Vinci seals £77m Bristol student accommodation job

Aaron Morby 1 year ago
Share

Vinci Construction UK has confirmed the signing of a major student accommodation project in Bristol for the University of the West of England.

Student Accommodation Project 3 at its Frenchay Campus is being hailed as one of the UK’s largest Passivhaus certified developments in the UK.

SAP3 will span 280,000 sq ft and fit 900 bed-spaces in a mix of studios and four, six or eight-bed clusters.

Once complete, the complex of buildings will operate at a 75% carbon reduction compared to traditional design and construction.

The £77m project is due to start main construction in November and will be handed over prior to the beginning of the 2023/2024 academic year.

SAP3 was designed by architect Stride Treglown and will run with reduced energy consumption compared to similar-sized traditional new builds.

The project is the first phase of planned development that will deliver a total of over 2,250 new student beds on the Frenchay campus.

Project Team



Architect, Landscape, BIM and Interiors: Stride Treglown
Cost Consultant: Turner & Townsend
Project Management: JLL
Civil & Structural Engineer: Curtins
M&E Consultant: Amber Management & Engineering Services
Environmental & Passivhaus Consultants: QODA Consulting
Passivhaus Certifier: Etude

Latest news

Gove issues six weeks ultimatum to sign building safety contract

Developers told to sign Government contract issued today or be banned from building homes
3 hours ago

Firm fined £120,000 for lifting two builders in a telehandler bucket

Rochdale builder Hoyle Developments fined after repeated safety breaches
3 days ago

Hunt quashes reports HS2 will stop at Old Oak Common

Chancellor says no "conceivable circumstance" where HS2 would not terminate in Central London
2 days ago

London Chiswick roundabout 24-storey tower approved

Plan for 255 flats and offices finally passed after four previous schemes failed to proceed
2 hours ago

Construction forecast to fall by nearly 5% this year

Private new build housing and RM&I to drive fall but infrastructure growth will also slow
2 hours ago

Mace wins green office block at famous Fleet Street pub site

Contractor to build new 12-storey block pioneering latest sustainable construction methods
3 hours ago

Firms readied for raft of net zero and building safety frameworks

Procurement specialist LHC to tender five mission zero retrofit and building compliance deals
3 days ago

Plans in for two Derby city centre schemes of 1300 homes

Eagle Quarter and Bradshaw Way schemes to breathe life into Derbion centre area
3 days ago

United Living names new infrastructure services MD

Former SSE Contracting operations director John Farrell joins multi-service contractor
3 days ago

Sunak promises Bill to build £100m Holocaust Memorial

Holocaust Memorial Bill will update historic legislation allow the building of a new memorial in London
3 days ago

Mace Interiors to transform Hanover Square office block

Refurbishment work to start this year on major revamp of Mayfair building
4 days ago

Garden village in Darlington gets £43m infrastructure cash

Transport and highways work will pave way for 2,000 new homes
4 days ago

Plans in for Lendlease £1.9bn Birmingham Smithfield scheme

Ambitious plans for City's old market area advance with enabling works hoped to start this year
5 days ago

TClarke on track for £500m turnover this year

Building services specialist sees 2022 revenue and profit up by around a third
4 days ago

McAlpine tenders M&E work at £340m Museum of London job

Demolition and first MEPH work packages come out to bid
4 days ago

BAM signs off on £65m Manchester First Street office job

Briggs & Forrester lined up for MEP package
4 days ago

Eurocell gets £1m insurance payout after cyber attack

UPVC giant details cost-cutting round as market weakens
4 days ago

Mace on board for £440m Manchester Airport upgrade

Green light for second phase of airport transformation programme
5 days ago

Inland Homes losses now set to hit £91m

House builder sells land as construction problems and slower sales wreck balance sheet
5 days ago

Plans in for Stoke on Trent city centre mixed-use scheme

Etruscan Square scheme consists of an arena, 300 homes, hotel and multi-storey car park
5 days ago

Landsec unveils latest £850m Buchanan Galleries plan

Subject to planning, earliest date for first construction would be summer 2024
6 days ago

Van Elle soars to record revenue in first six months

Revenue up a third to £80m at piling specialist with improved order levels ahead
5 days ago

Work starts on BSI Kitemark for MMC homes

Government backs new British Standard to lift barrier to modern methods of construction
5 days ago

Watchdog blasts “rushed” UK Infrastructure Bank

Funding deals only seen so far on broadband and solar farms projects
5 days ago

60,000 Grandfather Rights skills cards soon to be invalid

New guidance issued for how experienced workers can get new CSCS cards before end of 2024
6 days ago

Worker dies after cardiac arrest in HS2 site office

Colleagues and emergency services tried to save man after he collapsed in tunnelling office
6 days ago

Mace wins £150m life sciences centre

Construction to start in April creating 1,000 jobs on London's Euston Road
7 days ago

Redrow switches to heat pumps as standard in all new homes

House builder commits all new detached homes from this month to have heat pumps and underfloor heating
6 days ago

Gilbert Ash set for Barnfield College next phase

Contractor understood to have won latest £26m deal at Luton site
6 days ago

Willmott Dixon wins £48m zero-carbon West Sussex school

Work to start in April on Passivhaus-designed Bedelands Academy secondary school project
6 days ago

Contractor services