Call grows for bolder 18m second staircase rule for flats

Aaron Morby 2 years ago
Share

A coalition of industry professional bodies including the Chartered Institute of Building have joined fire chiefs in calling on the Government to introduce the second staircase rule to 18m tall buildings and above rather than the 30m being proposed.

The Government went out to industry consultation late last year on its plan to force developers to design in second staircases in all new housing blocks rising to around 10 storeys (30m) and above.

In advance of the new rule being introduced, the Mayor of London has adopted the 30m rule, forcing many schemes back to the drawing board for a complete redesign.

The Department for Levelling Up, Housing and Communities said the extra fire safety measure at 30m could cost developers around £1.6bn over a decade.

Yesterday, the Royal Institute of British Architects wrote to Michael Gove, Secretary for the Department for Levelling up, Housing and Communities.

The letter, signed by eight organisations representing the built environment sector, fire safety and disability rights, urges him to reduce the proposed 30m height threshold for an additional staircase in new residential buildings.   

It said: “We are calling on government to reduce the height threshold for more than one staircase to 18 metres – implementing what we believe to be best practice, improving safety for occupants, and harmonising standards with the wider regulatory environment. This would also align with rules in Scotland, where an additional staircase from 18 metres has been required for four years.

The letter was signed by: 

  • Royal Institute of British Architects (RIBA)
  • Royal Institution of Chartered Surveyors (RICS)
  • Chartered Institute of Building (CIOB)
  • National Fire Chiefs Council (NFCC)
  • Housing Learning and Improvement Network (Housing LIN)
  • Disability Rights UK
  • Inclusion London
  • Claddag (Leaseholder Disability Action Group)

RIBA President Simon Allford said:  “Five years have passed since the fire at Grenfell Tower, and still we must make the case and take bolder action to help prevent further avoidable tragedies.

“Decisive action to make buildings as safe as is reasonably possible is long overdue. We urge the Government to improve fire safety standards – and clarity on appropriate staircase design and provision is essential. 

“We know that greater numbers of people are evacuating rather than ‘staying put’ during fire incidents post-Grenfell and we must ensure occupants have access to a safe, smoke-free evacuation route. 

“The Government’s current proposal fails to address our shared concerns. We stand ready to support government action on addressing all our concerns.” 

Latest news

Bombshell cavity barrier defects wipe out Taylor Wimpey profits

Fresh £222m provision for fire safety failings behind brick facades
9 hours ago

39 firms win £3bn South East schools framework

LCP panel covers new build, retrofit and fire safety upgrade work
19 hours ago

Esh boss bullish as profits and prospects rise

North of England contractor looking forward to continued growth
1 day ago

Government sets up Platform4 to build 40,000 homes on rail land

Former Lendlease Development chief Bek Seeley to head Platform4
9 hours ago

Race starts for £858m London highways consultancy deal

Ealing Council is leading the launch of a major new highways and transport consultancy framework
10 hours ago

Bridge parts set sail for £20m Murphy Stockport site

"Dress rehearsal" bridge assembly ahead of three week rail closure
9 hours ago

22 firms win Prosper £500m new build homes framework

Deal designed with input from Believe Housing, Gentoo and Karbon Homes
19 hours ago

Civils contractor Galldris sold to staff

£125m turnover firm transitions to Employee Ownership Trust
1 day ago

Fit-out firepower drives Morgan Sindall to record half-year

£390m cash pile supports push on partnerships and frameworks
1 day ago

Grid delays now rival planning as chief threat to project delivery

Turner & Townsend flags urgent need to prioritise electricity connections on projects
1 day ago

Forterra to shut down two divisions

Materials giant exiting Formpave block paving and Bison Bespoke precast businesses
1 day ago

Vistry and Kier team up again for Wokingham homes plan

Third major partnership kicks off first phase of 1,400-home Berkshire plan
2 days ago

Wates preps £200m Middlesbrough regen site

Work begins on landmark Crown Square project with hotel, student flats and homes
2 days ago

BAM Nuttall rail boss to join Balfour

Richard Watts to become Managing Director of UK Rail business
5 days ago

Peel Ports unveils £60m expansion plan for Yarmouth

New Southern Terminal to target big infrastructure and offshore energy schemes
2 days ago

£1bn beach defence mega-framework up for grabs

Environment Agency seeks two marine contractors to protect England’s coastlines
2 days ago

Bovis set for £220m tower job near British Museum

John F Hunt to start demolition work for big West End scheme
2 days ago

Carnell poaches another National Highways director

Maintenance contractor becomes latest private firm to lure public sector chief
2 days ago

Plans go in for Warrington logistics site revamp

Outdated units to be replaced at Hawleys Lane
2 days ago

Morgan Sindall site closed after fatal accident

Tragedy at £90m Mill Yard job in Cambridge
5 days ago

DfE signs off £148m school rebuild trio

B+K and Bouygues land major academy projects across England
5 days ago

Contract race starts for £205m A9 dualling job

Latest deal involves building or upgrading nine bridges
5 days ago

Higgins to turn former care home site into council houses

Construction to start early next year on Buckinghamshire scheme
5 days ago

Green light for £1.7bn Edgware town centre revamp

Ballymore to deliver 3,365 new homes
6 days ago

Work to start on £40m Blackpool Multiversity build

Morgan Sindall to start demolition for five-storey education campus
5 days ago

Bridge faults plunge Severfield into £18m loss

Firm cuts staff by 6% and raises option to sell part of stake in Indian arm
6 days ago

BAM UK Construction back in the black after Co-op woes

Nuttall civils arm powers up profits with margin topping 5%
6 days ago

Mace sells consulting business to Goldman Sachs

Sale gives construction bosses "opportunity to refresh and simplify" operation
1 week ago

Vinci gets green light for £35m St Helens transport hub

New interchange set to anchor wider town centre revamp
6 days ago

National Highways major projects chief to join Skanska

Dean Sporn to become Operations Director at infrastructure business
7 days ago