Notting Hill office refurb finally approved

Grant Prior 1 year ago
Share

Squire & Partners has received unanimous support from the Royal Borough of Kensington and Chelsea to transform Newcombe House in Notting Hill Gate for Beltane Asset Management.

The project has faced a 10-year planning wrangle after local opposition but will now see a new office-led development comprising three distinct buildings.

Designs retain, refurbish and extend the existing 1950s 12-storey structure, and introduce two new buildings on Kensington Church Street.

The redevelopment of the tower will upgrade the existing workspace through the extension of the floor plate, addition of two new floors and the introduction of balconies and a roof terrace.

A six-storey building on Kensington Church Street will offer large retail space on the ground floor and additional workspace on the upper floors, with landscaped terraces on each level of the western elevation.

The final eight-storey building will provide affordable housing and a medical centre, designed in collaboration with the NHS. A new landscaped square fronting Notting Hill Gate will establish an inviting and inclusive space.

Henry Squire, Partner at Squire & Partners said: “We are delighted to bring forward a vision that creates a new, extremely high-quality, distinctive campus of buildings and public realm that will complete the regeneration of Notting Hill Gate and be a very positive addition for years to come.”

Duncan Roe, Partner at Beltane Asset Management added: “Notting Hill Gate has amazing potential to create best-in-class office and retail accommodation right in the heart of a vibrant and well-connected district centre. Our ambition is to further strengthen and enhance Notting Hill Gate with a new commercial hub which will bring a range of local economic and social benefits.”

 

Latest news

Hill hits record £90m profit as homes pipeline swells

Build-to-rent push and £4.8bn contracting book to fuel next growth phase
14 hours ago

Rayner unveils £39bn plan to build 300,000 social homes

Council building revival and rent reform feature in social and affordable homes plan
22 hours ago

Keltbray bounces back with £3.2m profit

Tighter controls and smarter project selection fuel strong turnaround
22 hours ago

VINCI JV wins 500-home twin town centre revamps

Chester Northgate phase 2 and Northwich Weaver Square schemes move to delivery stage
22 hours ago

80 energy projects unlocked as Ofgem backs grid expansion

£24bn energy networks deal gets green light from regulator
2 days ago

How to see your stories on the Enquirer

Join our Suppliers and Buyers directory to get your news published
22 hours ago

Henley lands Midland Mill revamp on Leeds tower scheme

Restoration of 18th-century mill kicks off on South Bank regeneration project
21 hours ago

New boss at Eric Wright Civil Engineering

Gavin Hulme takes top job as Diane Bourne moves to group role
1 day ago

Pinewood submits £1bn data centre plan

Studio giant adds green and learning spaces to tech hub blueprint
2 days ago

Record results after TClarke goes private

Britain's biggest M&E contractor flourishes after de-listing
2 days ago

Dalkia lands £200m nuclear maintenance deal

1,000 nuclear FM staff to join M&E contractor
2 days ago

Construction comeback to outpace wider economy

Arcadis forecast fueled by spending review optimism
3 days ago

First steel goes up on giant car battery site

Severfield gets to work on McAlpine Somerset site
3 days ago

Permasteelisa wins cladding deal on Bovis city tower

Facade specialist lands package at 60 Gracechurch Street
2 days ago

Fox buys recycled asphalt specialist Fisher

Acquisition adds major recycled asphalt capacity in north west
3 days ago

Major Building Safety Regulator shake-up to end tower delays

HSE stripped of control and top fire chiefs brought in to fast-track stalled schemes
3 days ago

Hinkley trio sign Sizewell civils deal

Balfour,Bouygues and Laing O'Rourke form Civil Works Alliance for new power station
3 days ago

£3.9bn data centre plan for Ravenscraig steelworks

Green energy to power massive new steel to silicon AI campus
3 days ago

Breakthrough on HS2’s second longest tunnel

8.4 mile Northolt to Old Oak Common drive completes
3 days ago

Neilcott on fast-track to debt-free employee ownership

£22.5m loan nearly paid down after big profit year
3 days ago

TfL kicks off race for £700m Tube station upgrade

South Kensington and Elephant & Castle top the pipeline list
3 days ago

Corbyn Plant Hire fleet goes under the hammer

Kit to be sold off by sister firm to collapsed groundworks contractor
3 days ago

Government wields procurement stick on late payment

New rules would block slow payers from bidding on big public jobs
6 days ago

Hercules buys power line labour firm for £15.7m

Labour supply specialist snaps up Advantage NRG to tap booming electricity upgrade market
6 days ago

Universal bid to fast-track planning for theme park

Entertainment giant eyes 2026 start at Bedford site
6 days ago

Developer Breck to transform former Ibstock brick factory

Ravenhead works to become 300-home development
6 days ago

SP Energy Networks awards contracts worth £1.4bn

First round of awards under £5.4bn national electricity grid upgrade programme
7 days ago

Travelodge to convert Liverpool Street office building

Office-to-hotel conversion in City of London
6 days ago

Plans lodged for 1m sq ft City of London office

Barbican landmark building will reuse 40% of existing structure
7 days ago

PTSG acquires roofing specialist HD Sharman Group

Premier Technical Services Group expands building maintenance division
6 days ago