McLaren gets start date for £94m Angel Square contract

Grant Prior 2 years ago
Share

Developer Tishman Speyer has awarded the £94m shell and core contract for the refurbishment of Angel Square in Islington, north London to McLaren Construction with work set to start in June.

Work will transform 132,000 sq ft of office space in three linked buildings to create one 293,000 sq ft building containing 188,000 sq ft of office space,affordable workspace, a replacement public house and a public café.

The refurbishment will retain around 70% of the existing structure, infilling a central courtyard and adding two new floors with roof terraces after demolition of the upper level. The cores will be moved to a central position, freeing space and opening up floor plans.

 The building’s embodied carbon is significantly reduced through use of the existing ribbed reinforced-concrete frame.

McLaren’s shell and core contract includes Cat A fit out of the two new floors and installation of new MEP, largely relocated from the roof to the basement. Plant will be electric throughout and supplemented by renewable energy from rooftop photovoltaics.

A new glass reinforced concrete façade replaces the 1980s brick façade and is inset with glazed terracotta.

McLaren will start on site in June with work due to complete in Q4 2024.

McLaren’s regional managing director for London, Darren Gill, said: “These heavy refurbishments of existing structures are increasingly vital as a sustainable way of meeting occupier demands for modern office space with high environmental performance.

“They can be delivered relatively quickly and Angel Square shows that the new building needn’t be limited by the previous layout. An intelligent design like this one can create a lot of extra space.”

Nacho O’Leary, Senior Director overseeing Tishman Speyer’s Design & Construction activities across UK and Ireland, added: “McLaren has the experience of heavy refurbishment and of building above underground stations, which perfectly complements the rest of the project team.

“Together we will deliver a sustainable refurbishment which is a top priority for the firm.

“With Angel Square, Tishman Speyer is further extending its premium-quality office portfolio, while continuing to create an exemplar of ESG-focused and community-based design that will revitalize a prominent gateway site to Angel.”

Latest news

Ex-Lendlease boss seals £24bn Crown Estate mega sites JV

JV targets mega sites build out at Euston, Thamesmead and Smithfield
53 minutes ago

McLaren to build 2,400-bed worker campus at Sizewell C

Worker camp to raise the bar on site accommodation standards
38 minutes ago

Soaring costs and work drought sunk historic scaffolding firm

Rodells had been in business since 1898
41 minutes ago

Clarion set to tender £79m Kirkstall Road Phase 2

Bidding to start for Dyecoats blocks 1 and 3 after Graham bagged phase 1
1 hour ago

TfL seeks firms for £700m civils and station framework

Works include £80m South Kensington and £60m Elephant & Castle station upgrades
2 hours ago

Early market talks on £2.5bn Yorkshire mass transit plan

Supplier talks open for West Yorkshire’s biggest ever transport scheme
45 minutes ago

Robertson starts Redcar town centre revamp

Culture and Leisure Anchor Attraction will enhance Redcar’s Esplanade
1 hour ago

Alun Griffiths set to rescue firm he sold for £36m

Tarmac to hand back Welsh civils contractor after five years of losses
3 days ago

Landsec to pump £2bn into new house building drive

Developer to build 6,000 homes as it sells offices to fund new schemes
3 days ago

Severfield to start steel on McAlpine car battery site

Specialist to start on £4bn site next month after steel package signed-off
3 days ago

Construction Manager of the Year crowned

Jason Hunt of Willmott Dixon wins for work on Bristol concert hall
3 days ago

Tide gets go-ahead for over 1,000-home London scheme

Volumetric expert gains planning for co-living homes scheme in Southwark
4 days ago

Vital Energi lands £250m Gatwick decarbonisation deal

Five-year programme to switch airport away from gas heating
3 days ago

Construction output flickers into life in March

First quarter activity flatlines after slow start to year
4 days ago

Skanska lifts margin to 4.3% as profit hits £78m

Infrastructure and FM drive near-tripling of profits
4 days ago

Mayor backs 46-storey student tower at Canary Wharf

City Hall overturns Tower Hamlets council rejection of 912-bed scheme
4 days ago

Plans go in for 100 acre Port of Tilbury expansion

Construction could start next year on site the size of 70 football pitches
4 days ago

Inland Homes creditors face £38m hit

Administrator confirms no cash for supply chain
5 days ago

Durkan dogged by legacy jobs despite return to trading profit

Durkan scales down new homes contracting to focus on retrofit work
5 days ago

Munnelly founder hands over CEO role to son

Paul David Munnelly steps up to CEO as father becomes chairman
4 days ago

Barking build to rent towers face rebuild

Major remedial work needed on resi scheme built by Shapoorji Pallonji UK Ltd
5 days ago

London new home starts plunge 38% as Building Safety Act bites

Capital only region to see Q1 fall in NHBC new home registrations
6 days ago

Sureserve swoops for rival compliance outfit Kinovo in £56m deal

Recommended cash offer will take AIM listed contractor private
5 days ago

Crown Golf tees up £1bn plan to build 3,000 homes on course land

Major housing plan for spare land on eight UK courses
5 days ago

Green light for Peterborough Station Quarter £48m revamp

First phase to start before the end of the year
5 days ago

Morgan Sindall starts £38m Caerphilly leisure hub

New swimming pool and health suite forms part of town regeneration plan
5 days ago

145 firms win places on £800m building safety framework

Fusion21 confirms latest winners: Full list
6 days ago

Higgins Homes and site workers face manslaughter charges

Contractor and four site staff charged after woman killed by falling pallet of bricks
7 days ago

Operator spots cracked mast on Hinkley tower crane

Hinkley Point C contractor hit with safety notice over failed mast pin and cracks
6 days ago

Countdown starts for £1bn Birmingham highways bid race

Council will break-up mega framework into five lots
6 days ago

Contractor services