Go-ahead for clutch of major jobs to reboot Manchester

Aaron Morby 3 years ago
Share

Manchester City planners have nodded through a series of planned schemes that promise to revive construction activity in Manchester.

Massive Bridge Street scheme is designed by Studio Egret West
Massive Bridge Street scheme is designed by Studio Egret West

Among the flight of projects given the green light are two major high-rise projects with a combined construction value of up to £575m.

The largest being advanced by developer Oval Real Estate is a landmark mixed-use scheme to redevelop the Albert Bridge House site on Bridge Street with two striking buildings.

Planned office block with multiple landscaped terraces

The site will be built out with a unusually stepped 19-storey office building of 550,000 sq ft offering multiple green terraces and a 45-storey building consisting of nearly 370 flats.

This alone is expected to cost £325m, sustaining 2,000 construction jobs during the programme.

An existing 18 floor office building currently occupied by HMRC will be demolished to clear the site, which also includes Bridge Street car park.


Plan for two new buildings on Medlock Street forming the Southern Gateway to the city

At the same planning meeting, joint venture developers Whitbread and Dominvs Group got the go-ahead for its £250m office and student rooms scheme at One Medlock Street.

Forming part of the City’s Southern Gateway, proposals will require demolition of an existing five-storey Premier Inn hotel and the introduction of 390,000 sq ft of flexible office space.

Planned 13-storey grade A office block

Adjoining the office building will be a 37-storey tower of over 1,000 student rooms. Jon Matthews Architects designed the two tall buildings, while Planit-IE crafted the landscape and public realm strategy.

Building services consultant Ridge and structural engineer Ramboll are also on the client team with cost consultant Cumming.

The proposals for One Medlock Street mark the third time that Dominvs has joined forces with Whitbread.


A consortium of Dean Street Developments, Definition Capital, and Assured CMS also got the all-clear to build a 154-bed hotel off Great Ancoats Street (above).

The 20-storey Manchester hotel would operated under Hilton’s Motto brand, the first of its new urban lifestyle brand hotel in England.


Architect Tim Groom designed the brick clad student block to reflect the adjacent Mcintosh Mill building

Developer Vita group also gained planning for a 14-storey purose built student accommodation project that will provide 580 student beds in the First Street area of the city.

Vita’s brick-clad student block will be built next to Ask’s 13-storey office building, which has also recently been submitted for planning on plot 10.


Carmoor Road student rooms will be built for the University of Manchester

Another smaller student scheme planned by Tiger Developments consisting of around 176 student beds was also waved through at Carmoor Road near the Royal Infirmary.


In Manchester’s Northern Quarter a joint venture between Marco Living and Axis Real Estate got the go-ahead for 267 flats to built on land currently used as a car park bordering Tariff Street and Port Street.

Designed by Leach Rhodes Walker Architects, the projects will involve two brick buildings rising to 10 and 11 storeys.

The developers are understood to be gearing up for an autumn construction start.

Latest news

Ex-Skanska VP joins M Group as energy infrastructure chief

Former COO Andrew English brought in to drive sector growth
6 hours ago

Vistry warns first-half profits to be hit by discount drive

New Vistry chief starts operational review as cash drive shifts private homes stock
12 hours ago

Strabag UK gears up for civils work surge next year

Trio of major tunnelling jobs to drive revenue to £1bn target
13 hours ago

Glencar revealed as builder of £50m Minecraft World

Contractor confirmed on latest attraction at Chessington World of Adventures
13 hours ago

TfL names trio for £700m station upgrade framework

Amey Rail, Costain and Dragados secure places on London stations deal
13 hours ago

Quinn London sold to staff

£109m turnover contractor latest to transition to an Employee Ownership Trust
1 day ago

More fines and bans for former Carillion chiefs

Finance chiefs and trio of accountants hit with penalties
1 day ago

Fusion21 starts race for £350m housing repairs framework

Firms face fight to retain spots on third-generation repairs and voids deal
1 day ago

London builder Curo Construction ceases trading

Directors write to up to 100 staff telling them not to return to sites
1 day ago

Vistry gets £600m Olympic Park homes go-ahead

First 355-home phase approved at Pudding Mill Lane in Stratford approved
1 day ago

Fox snaps up highways contractor and readymix firm

DSD Construction and Moore Readymix acquisitions dig group deeper into civils
2 days ago

Kier and Multiplex line up for Derwent London office starts

Developer presses button on two West End schemes as leasing demand and rents strengthen
2 days ago

McLaren lands £99m London Bond Street over-station job

Retrofit-led West One Shopping Centre will retain 60% of existing concrete frame
2 days ago

£26bn Pagabo developer framework goes live for bidders

Four-year framework targets councils, NHS trusts and housing providers
2 days ago

Starmer confirms plan to nationalise British Steel

Plan could clear way for greener electric arc furnace produce steel in five years
2 days ago

Cardo gains place on L&Q’s £3bn home upgrade programme

Housing body expands delivery line-up for 15-year investment plan
2 days ago

Ardmore loses High Court appeal bid to halt £14.9m Crest payout

Judge refuses appeal route and gives no extra time to pay
2 days ago

Taylor Woodrow scoops £856m HS2 control centre mega job

HS2 Washwood Heath nerve centre to cost more than treble original budget
3 days ago

Keltbray scales down as revenue drops

£1m spent on redundancies as London commercial market slows
3 days ago

East London council £500m housing major works drive

Fire safety, M&E and refurbishment works lined up across borough housing stock
3 days ago

Panattoni plans 23-acre scheme in Wakefield

Construction to start this quarter on logistics development
2 days ago

Kori lands latest deal for Care UK

Demolition work to start this week on £12m contract
3 days ago

HS2 chief pushes major project reset back to end of 2026

Wild says project overhaul must be “robust” as slower trains option explored
6 days ago

Winvic tops April contracts league after shed hub win

Orders secured by top 50 firms fall by nearly 20% compared to prior month
6 days ago

Briggs & Forrester banks £511m record pipeline after stronger year

Leaner Briggs & Forrester boosts profit and cash generation
6 days ago

Henry Boot chief prepares exit after strategic overhaul

Tim Roberts to leave later this year as successor named from inside business
6 days ago

1m sq ft Northumberland industrial park approved

Logistics park revival gains momentum with giant Northumbrland scheme
6 days ago

Construction buyers report rampant cost inflation

Input costs rise at fastest rate for nearly four years
6 days ago

Caddick taps B&K veteran to spearhead East Midlands drive

Paul Sykes joins as Caddick eyes £1bn Midlands pipeline
7 days ago

Balfour Beatty powers ahead on energy and defence boom

Contractor says 15 major transmission schemes to start construction within next 18 months
7 days ago