ISG nets £50m London office green makeover

Aaron Morby 3 years ago
Share

ISG has won a £50m project to redevelop and refurbish Woolworth House in the heart of London’s West End.

Woolworth House will be renamed Metropolis once the overhaul is complete
Woolworth House will be renamed Metropolis once the overhaul is complete

The mixed-use scheme, for General Projects with Henderson Park, will raise the building’s gross area by 40% to over 236,000 sq ft.

It includes the complete refurbishment of the existing eight-storey office building, located at 242 Marylebone Road in Westminster.

Jim Knowlton, ISG project director, said: “Originally constructed in the 1950’s, Woolworth House is an exemplar of how a low carbon approach can transform our cities’ dated building stock.

“Underpinned by environmental, social and governance considerations, the scheme shows how adapting assets into smarter office and retail environments, with more green spaces for occupants, can future proof London’s commercial property market.”

Renamed Metropolis, the new building will offer new stepped green roof terraces across every floor.

An events auditorium, rooftop-bar, on-site coffee shop, cyclist zone as well as new health and wellbeing amenities complete the revamp.

A new extension will significantly increase outdoor and green space, adding over 6,000 sq ft of new landscaped gardens.

To achieve this, the existing courtyard area will be infilled to the seventh floor, providing tiered planted terraces and the structure will be extended with various additions across floors three to eight using a steel frame with cross laminated timber (CLT) slabs.

In addition, the existing roof plant enclosures will be removed and consolidated, allowing the creation of rooftop office pavilions on level five and eight.

Designed by London architect AHMM, the environmental performance of the refurbished building will be boosted to a BREEAM rating of Outstanding.

Careful retention of existing building material will result in over 4,500 tonnes of carbon saved during the construction process and diverted from landfill.

The use of engineered timber floors to all building extensions has dramatically reduced embodied carbon, equating to a 73% improvement against RIBA 2030 targets.

The masonry facades, concrete frame and cores will also be retained while CLT will be used for all new floors forming the building’s extension.

 

 

Latest news

Buyers more bullish about prospects for year ahead

Residential "resilient" but commercial work a weak spot
18 hours ago

Council backs first Brutalist car park-to-flats scheme

Newcastle-under-Lyme multi-storey car park to be reborn as pioneering homes scheme
21 hours ago

Hinkley Point C hits peak build with 26,000 jobs

3,000 more workers to join as fit-out work ramps up
20 hours ago

Over 40 firms win Wessex Water M&E minor works deal

Broad sweep of specialists picked for AMP8 programme
21 hours ago

Spencer lands Scottish bridge hat-trick

Steelwork, gantries and bearing upgrades on Kessock, Forth and Tay crossings
1 day ago

Winners revealed for £1.5bn decarbonisation deal

Fusion21 confirms places for 40 firms: Full list
20 hours ago

Cladding firm fined £225,000 after fatal fall

Court hears how cherry picker didn't reach all parts of repair job
21 hours ago

Early call-out for Ebbsfleet Garden City infrastructure

Bidders day to set out plan for Ebbsfleet Central commercial scheme
21 hours ago

Completed buildings caught-up in Gateway 2 chaos

Developer distraught after dealing with Building Safety Regulator
2 days ago

Aviva submits plans for 34-storey City office tower

Subject to planning work to start in autumn 2027
2 days ago

Murphy takes 40% stake in Aussie civils contractor

Firm enters Australasian market with stake in Sydney-based contractor Abergeldie
2 days ago

Moat seeks firm for £420m repairs and maintenance deal

15-year deal to upkeep 20,000 south east homes
2 days ago

Lynch takes over hotel for Sizewell plant operators

Hire giant now in the hotel business to guarantee accommodation for workers
2 days ago

Subcontractors wanted across Scotland

Latest Constructionline event in Glasgow: Register now
2 days ago

Six guilty of £2m bribery over Devon housing site deals

Corrupt building bosses and E.ON project chief and QS sentenced
6 days ago

1,650 former ISG staff launch legal claims

Redundancy Payment Service facing payout of more than £9m
7 days ago

Plans lodged for £1bn cancer research centre in Sutton

London Cancer Hub will deliver around 1m sq ft of lab and research space
6 days ago

London Met Uni seeks firm for £284m estate revamp

Contractor wanted to deliver capital works and FM
6 days ago

Delayed £2bn estate rebuild back on as Berkeley signs deal

Birmingham council development agreement paves way for 2028 Ladywood start
7 days ago

Tilbury Douglas boosts margin to 2.1% as profits double

Firm targets 3.5% margin by 2029 under new business plan
7 days ago

Subbies battle for fastest bricklayer title

Winchmore management team go back on the tools
7 days ago

Green light for revised McLaren Reading revamp

Mixed-use plans to transform Broad Street Mall site
6 days ago

Three arrested in Blu-3 and Mace bribery probe

Serious fraud office swoops over alleged £3m bribes to former Mace associates
1 week ago

Scotland’s most complex A9 dualling job heads to market

Market testing starts for £205m Pitlochry to Killiecrankie 6.4km upgrade
1 week ago

Unite signs £390m student beds JV with Manchester Met

Construction at Cambridge Halls site to start next year
7 days ago

Turkish contractor Limak to build new Luton Town stadium

Construction to start this summer on 25,000-seater venue
1 week ago

Kitchen fitter crushed to death by concrete blocks

House builder goes into liquidation before court case
7 days ago

Mears clinches £230m renewal for key Milton Keynes housing deal

Housing upkeep contractor achieves 100% renewal rate in bust rebid period
7 days ago

Murphy on board at new £32m rail station

Construction to start next year at Golborne station
1 week ago

HS2 engineers finish UK’s heaviest bridge slide early

A46 Kenilworth Bypass reopens 30 hours earlier than planned
1 week ago

Contractor services