Plans in for Lancashire 1,700 inmate prison

Aaron Morby 4 years ago
Share

Plans have been submitted for a major new prison in Lancashire adjacent to HMP Garth and HMP Wymott near the town of Leyland.

The prison is one of four planned as part of the Ministry of Justice’s £1bn New Prisons Programme.

This is being delivered by a framework of preselected contractors: ISG, Kier, Laing O’Rourke and Wates.

HMP Wymott 2 will be located between two existing prisons

The new prison to be known as HMP Wymott 2 will be a category C prison with over 1,700 inmates.

They will be held in seven new house blocks rising to four storeys, each and containing around 245 prisoners.

The 74,500 sq m prison will be delivered in several phases. The site will initially need demolition of existing buildings and structures, together with associated engineering works.

Due to the new prison’s proposed location, the relocation of an existing energy centre and bowling club form part of the overall scheme.

Phase 2 and 3 will require construction of the replacement bowling green and club house, a new boiler house and car park for the new prison.

The main prison blocks will be constructed in the fourth phase.

MoJ designer Perfect Circle is to develop site-specific design proposals for Garth Wymott 2 to RIBA Stage 3.

The prison is targeting net-zero carbon operation, a minimum 20% biodiversity net gain. and at least BREEAM Excellent with the possibility of achieving an Outstanding rating.

Other prisons in the pipeline include Full Sutton, in the East Riding of Yorkshire, another new category c prison planned on land adjacent to HMP Grendon and HMP Springhill in Buckinghamshire.

Mace has conducted the feasibility studies for the prison programme and locations.

 

Latest news

£150m Cambridge to Cambourne busway job heads for tender

Construction is expected to start in early 2027
1 day ago

Manchester city council JV to build 1,600 homes

Pension fund backs city housing push on seven sites
2 days ago

Graham set for £100m Cardiff Crossrail phase one

City council to rubberstamp deal this month for Summer start
2 days ago

Go-ahead for 2,300-home scheme at former GSK London HQ

Reuse-first strategy to save 34,500 tonnes of embodied carbon in construction phases
2 days ago

Muse gets green light for office-to-apartments conversion

Latest stage of £500m regeneration of Wythenshawe.
1 day ago

Habiko submits first 240-home scheme in Warrington

PIC, Muse and Homes England partnership lodges plans for twin affordable housing blocks
4 days ago

Probe launched after Falcon tower crane collapse

Luffing jib tower crane collapsed on Hill Group housing site
4 days ago

McLaren tops contracts league on data boom

Mega datacentre deal drives firm to pole position in February rankings
4 days ago

MTX wins £33m Welsh modular hospital revamp

Work is due to start on site in the next few weeks
4 days ago

North West landlord unveils £428m contractor panel

Morgan Sindall, Robertson and Seddon among major lot winners
4 days ago

Housing drags down fledgling construction recovery

Buyers report return to accelerated downturn but still hopeful for year ahead
5 days ago

Taylor Wimpey to spend £150m this year on safety defects backlog

House builder reveals cavity barrier defects behind most of £222m jump in provisions
5 days ago

Near-1,000 homes approved for Isle of Dogs site

42-storey co-living tower and 27-storey affordable housing block backed
5 days ago

Tower crane collapses in London

Site photos show aftermath of failure
5 days ago

Go-ahead for Preston 500-home plan at shopping precinct

St Johns shopping centre to be demolished in city centre regeneration plan
5 days ago

Keltbray lays foundation for HS2 Curzon Street station

Vast 2,011-pile operation finished as Birmingham build powers on
5 days ago

John F Hunt wins Euston Tower demolition

Specialist will take-down 36-storey tower in technically challenging contract
6 days ago

GMI confirmed for green Manchester office scheme

35 Fountain Street will feature cross‑laminated timber
6 days ago

Trio bag £1bn concrete road replacement deal

Kier, Graham and Sisk win 6-year legacy concrete road framework
6 days ago

Former Balfour chief to become Barratt Redrow CEO

Dean Banks to take helm at house builder later this year
6 days ago

Galliford Try lifts full-year outlook after 20% profit surge

Margins strengthen across Building and Infrastructure as order book hits £4.1bn
6 days ago

Consultation to start on merging CITB and ECITB

Government to launch 12 week consultation this month
6 days ago

Vistry boss Greg Fitzgerald announces retirement

Industry giant to step down after 45 years in house building and construction
6 days ago

Bouygues E&S contracting arm reborn as Equans Sci-Tech

Rebrand to target work for pharma, aerospace and tech clients
6 days ago

£231m London Barbican Arts Centre overhaul approved

Major on-site works are due to begin in 2027
7 days ago

Galliford Try lands £16m Hartlepool school rebuild

St Helens Primary project targets net zero in operation
7 days ago

“Energy and optimism” at Kier after strong set of results

Contractor hits target of an average net cash position for the first time in 13 years.
7 days ago

BBA standards body has own accreditation suspended

British Board of Agrement has status suspended by UKAS National Accreditation Body
7 days ago

Scottish Water unveils £13.4bn six-year spend plan

Publicly-owned utility earmarks £8bn for core infrastructure works from 2027
7 days ago