Henry Boot site team finds letter from 1930s plasterers

Grant Prior 4 years ago
Share

A Henry Boot Construction site team has discovered a letter written by builders in 1938 on their Heart of the City job in Sheffield City Centre.

Senior Site Supervisor Carl Gelder (right) and Apprentice Harry Rodgers (left) return the letters
Senior Site Supervisor Carl Gelder (right) and Apprentice Harry Rodgers (left) return the letters

The letter was found rolled up inside a small canister and lodged within a wall cavity at Bethel Chapel on Cambridge Street which is being redeveloped to become a new 15,000 sq ft live entertainment venue.

Dated around the beginning of the Second World War, the letter was written by the foreman of a former local plastering company, Bradbury & Sons – who were working on the site at the time.

The letter lists all the names of the workers involved – who it states were all members of the Plasterers Union. The letter also notes “Boy Teddy” as the apprentice. Apprentices tended to start at the legal age of 14 at the time.

Sheffield Archives has confirmed that Bethel Chapel closed in 1936 and the building was purchased in 1938 by George Binns, who relocated his clothing business ‘Outfitters’ from Moorhead.

As part of the repurposing and renovation works, the small churchyard at the front was removed and a two-storey extension was added to the front of the chapel. This work was likely to be the project that the Bradbury & Sons plasterers worked on when they left their letter.

To create an evolving time capsule the team at Henry Boot has written and added a letter of their own to the canister, which has now been placed back in the same wall.

Henry Boot’s letter recorded the staff members working on the site today and as a direct nod to the original, the letter is signed by today’s Senior Site Supervisor Carl Gelder, and Harry Rodgers – one of the apprentices on site.

Ian Gresser, Operations Manager for Henry Boot Construction, said: “To uncover an old letter or artifact is always an exciting moment, but it’s particularly special to find something directly linked to the construction industry.

“Much of the Heart of the City project is about protecting key heritage, particularly along Cambridge Street. So, adding our own letter to the capsule and contributing to the story of the area means a lot to the team. It’s nice to think that people may read our letter alongside the Bradbury & Sons letter in another 100 years-time.”

 

Latest news

Tide gets go-ahead for over 1,000-home London scheme

Volumetric expert gains planning for co-living homes scheme in Southwark
38 minutes ago

Construction output flickers into life in March

First quarter activity flatlines after slow start to year
4 hours ago

Skanska lifts margin to 4.3% as profit hits £78m

Infrastructure and FM drive near-tripling of profits
13 hours ago

Mayor backs 46-storey student tower at Canary Wharf

City Hall overturns Tower Hamlets council rejection of 912-bed scheme
12 hours ago

Plans go in for 100 acre Port of Tilbury expansion

Construction could start next year on site the size of 70 football pitches
3 hours ago

Inland Homes creditors face £38m hit

Administrator confirms no cash for supply chain
21 hours ago

Durkan dogged by legacy jobs despite return to trading profit

Durkan scales down new homes contracting to focus on retrofit work
18 hours ago

Munnelly founder hands over CEO role to son

Paul David Munnelly steps up to CEO as father becomes chairman
4 hours ago

Barking build to rent towers face rebuild

Major remedial work needed on resi scheme built by Shapoorji Pallonji UK Ltd
1 day ago

London new home starts plunge 38% as Building Safety Act bites

Capital only region to see Q1 fall in NHBC new home registrations
2 days ago

Sureserve swoops for rival compliance outfit Kinovo in £56m deal

Recommended cash offer will take AIM listed contractor private
1 day ago

Crown Golf tees up £1bn plan to build 3,000 homes on course land

Major housing plan for spare land on eight UK courses
1 day ago

Green light for Peterborough Station Quarter £48m revamp

First phase to start before the end of the year
1 day ago

Morgan Sindall starts £38m Caerphilly leisure hub

New swimming pool and health suite forms part of town regeneration plan
1 day ago

145 firms win places on £800m building safety framework

Fusion21 confirms latest winners: Full list
2 days ago

Higgins Homes and site workers face manslaughter charges

Contractor and four site staff charged after woman killed by falling pallet of bricks
3 days ago

Operator spots cracked mast on Hinkley tower crane

Hinkley Point C contractor hit with safety notice over failed mast pin and cracks
2 days ago

Countdown starts for £1bn Birmingham highways bid race

Council will break-up mega framework into five lots
2 days ago

Acciona wins £400m Thames waterworks upgrade

Lea Valley Coppermills water treatment works to get full overhaul
2 days ago

Pension giants pledge £25bn for infrastructure push

Seventeen pension providers pledge to invest in projects
2 days ago

Safety row over London tower ducking fire regs by 30cm

Fire union calls on Mayor to block Bromley flats plan over single staircase
2 days ago

Midgard lands £145m deal to build Edition Birmingham

Construction to start shortly on twin residential towers
3 days ago

McAleer & Rushe set to break £500m turnover barrier

Pre-tax profit jumped 16% to £46m last year
3 days ago

Top design team picked for £2.5bn York Central scheme

Massive city centre regen scheme moves to detailed design
3 days ago

MoD to bid £100m command HQ enabling works

Hertfordshire joint forces command centre expansion advances
3 days ago

Failed shed specialist Marbank owed suppliers £10m

Contractor was facing a string of adjudication claims
3 days ago

New scaffolding training trade body launches

Scaffolding Training Alliance formed amid disquiet caused by planned training changes
3 days ago

£1.8bn framework planned for green retrofit drive

Procure Plus to invite bids later this month
3 days ago

Breakthrough for HS2 as first Birmingham tunnel section dug

Balfour Beatty VINCI completes 3.5-mile TBM drive in 652 days
6 days ago

HS2 Curzon Street station redesign approved as timber roof axed

Change to meet stricter fire safety rules and cut maintenance costs
6 days ago

Contractor services