Call grows for bolder 18m second staircase rule for flats

Aaron Morby 2 years ago
Share

A coalition of industry professional bodies including the Chartered Institute of Building have joined fire chiefs in calling on the Government to introduce the second staircase rule to 18m tall buildings and above rather than the 30m being proposed.

The Government went out to industry consultation late last year on its plan to force developers to design in second staircases in all new housing blocks rising to around 10 storeys (30m) and above.

In advance of the new rule being introduced, the Mayor of London has adopted the 30m rule, forcing many schemes back to the drawing board for a complete redesign.

The Department for Levelling Up, Housing and Communities said the extra fire safety measure at 30m could cost developers around £1.6bn over a decade.

Yesterday, the Royal Institute of British Architects wrote to Michael Gove, Secretary for the Department for Levelling up, Housing and Communities.

The letter, signed by eight organisations representing the built environment sector, fire safety and disability rights, urges him to reduce the proposed 30m height threshold for an additional staircase in new residential buildings.   

It said: “We are calling on government to reduce the height threshold for more than one staircase to 18 metres – implementing what we believe to be best practice, improving safety for occupants, and harmonising standards with the wider regulatory environment. This would also align with rules in Scotland, where an additional staircase from 18 metres has been required for four years.

The letter was signed by: 

  • Royal Institute of British Architects (RIBA)
  • Royal Institution of Chartered Surveyors (RICS)
  • Chartered Institute of Building (CIOB)
  • National Fire Chiefs Council (NFCC)
  • Housing Learning and Improvement Network (Housing LIN)
  • Disability Rights UK
  • Inclusion London
  • Claddag (Leaseholder Disability Action Group)

RIBA President Simon Allford said:  “Five years have passed since the fire at Grenfell Tower, and still we must make the case and take bolder action to help prevent further avoidable tragedies.

“Decisive action to make buildings as safe as is reasonably possible is long overdue. We urge the Government to improve fire safety standards – and clarity on appropriate staircase design and provision is essential. 

“We know that greater numbers of people are evacuating rather than ‘staying put’ during fire incidents post-Grenfell and we must ensure occupants have access to a safe, smoke-free evacuation route. 

“The Government’s current proposal fails to address our shared concerns. We stand ready to support government action on addressing all our concerns.” 

Latest news

Breakthrough for HS2 as first Birmingham tunnel section dug

Balfour Beatty VINCI completes 3.5km TBM drive in 652 days drive
2 days ago

HS2 Curzon Street station redesign approved as timber roof axed

Change to meet stricter fire safety rules and cut maintenance costs
2 days ago

Care home fire trial collapses

Prosecution withdrawn against four firms including Morgan Sindall Property Services
3 days ago

Leicester rebids £22m station revamp after failed tender race

Council opts for ECI route after receiving one bid for project
2 days ago

Kier wins East Coast College rebuild job in Great Yarmouth

Work to start this summer for 1,300-student college
2 days ago

R G Carter wins £28m hospital car park job in King’s Lynn

MSCP paves way for £1.5bn Queen Elizabeth Hospital rebuild in 2027
2 days ago

London to relax green belt building rules

Sadiq Khan shifts position on planning
2 days ago

Willmott Dixon wins Great Yarmouth waterfront deal

North Quay 10.5 acres mixed-use scheme to advance
3 days ago

SIG chief quits to join Travis Perkins

Gavin Slark to leave by the end of this year
2 days ago

Eight take key spots on £250m Prosper framework

Housing and public building upkeep deal for North East awarded
3 days ago

Early call-out for £150m Ebbsfleet Garden City infrastructure

Bidders day to set out plan for Ebbsfleet Central commercial scheme
4 days ago

McLaren storms April contracts league with flurry of wins

Cardiff Bay Arena job headlines a series of big contract wins
3 days ago

Balfour Beatty lifts cash forecast after strong first quarter

Contractor set to hit £1bn average monthly net cash in 2025
3 days ago

Goldman Sachs-owned Adler & Allan buys 180-strong civils outfit

West Country's Glanville Environmental gets new owner
3 days ago

Caddick lands first contract for £200m Skelmersdale revamp

Developer gets green light for masterplan
3 days ago

Van Elle sells HGV fleet to haulage firm

WS Specialist Logistics pays £2.9m to take on fleet and drivers
3 days ago

Buyers more bullish about prospects for year ahead

Residential "resilient" but commercial work a weak spot
4 days ago

Council backs first Brutalist car park-to-flats scheme

Newcastle-under-Lyme multi-storey car park to be reborn as pioneering homes scheme
4 days ago

Hinkley Point C hits peak build with 26,000 jobs

3,000 more workers to join as fit-out work ramps up
4 days ago

Over 40 firms win Wessex Water M&E minor works deal

Broad sweep of specialists picked for AMP8 programme
4 days ago

Spencer lands Scottish bridge hat-trick

Steelwork, gantries and bearing upgrades on Kessock, Forth and Tay crossings
5 days ago

Winners revealed for £1.5bn decarbonisation deal

Fusion21 confirms places for 40 firms: Full list
4 days ago

Cladding firm fined £225,000 after fatal fall

Court hears how cherry picker didn't reach all parts of repair job
4 days ago

Completed buildings caught-up in Gateway 2 chaos

Developer distraught after dealing with Building Safety Regulator
5 days ago

Aviva submits plans for 34-storey City office tower

Subject to planning work to start in autumn 2027
5 days ago

Murphy takes 40% stake in Aussie civils contractor

Firm enters Australasian market with stake in Sydney-based contractor Abergeldie
6 days ago

Moat seeks firm for £420m repairs and maintenance deal

15-year deal to upkeep 20,000 south east homes
5 days ago

Lynch takes over hotel for Sizewell plant operators

Hire giant now in the hotel business to guarantee accommodation for workers
5 days ago

Subcontractors wanted across Scotland

Latest Constructionline event in Glasgow: Register now
5 days ago

Six guilty of £2m bribery over Devon housing site deals

Corrupt building bosses and E.ON project chief and QS sentenced
1 week ago

Contractor services