£1.5bn Teesside carbon capture scheme consented

Aaron Morby 1 year ago
Share

The Government has granted approval to build the world’s first gas-fired power station with carbon capture, usage and storage capability on Teesside.

NZT Power scheme includes 860MW gas fired power station providing electricity for 1.3m homes
NZT Power scheme includes 860MW gas fired power station providing electricity for 1.3m homes

Net Zero Teesside (NZT) Power – under development by partners bp and Equinor at Teesworks – aims to become the UK’s first decarbonised industrial cluster as early as 2030.

The £1.5bn project could create and support up to 4,000 jobs during construction.

The final hurdle before construction can start on the first of a generation of carbon capture schemes is a final investment decision from NZT Power partners, expected this year.

In the meantime, extensive work to clear and prepare the former Redcar Blast Furnace site ahead of construction is continuing.

Cleared Redcar steelworks site where new carbon capture facility will be built

Carbon capture scheme comprises:


A CO2 gathering network of pipeline connections from industrial facilities on Teesside to transport the captured CO2

An 850MW combined cycle gas turbine electricity generating station, cooling water, gas and electricity grid connections and CO2 capture;

A CO2 gathering/booster station to receive the captured CO2 from the gathering network and CCGT generating station

An onshore section of a CO2 transport pipeline for the onward transport of the captured CO2 to a suitable offshore geological storage site in the North Sea.

Costain recently completed the front-end engineering design stage for key onshore elements.

This included the FEED design for NZT Power includes natural gas supply pipework and a high voltage 275kV power network.

For the Northern Endurance Partnership, formed to gather together major industrial users in the Teesside area, its design work focused on the onshore CO2 gathering network.

This involves a 12km, 22” pipeline connecting industrial facilities with an initial capacity to transport around 4m tonnes of CO2 per annum to be securely stored under the North Sea.

Teesworks chairman Chris Musgrave said: “We’ve been hard at work preparing the land, planning consent has been secured, and now nothing’s holding us back in getting this transformational scheme off the ground.

“Net Zero Teesside Power is a key part of the puzzle to our carbon capture and storage ambitions, feeding into the net zero ambitions of existing businesses and becoming a prime asset for others looking to relocate here. This shows the speed at which we’re moving for the good of local people and the region.”

The proposed power station will generate up to 860 megawatts of low carbon electricity – enough to power up to 1.3 million UK homes.

Up to two million tonnes of CO2 emissions from the power station will be captured each year – emissions which would otherwise be released into the atmosphere.

The captured CO2 will then be transported by the Northern Endurance Partnership by pipeline to a geological storage site under the North Sea, where it will be permanently and safely stored.

Latest news

Spencer lands Scottish bridge hat-trick

Steelwork, gantries and bearing upgrades on Kessock, Forth and Tay crossings
9 hours ago

Completed buildings caught-up in Gateway 2 chaos

Developer distraught after dealing with Building Safety Regulator
19 hours ago

Aviva submits plans for 34-storey City office tower

Subject to planning work to start in autumn 2027
18 hours ago

Murphy takes 40% stake in Aussie civils contractor

Firm enters Australasian market with stake in Sydney-based contractor Abergeldie
1 day ago

Moat seeks firm for £420m repairs and maintenance deal

15-year deal to upkeep 20,000 south east homes
18 hours ago

Lynch takes over hotel for Sizewell plant operators

Hire giant now in the hotel business to guarantee accommodation for workers
19 hours ago

Subcontractors wanted across Scotland

Latest Constructionline event in Glasgow: Register now
18 hours ago

Six guilty of £2m bribery over Devon housing site deals

Corrupt building bosses and E.ON project chief and QS sentenced
5 days ago

1,650 former ISG staff launch legal claims

Redundancy Payment Service facing payout of more than £9m
5 days ago

Plans lodged for £1bn cancer research centre in Sutton

London Cancer Hub will deliver around 1m sq ft of lab and research space
5 days ago

London Met Uni seeks firm for £284m estate revamp

Contractor wanted to deliver capital works and FM
5 days ago

Delayed £2bn estate rebuild back on as Berkeley signs deal

Birmingham council development agreement paves way for 2028 Ladywood start
6 days ago

Tilbury Douglas boosts margin to 2.1% as profits double

Firm targets 3.5% margin by 2029 under new business plan
6 days ago

Subbies battle for fastest bricklayer title

Winchmore management team go back on the tools
6 days ago

Green light for revised McLaren Reading revamp

Mixed-use plans to transform Broad Street Mall site
5 days ago

Three arrested in Blu-3 and Mace bribery probe

Serious fraud office swoops over alleged £3m bribes to former Mace associates
6 days ago

Scotland’s most complex A9 dualling job heads to market

Market testing starts for £205m Pitlochry to Killiecrankie 6.4km upgrade
6 days ago

Unite signs £390m student beds JV with Manchester Met

Construction at Cambridge Halls site to start next year
6 days ago

Turkish contractor Limak to build new Luton Town stadium

Construction to start this summer on 25,000-seater venue
6 days ago

Kitchen fitter crushed to death by concrete blocks

House builder goes into liquidation before court case
6 days ago

Mears clinches £230m renewal for key Milton Keynes housing deal

Housing upkeep contractor achieves 100% renewal rate in bust rebid period
6 days ago

Murphy on board at new £32m rail station

Construction to start next year at Golborne station
6 days ago

HS2 engineers finish UK’s heaviest bridge slide early

A46 Kenilworth Bypass reopens 30 hours earlier than planned
6 days ago

Bowmer + Kirkland to build £190m Oxford science scheme

Work to start at end of next month on 180,000 sq ft Fabrica scheme
7 days ago

New BAM leisure centre pool springs a leak

Contractor investigating "technical issues" delaying new £36m green leisure centre
1 week ago

United Living lands £250m HyNet pipeline deal

Firm wins deal to design and build over 34km of pipework to collect CO2
7 days ago

Hydrogen diggers get green light to use roads

JCB hails historic decision for advance of hydrogen-fuelled plant on sites
7 days ago

Go-ahead for McAleer & Rushe Glasgow student job

£100m funding deal paves way for 591-bed student tower
7 days ago

Fly-tippers to get their vehicles crushed

Drones will be used to identify cowboy construction waste operators
7 days ago

Green light for £150m West End office revamp

Shaftesbury Avenue office retrofit retains 75% of original building
1 week ago

Contractor services