any waste is taken to is permitted to accept it and has the right authorisations in place. Keep a record of any waste that leaves site by completing a waste transfer note or a consignment note for hazardous waste which records what and how much waste you have handed over and where it is going.
  • Contaminated C&D waste plastic – including low-density polyethylene (LDPE) wrap and film – must be exported with prior consent from the EA as well as competent authorities in transit and destination countries.

Anyone with information regarding the illegal export of waste including C&D waste plastics can contact the EA’s Illegal Waste Exports team at [email protected] or anonymously via Crimestoppers on 0800 555 111 or via their website https://crimestoppers-uk.org/give-information.

Latest news

Breakthrough for HS2 as first Birmingham tunnel section dug

Balfour Beatty VINCI completes 3.5km TBM drive in 652 days drive
2 hours ago

HS2 Curzon Street station redesign approved as timber roof axed

Change to meet stricter fire safety rules and cut maintenance costs
6 hours ago

Care home fire trial collapses

Prosecution withdrawn against four firms including Morgan Sindall Property Services
1 day ago

Leicester rebids £22m station revamp after failed tender race

Council opts for ECI route after receiving one bid for project
7 hours ago

Kier wins East Coast College rebuild job in Great Yarmouth

Work to start this summer for 1,300-student college
7 hours ago

R G Carter wins £28m hospital car park job in King’s Lynn

MSCP paves way for £1.5bn Queen Elizabeth Hospital rebuild in 2027
7 hours ago

London to relax green belt building rules

Sadiq Khan shifts position on planning
7 hours ago

Willmott Dixon wins Great Yarmouth waterfront deal

North Quay 10.5 acres mixed-use scheme to advance
1 day ago

SIG chief quits to join Travis Perkins

Gavin Slark to leave by the end of this year
8 hours ago

Eight take key spots on £250m Prosper framework

Housing and public building upkeep deal for North East awarded
1 day ago

Early call-out for £150m Ebbsfleet Garden City infrastructure

Bidders day to set out plan for Ebbsfleet Central commercial scheme
2 days ago

McLaren storms April contracts league with flurry of wins

Cardiff Bay Arena job headlines a series of big contract wins
1 day ago

Balfour Beatty lifts cash forecast after strong first quarter

Contractor set to hit £1bn average monthly net cash in 2025
1 day ago

Goldman Sachs-owned Adler & Allan buys 180-strong civils outfit

West Country's Glanville Environmental gets new owner
1 day ago

Caddick lands first contract for £200m Skelmersdale revamp

Developer gets green light for masterplan
1 day ago

Van Elle sells HGV fleet to haulage firm

WS Specialist Logistics pays £2.9m to take on fleet and drivers
1 day ago

Buyers more bullish about prospects for year ahead

Residential "resilient" but commercial work a weak spot
2 days ago

Council backs first Brutalist car park-to-flats scheme

Newcastle-under-Lyme multi-storey car park to be reborn as pioneering homes scheme
2 days ago

Hinkley Point C hits peak build with 26,000 jobs

3,000 more workers to join as fit-out work ramps up
2 days ago

Over 40 firms win Wessex Water M&E minor works deal

Broad sweep of specialists picked for AMP8 programme
2 days ago

Spencer lands Scottish bridge hat-trick

Steelwork, gantries and bearing upgrades on Kessock, Forth and Tay crossings
3 days ago

Winners revealed for £1.5bn decarbonisation deal

Fusion21 confirms places for 40 firms: Full list
2 days ago

Cladding firm fined £225,000 after fatal fall

Court hears how cherry picker didn't reach all parts of repair job
2 days ago

Completed buildings caught-up in Gateway 2 chaos

Developer distraught after dealing with Building Safety Regulator
3 days ago

Aviva submits plans for 34-storey City office tower

Subject to planning work to start in autumn 2027
3 days ago

Murphy takes 40% stake in Aussie civils contractor

Firm enters Australasian market with stake in Sydney-based contractor Abergeldie
4 days ago

Moat seeks firm for £420m repairs and maintenance deal

15-year deal to upkeep 20,000 south east homes
3 days ago

Lynch takes over hotel for Sizewell plant operators

Hire giant now in the hotel business to guarantee accommodation for workers
3 days ago

Subcontractors wanted across Scotland

Latest Constructionline event in Glasgow: Register now
3 days ago

Six guilty of £2m bribery over Devon housing site deals

Corrupt building bosses and E.ON project chief and QS sentenced
1 week ago

Contractor services