Van Elle profit slides in first six months

Aaron Morby 1 year ago
Share

Piling specialist Van Elle maintained operating margins at 3.9% despite a slide in revenue and profit in the first half.

Mark Cutler sees early signs of recovery after challenging first six months
Mark Cutler sees early signs of recovery after challenging first six months

The firm said the 16% fall in turnover to £68m in the six months to the end of October, whcih saw pretax profit drop to £2.5m from £3.5m in the prior period, represented a resilient performance in face of a more challenging market.

Mark Cutler, chief executive, said he was now hopeful of a recovery in key markets in the 12 months ahead, particularly in energy and water sectors, both of which would deliver significant opportunities in the medium term.

While work volumes in rail will dip in the transition to Control Period 7, he said this would be offset by Van Elle’s framework position on the TransPennine Route Upgrade.

Looking forward, Van Elle expects opportunities arising from CP7 to be significantly stronger than CP6 as a result of increasingly close customer partnerships.

In highways, Van Elle’s work on the retrofit safety measures as a framework partner on the Smart Motorway Programme Alliance are scheduled to commence in the next six months.

Cutler said: “Despite the anticipated lower revenues, operating margin has been maintained at 2023 levels, our balance sheet is stronger, and our future prospects are more compelling.

“We are very pleased with the acquisition of Rock & Alluvium shortly after the period end.

“The group is developing a strong market position in the energy and water sectors and is well placed to benefit from a recovery in activity levels in housing, construction, rail and highways in FY2025.”

The order book at 31 December 2023 stood at £42m including £11.6m for Rock & Alluvium.

Latest news

Tide gets go-ahead for over 1,000-home London scheme

Volumetric expert gains planning for co-living homes scheme in Southwark
13 hours ago

Construction output flickers into life in March

First quarter activity flatlines after slow start to year
16 hours ago

Skanska lifts margin to 4.3% as profit hits £78m

Infrastructure and FM drive near-tripling of profits
1 day ago

Mayor backs 46-storey student tower at Canary Wharf

City Hall overturns Tower Hamlets council rejection of 912-bed scheme
24 hours ago

Plans go in for 100 acre Port of Tilbury expansion

Construction could start next year on site the size of 70 football pitches
15 hours ago

Inland Homes creditors face £38m hit

Administrator confirms no cash for supply chain
1 day ago

Durkan dogged by legacy jobs despite return to trading profit

Durkan scales down new homes contracting to focus on retrofit work
1 day ago

Munnelly founder hands over CEO role to son

Paul David Munnelly steps up to CEO as father becomes chairman
16 hours ago

Barking build to rent towers face rebuild

Major remedial work needed on resi scheme built by Shapoorji Pallonji UK Ltd
2 days ago

London new home starts plunge 38% as Building Safety Act bites

Capital only region to see Q1 fall in NHBC new home registrations
2 days ago

Sureserve swoops for rival compliance outfit Kinovo in £56m deal

Recommended cash offer will take AIM listed contractor private
2 days ago

Crown Golf tees up £1bn plan to build 3,000 homes on course land

Major housing plan for spare land on eight UK courses
2 days ago

Green light for Peterborough Station Quarter £48m revamp

First phase to start before the end of the year
2 days ago

Morgan Sindall starts £38m Caerphilly leisure hub

New swimming pool and health suite forms part of town regeneration plan
2 days ago

145 firms win places on £800m building safety framework

Fusion21 confirms latest winners: Full list
2 days ago

Higgins Homes and site workers face manslaughter charges

Contractor and four site staff charged after woman killed by falling pallet of bricks
3 days ago

Operator spots cracked mast on Hinkley tower crane

Hinkley Point C contractor hit with safety notice over failed mast pin and cracks
3 days ago

Countdown starts for £1bn Birmingham highways bid race

Council will break-up mega framework into five lots
3 days ago

Acciona wins £400m Thames waterworks upgrade

Lea Valley Coppermills water treatment works to get full overhaul
3 days ago

Pension giants pledge £25bn for infrastructure push

Seventeen pension providers pledge to invest in projects
3 days ago

Safety row over London tower ducking fire regs by 30cm

Fire union calls on Mayor to block Bromley flats plan over single staircase
3 days ago

Midgard lands £145m deal to build Edition Birmingham

Construction to start shortly on twin residential towers
3 days ago

McAleer & Rushe set to break £500m turnover barrier

Pre-tax profit jumped 16% to £46m last year
4 days ago

Top design team picked for £2.5bn York Central scheme

Massive city centre regen scheme moves to detailed design
4 days ago

MoD to bid £100m command HQ enabling works

Hertfordshire joint forces command centre expansion advances
4 days ago

Failed shed specialist Marbank owed suppliers £10m

Contractor was facing a string of adjudication claims
4 days ago

New scaffolding training trade body launches

Scaffolding Training Alliance formed amid disquiet caused by planned training changes
3 days ago

£1.8bn framework planned for green retrofit drive

Procure Plus to invite bids later this month
4 days ago

Breakthrough for HS2 as first Birmingham tunnel section dug

Balfour Beatty VINCI completes 3.5-mile TBM drive in 652 days
6 days ago

HS2 Curzon Street station redesign approved as timber roof axed

Change to meet stricter fire safety rules and cut maintenance costs
7 days ago

Contractor services