Galliford Try leads March contracts league with roads wins

Aaron Morby 5 months ago
Share

Two major road jobs accelerated Galliford Try up through the ranks to take pole position in the March contracts league.

Its Carlisle Southern Link Road job, which was rebid after original contractor Morgan Sindall failed to agree a final price, was secured for £140m, while Leicestershire’s Melton Mowbray distributor road was signed off at £115m.

The two jobs contributed heavily to the firm’s total haul of orders for the month at nearly £395m.

Top 10 contractors by work confirmed in March


Click here for further rankings

Wates placed second in the March rankings with nine projects totalling £306m, spearheaded by a £120m refurbishment of MPs offices in Parliamant’s Norman Shaw Building south.

In the rolling 12-month league rankings, the pecking order remained the same as last month with Kier well ahead of Balfour Beatty closely followed by Bouygues.

Top 5 contractors by work won in year to March


According to data compiled by Barbour ABI, the top 50 firms secured 191 jobs, estimated to be worth nearly £3.98bn, in March.

Among the other big project wins Mace signed off a £120m deal with client Fabrix to deliver a pioneering new office block in Southwark containing a “sky forest”. The 430,000 sq ft Roots in the Sky scheme will transform Blackfriars Crown Court into a sustainable office complex containing the UK’s first rooftop urban forest.

Havant Thicket reservoir plan – the first large-scale new water storage reservoir in the UK since the 1980s.

A joint venture between Van Oord-owned Mackley Civil Engineering and Jones Bros Civils bagged a £167m order from Portsmouth Water to construct the Havant Thicket Reservoir in Hampshire.

Shotley Bridge Community Hospital

Tilbury Douglas was confirmed as the builder for the Shotley Bridge Community hospital in Consett after plans approved by Durham County Council. Construction could start on the project, estimated at £150m, in the Autumn.

In a busy month for McAleer & Rushe, the bid department took a trio of big residential projects. The largest for 274 flats in East London at Stroudley Walk, Bow is estimated to be worth £95m.

Stroudley Walk scheme in Bow for Muse and housing association HARCA

In Scotland, the firm will deliver 338 flats in Lothian at the Skyliner Ocean Drive scheme for around £80m and in Birmingham, the firm will deliver a 29-storey student apartment tower worth £65m at Gough Street, Queensway.

Goodstone Living appointed McAleer & Rushe to deliver the Leith build to rent scheme

Latest news

Bouygues/Murphy JV tipped for £2.3bn Thames tunnel job

Frontrunner emerges for Lower Thames Crossing 4.2km tunnel job
1 day ago

Subbies facing squeeze as main contractors tighten belts

Pay disputes increasing as suppliers fear major contractors returning to "bad old ways"
1 day ago

Portview takes control of Fulham Buckingham stand

Fit-out specialist steps in after main contractor failure
1 day ago

Firefighters probe cause of Leeds modular scheme blaze

Fire broke out in timber frame office job at Citu's eco development
1 day ago

Manslaughter probe dropped after demolition deaths

HSE to now lead investigation of 2019 tragedy
1 day ago

Vinci/McAlpine JV to start £105m NHS rehabilitation centre

Treasury clears New Hospital Programme job to start main construction
1 day ago

First sign of price falls for construction products

Supply returns to pre-covid levels as demand drops
2 days ago

Three giant lab buildings approved at £700m Oxford R&D district

Phase 2 Oxford North office and lab buildings to deliver 460,000 sq ft of space
3 days ago

PM fails to quash speculation about plan to axe HS2 phase 2

Sunak ducks future of HS2 question at big net zero Government briefing
2 days ago

Green light for giant North Wales offshore wind farm

Awel y Môr wind farm is the biggest renewable investment in Wales for a decade
2 days ago

T&T breaks £1bn revenue mark for first time

Global consultant enjoys strong growth across all seven geographical regions
2 days ago

Subcontractors and suppliers wanted across Scotland

Constructionline Meet the Buyer event next week at Hampden Park: Register now
2 days ago

Springfield switches strategy as private housing slumps

Scottish house builder turns back to affordable homes market
3 days ago

Sunak details zero carbon targets climbdown

Ban on gas boilers delayed five years; 50% rise in scrappage scheme
3 days ago

RG Group to build tallest student block in the world

Contractor confirmed on 45-storey tower in Leeds
3 days ago

Galliford Try forecasts profit to double next year

Contractor delivers strong results this year and raises expectation for 2024
3 days ago

Strabag hires 15 senior Buckingham Group staff

Austrian civils giant to set up UK building business with pool of staff
4 days ago

Contractors raise pay offer to avert engineering construction strike

Blue book agreement employers up final offer to 10%
3 days ago

Former Mid Group chief joins Tilbury Douglas

Steven Hearn gets new role as regional director of the South East division
3 days ago

Crumbly concrete found at extra 27 schools

A total of 174 schools now found to contain RAAC concrete
4 days ago

Henry Boot Construction struggling to find work

Contracting arm looking to fill order book
4 days ago

More schools found to have crumbly concrete

Surveyors find another 27 schools containing Raac
4 days ago

Buckingham Plant Hire still trading as normal

Separate plant business "not affected" by collapse of contractor
4 days ago

NG Bailey makes £25m loss after Britishvolt shock

Gigafactory loss and problem contracts blow hole in books
5 days ago

Steelwork specialist Billington delivers record first-half

Overseas recruitment push boosts headcount by 10% to drive growth
4 days ago

Vinci wins major St Helens town centre revamp

£90m first phase includes new market hall, 120-bed hotel and over 60 flats
4 days ago

Mace deputy chairman to step down from board

Mace veteran Mark Holmes will leave at the end of the year
4 days ago

CHIC extends bid deadline on £3.2bn new build framework

Closing date for 8-year framework set for 20 October
5 days ago

Work to start this year on Manchester £250m spa resort

Developer Therme gets green light for re-engineered 28-acre Trafford complex
5 days ago

Costain bags £80m water order for upgrades at 16 sites

Severn Trent contracts include work to improve wastewater quality and protect wildlife
5 days ago

Contractor services