VINCI to build new £100m Blackpool office scheme

Grant Prior 2 years ago
Share

VINCI is mobilising on site after winning the main contractor role on a new £100m office building in Blackpool.

The building forms part of £350m Talbot Gateway regeneration scheme that is transforming the town centre.

Muse and Blackpool Council have now confirmed VINCI’s, role in bringing forward the 215,000sq ft highly-sustainable office building for the Civil Service.

More than 3,000 public servants will relocate to the seven-storey regional hub when it completes in March 2025.

Alan McBride, projects director at Muse, said: “We’re pleased to appoint VINCI Building and to start on site building this fantastic facility on behalf of Blackpool Council.

“As a business, we’re committed to creating places with purpose for people that offer tangible environmental and social benefits to local communities, and are looking forward to seeing the building progress.

“We’re focused with partners as we re-energise the town centre, by delivering a place that blends the town’s rich history with its aspirations for the future. We’re delighted to be playing such an important role with the council in delivering our shared vision for building a better, more attractive and resilient Blackpool”

Gary Bowker, regional managing director at VINCI Building, said: “The development of such a significant Grade A office in the town centre will significantly increase daytime footfall once completed and will undoubtedly benefit local businesses over the long term.

“Low energy and low carbon design and material choice has been at the heart of decision making and this will result in a truly energy efficient, low carbon building that we can all be proud of. It has been a real team effort through the pre-construction phase, and we look forward to this continuing on to site.”

The new building has been designed by architects, Make to BREEAM “Excellent” standard.

An inclusive approach to sustainability was taken from the outset to make sure the building will be as energy-efficient as possible, with high levels of insulation and air source heat pumps to provide low-carbon heating and cooling.

Demand-driven ventilation will improve indoor air quality, while at the same time allowing energy savings during times when the building is not occupied.

During the building’s inception, partners completed early-stage whole life and upfront embodied carbon assessments, to eliminate inefficiencies where possible and reduce the building’s whole carbon footprint.

This results in the new offices aiming to reduce its upfront embodied carbon intensity to 800 kgCO2e/m2. compared with 1100kgCO2e/m2 for a typical office development.

Latest news

Wates boss returns after collapse of his own contractor

Paul Nicholls was head of the failed Real construction group
10 hours ago

New Fair Payment Code goes live today

Latest bid to get subcontractors and suppliers paid within 30 days
13 hours ago

Lincolnshire concrete supplier files administration notice

Ever Readymix Concrete & Screed operates three depots and a fleet of 20 trucks
14 hours ago

Graham lands first deal on Liverpool’s largest brownfield site

Contractor bags infrastructure package on 10.5 hectare site
1 day ago

Bouygues UK boss to step down

Fabienne Viala to leave after eight years at the helm
1 day ago

Galliford Try scoops £87m brace of London jobs

Firm will redevelop a prominent corner building on Sloane Street in Chelsea
13 hours ago

New HS2 boss Mark Wild starts amid prep for final TBM drives

Former Crossrail CEO starts with a sharp focus on controlling costs
1 day ago

Ten consultants land Thames Water major upgrade places

Firms will share £400m of fee work over next five years
1 day ago

Rayner ultimatum to fix all unsafe tall buildings by 2029

Recladding work must start on all 18m+ resi buildings by 2027
1 day ago

ISG administrator finds just £35m to pay down £1.1bn debt

Failed firm was set to report £148m blackhole from legacy jobs
2 days ago

Redesign needed on Colas “bridge to nowhere”

Technical challenges continue as £38m scheme faces further delays
2 days ago

Skanska UK shakes-up boardroom team

Four new board appointments as two directors step down
2 days ago

Ultra rich clamour for Mace super prime resi scheme

Topping out at £2bn 1 Mayfair scheme where homes start at £35m
2 days ago

Watkin Jones wins £48m St Helen’s affordable homes deal

Firm to build nearly 300 homes for housing association
2 days ago

Barratt sets start date for High Barnet station scheme

Latest scheme to be delivered by the £1.9bn West London Partnership
2 days ago

Investors lose £26m after M&E contractor goes under

78 private investors hit by Gallant Building Services collapse
5 days ago

First contractor call for £80bn Government mega-framework

Seven-year deal will cover construction work across all departments
5 days ago

Transport Secretary quits Cabinet

Louise Haigh resigns over stolen mobile phone revelations
5 days ago

NHS modular specialist looks to strike deal with creditors

Catfoss Group Manufacturing applies for Company Voluntary Arrangement
5 days ago

Kier bags £23m Cheadle Eco Business park job

Contractor beats rival Galliford Try to deliver Stockport council's green business park
5 days ago

Willmott Dixon wins £24m Leeds council housing scheme

Firm will build 82 council houses on site of Hough Top school
5 days ago

Welding crisis road bridges revealed

Bridge projects in Midlands, Gateshead and Cornwall impacted
6 days ago

£1bn Bishopsgate Goodsyard phase one go-ahead

London Mayor approves 550,000 sq ft office scheme above Shoreditch station
6 days ago

Costain poised for major HS2 tunnel fit out deal

Latest major deal on project due imminently
6 days ago

New builds overtake refurbs in London office market

Drop in new construction starts but developers remain bullish
6 days ago

Willmott Dixon wins £23m net zero Surrey SEND school

Hopescourt School job takes low carbon work pipeline to £1.4bn
6 days ago

£1.6m fine after mast climber crush tragedy

Court hears how worker died while unloading work platform
6 days ago

Severfield welding crisis hits five National Highways bridges

Full penetration butt welds under scrutiny as weight restrictions imposed
7 days ago

HS2 awards £3bn of track contracts

Ferrovial BAM and Colas Rail among 'rail systems' winners
1 week ago

Chinese diggers face 83.5% duty after JCB dumping complaint

Fair trade body finds UK kit prices were undercut by 23%
7 days ago

Contractor services