First viaduct steel section installed at HS2’s complex junction job

Aaron Morby 1 year ago
Share

Belgian steelwork specialist Victor Buyck has jacked in the first 300-tonne steel viaduct section on HS2’s complex Delta Junction project.

Working for the Balfour Beatty Vinci JV, it took the firm 11.5 hours using push-pull jacking to install the 84m long section.

It is the first section of two 158m viaducts which will take high speed trains over the M42/M6 link roads in North Warwickshire.

Before the end of this year, a similar two-stage operation will move the identical ‘West Link Viaduct’ which runs parallel to the East Link Viaduct.

Tibo Suvée, project manager at Victor Buyck Steel Construction said: “This is the first time our push-pull jacking system has been used in the UK.

“The technique provides greater flexibility during the launching operation by allowing the bridge to be moved backwards or both ways if needed.

“This is really the first milestone of four, and over the next eight months we look forward to delivering the second launch of the East Link Viaduct and the same two-stage operation for the West Link Viaduct, which will complete these first viaducts on Delta Junction.”

Alex Staines, sub agent – Composite Structures at Balfour Beatty Vinci, said: “Delivering this milestone is a really proud moment for me and the team.

“By using an innovative launching technique, we were able to build the viaduct deck offline and move it into position over a weekend closure of the highway, greatly reducing the impact on road users.”

Delta Junction Viaducts:


A total of 153 piers will be built for the 13 viaducts in the triangle-shaped Delta Junction.

  • 4 composite viaducts (M42/M6 Link Road East and West; River Cole East and West). Composite viaducts with their decks built off weathered steel boxes or beams, with a concrete deck on top.
  • 6 precast segmental viaducts (River Tame East and West; Water Orton 1 and 2; Coleshill East and West). Segmental viaducts have standard spans of 45 metres with decks built off concrete precast segments which are prefabricated at HS2’s Kingsbury Precast Yard at Lea Marston.
  • 3 low viaducts (M42 Coleshill North and South; Watton House). Low viaducts have standard spans of 25 metres with their decks built off standard concrete precast beams, with a concrete deck on top.

Latest news

Tide gets go-ahead for over 1,000-home London scheme

Volumetric expert gains planning for co-living homes scheme in Southwark
5 hours ago

Construction output flickers into life in March

First quarter activity flatlines after slow start to year
8 hours ago

Skanska lifts margin to 4.3% as profit hits £78m

Infrastructure and FM drive near-tripling of profits
18 hours ago

Mayor backs 46-storey student tower at Canary Wharf

City Hall overturns Tower Hamlets council rejection of 912-bed scheme
16 hours ago

Plans go in for 100 acre Port of Tilbury expansion

Construction could start next year on site the size of 70 football pitches
8 hours ago

Inland Homes creditors face £38m hit

Administrator confirms no cash for supply chain
1 day ago

Durkan dogged by legacy jobs despite return to trading profit

Durkan scales down new homes contracting to focus on retrofit work
22 hours ago

Munnelly founder hands over CEO role to son

Paul David Munnelly steps up to CEO as father becomes chairman
8 hours ago

Barking build to rent towers face rebuild

Major remedial work needed on resi scheme built by Shapoorji Pallonji UK Ltd
1 day ago

London new home starts plunge 38% as Building Safety Act bites

Capital only region to see Q1 fall in NHBC new home registrations
2 days ago

Sureserve swoops for rival compliance outfit Kinovo in £56m deal

Recommended cash offer will take AIM listed contractor private
1 day ago

Crown Golf tees up £1bn plan to build 3,000 homes on course land

Major housing plan for spare land on eight UK courses
1 day ago

Green light for Peterborough Station Quarter £48m revamp

First phase to start before the end of the year
1 day ago

Morgan Sindall starts £38m Caerphilly leisure hub

New swimming pool and health suite forms part of town regeneration plan
1 day ago

145 firms win places on £800m building safety framework

Fusion21 confirms latest winners: Full list
2 days ago

Higgins Homes and site workers face manslaughter charges

Contractor and four site staff charged after woman killed by falling pallet of bricks
3 days ago

Operator spots cracked mast on Hinkley tower crane

Hinkley Point C contractor hit with safety notice over failed mast pin and cracks
2 days ago

Countdown starts for £1bn Birmingham highways bid race

Council will break-up mega framework into five lots
2 days ago

Acciona wins £400m Thames waterworks upgrade

Lea Valley Coppermills water treatment works to get full overhaul
2 days ago

Pension giants pledge £25bn for infrastructure push

Seventeen pension providers pledge to invest in projects
2 days ago

Safety row over London tower ducking fire regs by 30cm

Fire union calls on Mayor to block Bromley flats plan over single staircase
2 days ago

Midgard lands £145m deal to build Edition Birmingham

Construction to start shortly on twin residential towers
3 days ago

McAleer & Rushe set to break £500m turnover barrier

Pre-tax profit jumped 16% to £46m last year
3 days ago

Top design team picked for £2.5bn York Central scheme

Massive city centre regen scheme moves to detailed design
3 days ago

MoD to bid £100m command HQ enabling works

Hertfordshire joint forces command centre expansion advances
3 days ago

Failed shed specialist Marbank owed suppliers £10m

Contractor was facing a string of adjudication claims
3 days ago

New scaffolding training trade body launches

Scaffolding Training Alliance formed amid disquiet caused by planned training changes
3 days ago

£1.8bn framework planned for green retrofit drive

Procure Plus to invite bids later this month
3 days ago

Breakthrough for HS2 as first Birmingham tunnel section dug

Balfour Beatty VINCI completes 3.5-mile TBM drive in 652 days
6 days ago

HS2 Curzon Street station redesign approved as timber roof axed

Change to meet stricter fire safety rules and cut maintenance costs
6 days ago

Contractor services