McLaren to build new £32m HQ for Salvation Army

Grant Prior 1 year ago
Share

The Salvation Army has confirmed  McLaren Construction as the main contractor on its new 55,000 sq ft territorial headquarters in Southwark, London.

The £32m HQ building will allow the international charitable organisation to relocate from its current headquarters, consolidating its administrative office and training provision in one location.

The Breeam Excellent building will be located at the William Booth Training College site in Denmark Hill, Southwark – an underutilised part of the Salvation Army’s existing campus.

The HQ varies between five and six storeys and includes open-plan office space, designed to be flexible and support smart working, arranged around an atrium. It will accommodate up to 450 employees and Salvation Army officers.

Additional Facilities within the headquarters include a series of multi-function rooms, recording studios, an editing suite and a café open to the public. A landscaped terrace at the southern end of the site will provide a private space and retreat for staff to enjoy.

The architectural intent is to have exposed concrete soffits, with extensive architectural timber throughout.

Darren Gill, Managing Director, London for McLaren Construction, said: “McLaren’s appointment on The Salvation Army Territorial headquarters is testament to our expertise, can-do culture and an ability to deliver exemplary projects, exceeding expectations.

“We recognise the importance of delivering this once in a lifetime project for The Salvation Army, a renowned organisation steeped in values. We are delivering a new HQ, bringing together disparate facilities and employees into a modern and sustainable building, on the site of the iconic William Booth Training college, where we are honouring the place and neighbouring area, while providing collaborative and much needed workspace for the international charity.”

The façade will be carefully detailed in precast masonry panels, stone and glazing and take a cue from the adjacent listed buildings and feature a series of tall, multi-brick and stone bays punctuated by brick piers, creating a strong vertical emphasis on the street.

The project is scheduled for completion in 2023.

Latest news

RG Group wins £82m Leeds build to rent job

Work to start on developer Hub's 488-flat Latitude Blue scheme
8 hours ago

Speedy kit count finds £20m of missing equipment

Hire giant launches review after shortfall of small equipment
13 hours ago

Administrators appointed at concrete flooring specialist

Malin Industrial Concrete Floors has worked with a host of major contractors
1 day ago

Barratt sees early signs of a New Year trading uplift

Britain's biggest house builder reports strong first half but warns it is still too early to call depth of 2023 downturn
13 hours ago

Balfour launches new guide for inclusive behaviour

Right to Respect inclusivity initiative shows "where the boundaries are"
23 hours ago

Concrete specialist Byrne Bros names new boss

Forty-year-old project director Philip Beausang promoted
13 hours ago

World’s first net zero cement production trial starts

Process combines scrap steel recycling in a the furnace with cement production
13 hours ago

VINCI to build new £100m Blackpool office scheme

Contractor to build new seven-storey regional hub for civil servants
1 day ago

Shapps to lead new Net Zero Government department

Business Energy and Industrial Strategy to split into three new Government departments
1 day ago

M&E firms readied for £545m Pagabo deal

New framework to meet demand for smarter buildings, particularly in healthcare and education
2 days ago

Mivan bags £100m haul of hotel and resi fit-out jobs

London hotel and prime residential orders put firm on track for £75m revenue this year
2 days ago

Graham hospital site hut complex destroyed by blaze

Site offices ravaged by fire which took eight hours to get under control
2 days ago

Mace wins £150m over-station job at Liverpool Street

Latest win from Aviva Investors and Allianz Real Estate following earlier Moorgate contract
2 days ago

Turner & Townsend and alinea join forces

110 alinea staff join T&T cost management team
2 days ago

Developer confidence high in big regional cities

Crane survey reveals Birmingham, Leeds and Manchester can count on resilient development pipelines
2 days ago

Caddick wins £21m Oldham off gas housing scheme

West Vale housing job forms part of £160m plan for 1,100 homes in Oldham
2 days ago

Buyers see brighter days ahead despite resi slump

"Construction can see a path through for better outcomes in 2023"
2 days ago

Australian firm to buy £300m gigaplant backer Britishvolt

New owner vows to complete giant factory in Northumberland
3 days ago

Project delays curb Ardmore growth ambitions

Refurb and housing specialist sees profit fall after challenging year of delays and supply chain failures
3 days ago

Scaffolders and sparks strike at antibiotic plant

Engineering construction workers down tools in bonus pay row
3 days ago

McAlpine bags £1bn Sellafield concrete structures deal

Contractor signs 17-year concrete structures and groundworks framework
3 days ago

Moving in to new markets paying off for McLaren

Contractor carving out new niche as leading player in heavy refurbs
5 days ago

Heavy materials sales fall amid slowdown in starts

Light side product sales grow helped by pace of activity for refurbs and energy-efficient retrofits
3 days ago

Plan to add retentions record to payment reporting law

Government consults on tougher reporting to include disputed invoices and retention policies
6 days ago

Morgan Sindall wins £88m Beckton DLR depot upgrade

Delayed work to start on Docklands Light Railway train maintenance depot in East London
6 days ago

Hare and Severfield win £250m Sellafield deal

Country's two biggest steelwork contractors secure 17-year framework
6 days ago

Max Steward returns to head up ISG’s Agility fit-out arm

Former ISG project director returns after three years to take up MD role
6 days ago

McLaren wins massive Portland House refurb

Construction to start this year on £380m revamp of 28-storey building in central London
6 days ago

Green light for £275m HS2 Midlands nerve centre

Trio of contractors battling it out to win huge new depot near Birmingham
6 days ago

Winners named for Government £10bn offsite framework

29 firms secure places on mega framework for schools, healthcare, defence and justice jobs
7 days ago

Contractor services