New One Undershaft tower plan as tall as the Shard

Aaron Morby 8 months ago
Share

More ambitious plans to build a tower matching the height of the Shard in the City of London have gone out to consultation.

Plan for One Undershaft tower elevated to rival Shard as Western Europe's tallest building
Plan for One Undershaft tower elevated to rival Shard as Western Europe's tallest building

Singapore developer Perennial Group and development manager Stanhope are planning to submit revised plans for the One Undershaft site in the City of London.

The site already has planning approval for a distinctive 73-storey flat-top office block, nicknamed the Trellis because of its expressed cross bracing.

This was planned to top out at 305m, just short of the height of the Shard.

The revised plan is now for a segmented tower, offering more varied floorplates, which would match the Shard at around 310m tall.

(Left) Planned ‘Trellis tower’ granted planning in 2016. (Right) Revised design will include Europe highest public viewing area at the top of the building and lower green outdoor spaces.

Eric Parry Architects has designed the project, which is expected to be submitted for planning after public consultation. WSP is acting as multi-service engineer.

The developers said the revised proposals would enable a more sustainable building with enhanced green spaces – not included in the already consented scheme.

It is understood the building will rise to 74 storeys and offer just over 1.4m sq ft of predominantly office space with Europe’s highest open public viewing space on the top floor.

Lower floors designed to improve public space

The proposals seek to increase the provision of enhanced public spaces. These will be formed through collaboration with the Museum of London, including a publicly accessible 10-floor roof garden.

Three main office tower sections are located above an elevated public podium garden that benefits from increased sun- and daylight.

The revised plan updates the building’s energy strategy so the new building will be all-electric, reducing carbon emissions and improving energy efficiency.

Its design will utilise long-life, low-carbon materials, which require little maintenance alongside a more innovative façade that optimises the building’s energy performance.

 

Latest news

Wates wins former Daily Mail printworks transformation

British Land advances major cultural venue at London’s Canada Water
12 hours ago

Mace poaches Ramboll chief to be Head of Engineering

Martin Feakes will develop civil and structural engineering offer at Mace
12 hours ago

Subcontractors form alliance for major civils jobs

Trio of specialists join forces to collaborate and offer Tier 1 contractors a turnkey solution
16 hours ago

Fear of supply chain failures boosting collaboration

Procurement survey also reveals project bank account use is rising
15 hours ago

Wates sets up business to target 160,000 mouldy social homes

Healthy Homes service will be offered to social landlords across England
16 hours ago

Higgins wins £75m Peabody Passive House job

Latest phase of Deptford Landings to start construction
16 hours ago

Contractors and unions agree Sizewell C working deal

New deal offers improved sick pay and parental leave over Hinkley Point deal
1 day ago

Competition chiefs win legal fight for more construction raids

High Court rules CMA officials can raid a domestic property as part of investigation
1 day ago

More Osborne companies file administration notices

Three more divisions lodge notices with court
2 days ago

McLaren wins multi-storey urban logistics contract

South London win with British Land is pioneering urban logistics hub
2 days ago

Big social housing schemes at risk over funding uncertainty

Housing associations warn uncertainty over public funding beyond 2026 is curbing new schemes
2 days ago

Kier wins Worcestershire town centre renewal

Firm secures Bromsgrove commercial and cultural hub project
2 days ago

BAM signs Kent school contract at £42m

Sevenoaks school rebuild signed off at £8m more than first estimates
2 days ago

RG Group signs £121m Newcastle rental homes job

Developer Olympian Homes advances 519 flats plan at Pottery Lane site
5 days ago

Geoffrey Osborne files administration notice

Contractor in talks to save parts of the business
5 days ago

Winners named for £260m Manchester Uni framework

B&K, Henry Bros, Graham, Robertson and Vinci among new line-up
5 days ago

Shed specialist Benniman rides out market lull

Worcestershire warehouse builder says industrial and logistics work is picking up again
5 days ago

Another contractor cleared after high profile immigration raid

Adana Construction employees were working legally on site swooped on by Home Office
5 days ago

McAleer & Rushe wants to meet new London suppliers

Contractor holding Meet the Buyer event in London: Register now
5 days ago

McAlpine signs £500m Broadgate dual towers deal

Work to start on iconic 36-storey and 21-storey towers
6 days ago

Worker rescued from collapsed four metre deep trench

Fire crews take six hours to save trapped builder near Blackwall Tunnel
6 days ago

Gove puts another major building scheme on hold

Secretary of State starts another planning fight after M&S defeat
6 days ago

Greenwich University tenders £300m framework

Up to five firms will carry out upgrade and newbuild work at three campuses
6 days ago

Work starts on Manchester 26-storey Obsidian tower

Contractor Domis starts Salboy's 10th Manchester scheme in seven years
6 days ago

Race for £1.3bn West Midlands social homes framework

The Community Housing Group reboots tender race for new build housing
6 days ago

Delancey submits £400m King’s Cross lab plans

200,000 sq ft lab/office project will be built above railway and tube tunnels just 4.5m below
6 days ago

Winners revealed for £150m fire safety framework

New deal will help organisations comply with the Building Safety Act
6 days ago

Sellar plans £500m City tower next to Walkie-Talkie

Consultation starts on London 60 Gracechurch Street tower
7 days ago

Severfield ends year on high with record order book

Orders top £500m with strong future pipeline of opportunities ahead
7 days ago

Second senior director exits National Highways

Commercial director Malcolm Dare set to move on to new role
7 days ago

Contractor services