Building products firm fined £2m over death of worker

Grant Prior 3 weeks ago
Share

A wooden board manufacturer has been fined £2.15m for health and safety failings which led to the tragic death of an employee.

Norbord Europe Limited was found guilty of two charges under health and safety legislation  at Perth Sheriff Court.

The court heard that on 13 July 2016 at the company’s site in Cowie, Stirlingshire, George Laird, along with three colleagues, was involved in maintenance work on a wood drier. During this work, a high-pressure hose was used to remove hot ash from within a hot gas duct above a combustion chamber.

Laird, 64, who was in the area below the combustion chamber, was enveloped by hot water, steam and ash and sustained burns over 90 percent of his body. He died from his injuries the next day.

The HSE investigation found evidence of a catalogue of failings by the company.

Evidence over the course of the trial showed the company had failed to provide a safe system of work for employees removing hot ash from the system and  they were left to devise their own methods of working.

Employees were exposed to risk of personal injury from falling ash within the combustion chamber since its installation at the site in 2014. There were several near misses involving other employees working during that time.

Debbie Carroll, Assistant Procurator Fiscal and Head of the Health and Safety Investigation Unit, said: “This was a lengthy and complex case. The detailed evidence led against Norbord Europe Limited over the four-week trial allowed the jury to come to a unanimous verdict.

“The tragic death of George Laird could have been prevented had suitable and sufficient measures been put in place.

“The prosecution and the sentence serve to highlight that a failure to fulfil health and safety obligations can have tragic consequences and those responsible will be held to account for their failings.

“Our thoughts are with Mr Laird’s family at this difficult time.”

Speaking after the hearing HSE inspector Garry Miller said: “Those in control of work have a responsibility to set up safe methods of working and to provide the necessary information, instruction and training to their workers to carry out the safe methods of working.

“If a suitable safe system of work had been in place prior to the incident, the death of Mr Laird could have been prevented.”

Latest news

Worker killed on £683m waste power plant site

Fatal collision involving heavy good vehicle on giant north London site
40 mins ago

Go-ahead for £200m lithium refinery on Teesside

Work to start next year on Europe's first lithium hydroxide processing plant
15 hours ago

HS2 agency workers paid the wrong wages

Payroll software problems leave workers out of pocket
16 hours ago

Electric car whizz joins O’Rourke

Contractor looking to learn tech lessons from other sectors
15 hours ago

Electrical contractors still confident despite staff shortages

Order books healthy but worries grow over margins
13 hours ago

BAM to deliver £44m Yeovil College campus build

BAM will submit a planning application next month to start work later next year
17 hours ago

Bouygues starts London 700-home council estate rebuild

Developer Linkcity seals financial close on Old Kent Road Tustin Estate job
16 hours ago

Construction’s “Leading Lights” recognised

Full details of latest winners of Considerate Constructor Scheme's latest awards
16 hours ago

ISG wins £600m Hertfordshire Hollywood film studio job

Holywood studio Sunset awards pre-construction contract for 90-acre studio complex in Broxbourne
4 days ago

NAO calls for road programme cuts as costs soar

Public spending watchdog calls for roads programme review amid project delays and cost overruns
4 days ago

Kier hires Laing O’Rourke veteran for London office push

Gus Wright takes up new London regional director role in January
4 days ago

VolkerFitzpatrick lands starring role on £174m film studios

Contractor to start main works on Eastbrook Studios in Dagenham
4 days ago

Wates poaches Balfour director to lead North West operation

Sarah Cooke to lead Wates Construction in the North West
4 days ago

£3.4bn Sellafield infrastructure race delayed to New Year

Contest to start in January for four partners in infrastructure delivery shake-up
4 days ago

Rebuilt TBM launches into second HS2 tunnel drive

Balfour Beatty Vinci TBM Dorothy starts second Long Itchingwood HS2 drive
5 days ago

Materials lead times back to pre-pandemic levels

Pinch points around gas boilers to persist until mid-2023 because of shortages of semiconductors
5 days ago

Bond strength helps TClarke towards £500m turnover target

Building services giant predicting a record year in 2023
5 days ago

All-clear for £125m Guildford Debenhams redevelopment

Native Land's St. Mary’s Wharf will comprise 185 homes
5 days ago

Thompsons brings down historic Redcar blast furnace – video

Redcar demolition clears the way for new net zero future
5 days ago

Wolverhampton picks McLaughlin & Harvey for £50m learning campus

Main construction to start next spring on City Learning Quarter
5 days ago

Michelmersh buys offsite brick cladding and chimney maker

Pre-built brick products producer Fabspeed sold for over £6m
5 days ago

Pagabo acquires mental health monitoring business

Framework giant makes move after Moodbeam goes into liquidation
5 days ago

Green light for London timber office block

Construction to start next year on six-storey cross-laminated timber block
6 days ago

Government pushes ahead with £3bn building safety levy plan

Affordable homes projects and small schemes developed by SMEs will be exempted
6 days ago

Rejigged £340m Museum of London plan approved

McAlpine tipped to take £340m job for new museum at Smithfield market
6 days ago

Ex-construction minister joins cladding repair firm

Intelligent FS appoints Lord Richard Harrington after government contracts send turnover surging
6 days ago

Willmott Dixon limbers up for £18m Rainham sports centre

Work to start in April on New Splashes Sports Centre in Rainham
6 days ago

Plans in for BBC’s new home in Birmingham

Project will be one of the first net zero carbon in construction office buildings
6 days ago

McLaughlin & Harvey wins Lowestoft harbour design

Lowestoft Eastern Energy Facility is expected to cost around £25m to build
7 days ago

Van Elle first-half revenue hits record £81m

Piling specialist upgrades full-year profit forecast after strong first-half trading
7 days ago

Contractor services