Barefoot builders found on Manchester housing site

Grant Prior 2 years ago
Share

A contractor has been sentenced after shocked HSE inspectors discovered a catalogue of safety failings on a Manchester new housing job including builders working barefoot.

An HSE picture of the site
An HSE picture of the site

Manchester Magistrates’ Court heard how between 2019 and 2020 Mustapha Matib had employed several groundworkers to excavate land at Gibraltar Lane, Denton in preparation for the construction of a family home.

An inspection was carried out at the site in August 2020 after neighbours raised significant concerns. Work was stopped when serious fall risks and potential collapse were identified.

An HSE investigation found that as principal contractor Matib had failed to prepare a construction phase plan, with risk assessments and method statements detailing how the work would be safely carried out.

He also failed to appoint a site manager with suitable skills, knowledge and experience to plan, manage and monitor the work; and ensure the health, safety, and welfare of those carrying out the work or others who may be affected by their actions.

Inspectors also identified a large, deep and unprotected excavation, which gave rise to a foreseeable fall risk. In addition, excavations were not shored or suitably battered back to prevent the risk of collapse.

Personal protective equipment had not been provided and some workers were working barefoot on site.

The site was not adequately secured to prevent unauthorised persons from entering and a neighbouring property had been undermined with parts of the property at risk of collapse due to the excavation work.

Matib of Bradford pleaded guilty to safety breaches and was sentenced to sixteen weeks imprisonment suspended for twelve months, ordered to carry out 200 hours unpaid work and pay costs of £5,673.

Speaking after the hearing, HSE inspector Phil Redman said: “Inspectors will not hesitate to take appropriate enforcement action against dutyholders who fall below the required standards and put lives at risk.”

Latest news

McAlpine pulls out of £55m Carlisle Citadels project

University of Cumbria starts hunt for replacement contractor
3 days ago

Strabag UK suffers further big trading loss

Austrian contractor is gearing up for major presence in the UK market
2 days ago

Durham Uni picks UPP for £130m student scheme

Firm will deliver 1,000 self-catered bed spaces
2 days ago

Architects now upbeat after 10-months of work gloom

Larger practices see rising workloads in next three months
2 days ago

Motorist dies after collision with road paver

Police Scotland investigating fatal crash
3 days ago

McLaren Living appoints HG Construction for £69m scheme

Build to Rent scheme will transform former vacant car park site in Leeds city centre
3 days ago

Squibb liquidator probes £2m of “missing” plant

Machinery, cars and scrap metal have disappeared at demolition specialist
3 days ago

Galliford Try to re-enter affordable homes market

Contractor sets out new five-year plan to build margin to 4%
3 days ago

Former Sellar chief to lead civils contractor Kilnbridge

Owen Dannatt joins as new CEO as founder Dermot McDermott becomes Chairman
3 days ago

Hunt starts for nuclear fusion plant construction partner

Fusion energy plant to be built at West Burton coal power station site.
3 days ago

National Grid raises £7bn for big infrastructure upgrade

Rights issue to fund a major round of capital investment in energy infrastructure
3 days ago

Grenfell police probe to last at least until end of 2025

19 companies and 58 individuals could eventually face charges
4 days ago

Mace confirmed on £100m London office retrofit

Work underway on Helical's 100 New Bridge Street job near Ludgate Circus
4 days ago

Wylfa chosen for next big nuclear power station build

Government names Anglesey site for a large-scale gigawatt nuclear power plant.
4 days ago

Bowmer & Kirkland trading profit halves

Contractor buys HVAC specialist Adcock despite challenging market
4 days ago

Piling specialist Van Elle plans further job cuts

Piling specialist plans further cost savings in face of lower demand
4 days ago

Civils contractor A Catlow files administration notice

High voltage cable specialist lodges court notice
4 days ago

Green light for ARC Oxford lab campus

Work to start later this year on £40m Ascent building job
4 days ago

Stonehenge tunnel hit by another legal delay

Court upholds latest appeal against £1.7bn scheme by campaigners
5 days ago

Plans go in for huge Olympic Park construction hub

Bow Goods Yard could deliver 3.5m tonnes of materials a year to sites across London
5 days ago

40% affordable homes target for Labour’s new towns

Labour pledges to select new town sites by end of first year
5 days ago

Plan for £100m Liverpool Baltic station

Construction work could begin next year
6 days ago

Surgo Construction went down owing £4.5m

Biggest creditor is Bellway Homes after dispute on housing job
5 days ago

Vistry seals £157m West London housing deal

Around 575 homes to be built at Merrick Place scheme in Ealing
5 days ago

Streamlined Watkin Jones returns to profit in first half

Multi-room specialist sees secured work pipeline hit £1.4bn
5 days ago

Bellway hires ex-brickie as group construction chief

James Griffin to oversee move to the Future Homes Standard and timber frame.
5 days ago

Persimmon under fire for delays to £10m relief road

West Suffolk Council serves Breach of Condition Notices after timetable slips again
5 days ago

BAM wins £33m Kent secondary school job

Replacement Swanley academy to be built at live school site
5 days ago

Aluminium cladding specialist collapses

Melton Mowbray-based firm worked for several main contractors
6 days ago

Brickwork contractor Lee Marley returns to profit

Affordable and rental homes demand lifts brickwork contractor
6 days ago

Contractor services