Work starts on Manchester 26-storey Obsidian tower

Aaron Morby 2 years ago
Share

Manchester developer Salboy’s building contractor Domis has started work on its 26-storey residential tower block project in the Greengate area towards the north of the city centre

The Obsidian scheme will deliver 250 flats when the project completes at the end of 2026.
The Obsidian scheme will deliver 250 flats when the project completes at the end of 2026.

Salboy’s tenth central Manchester development in seven years, the £50m-plus building project, previously known as Trinity 2 and now renamed Obsidian, will deliver 250 flats and around 1,000 sq ft of ground floor commercial space at the Trinity Way and Willam Street site.

Designed by architect Studio Power, the scheme also includes a resident’s gym, cinema room, private meeting space, and a co-working area.

The Obsidian project design team includes mechanical and electrical consultant, Novo and structural consultant, Renaissance.

The Obsidian building will comprise 31 studios, 93 one-bed flats, 111 two-bedroom apartments and 15 three bed homes.

The 221,000 sq ft site on which Obsidian will be constructed sits within Salford City Council’s Chapel Wharf Framework and has been identified as a development opportunity site.

Development on the site can be traced back to 1791 and the Salford Iron Works, one of the largest manufacturers of cast-iron products and stationary steam engines which powered mills around Manchester. The ironworks closed in the 1930s and were replaced by low-level housing in the 1970s and 1980s.

Latest news

More fines and bans for former Carillion chiefs

Finance chiefs and trio of accountants hit with penalties
11 hours ago

Fusion21 starts race for £350m housing repairs framework

Firms face fight to retain spots on third-generation repairs and voids deal
8 hours ago

Quinn London sold to staff

£109m turnover contractor latest to transition to an Employee Ownership Trust
10 hours ago

London builder Curo Construction ceases trading

Directors write to up to 100 staff telling them not to return to sites
17 hours ago

Vistry gets £600m Olympic Park homes go-ahead

First 355-home phase approved at Pudding Mill Lane in Stratford approved
14 hours ago

Fox snaps up highways contractor and readymix firm

DSD Construction and Moore Readymix acquisitions dig group deeper into civils
2 days ago

Kier and Multiplex line up for Derwent London office starts

Developer presses button on two West End schemes as leasing demand and rents strengthen
18 hours ago

McLaren lands £99m London Bond Street over-station job

Retrofit-led West One Shopping Centre will retain 60% of existing concrete frame
18 hours ago

£26bn Pagabo developer framework goes live for bidders

Four-year framework targets councils, NHS trusts and housing providers
18 hours ago

Starmer confirms plan to nationalise British Steel

Plan could clear way for greener electric arc furnace produce steel in five years
2 days ago

Cardo gains place on L&Q’s £3bn home upgrade programme

Housing body expands delivery line-up for 15-year investment plan
2 days ago

Ardmore loses High Court appeal bid to halt £14.9m Crest payout

Judge refuses appeal route and gives no extra time to pay
2 days ago

Taylor Woodrow scoops £856m HS2 control centre mega job

HS2 Washwood Heath nerve centre to cost more than treble original budget
2 days ago

Keltbray scales down as revenue drops

£1m spent on redundancies as London commercial market slows
2 days ago

East London council £500m housing major works drive

Fire safety, M&E and refurbishment works lined up across borough housing stock
2 days ago

Panattoni plans 23-acre scheme in Wakefield

Construction to start this quarter on logistics development
2 days ago

Kori lands latest deal for Care UK

Demolition work to start this week on £12m contract
2 days ago

HS2 chief pushes major project reset back to end of 2026

Wild says project overhaul must be “robust” as slower trains option explored
5 days ago

Winvic tops April contracts league after shed hub win

Orders secured by top 50 firms fall by nearly 20% compared to prior month
5 days ago

Briggs & Forrester banks £511m record pipeline after stronger year

Leaner Briggs & Forrester boosts profit and cash generation
5 days ago

Henry Boot chief prepares exit after strategic overhaul

Tim Roberts to leave later this year as successor named from inside business
5 days ago

1m sq ft Northumberland industrial park approved

Logistics park revival gains momentum with giant Northumbrland scheme
5 days ago

Construction buyers report rampant cost inflation

Input costs rise at fastest rate for nearly four years
6 days ago

Caddick taps B&K veteran to spearhead East Midlands drive

Paul Sykes joins as Caddick eyes £1bn Midlands pipeline
6 days ago

Balfour Beatty powers ahead on energy and defence boom

Contractor says 15 major transmission schemes to start construction within next 18 months
6 days ago

HG targets £500m turnover after Gateway 2 approval surge

Profit jumps 56% as contractor powers through BSR bottlenecks
6 days ago

Go-ahead for another giant data centre at Redhill

New owners of Surrey site to spend another £200m on expansion plans
6 days ago

Port of Dover picks 14 firms for civils and marine works

Conway, Jackson and Knights Brown land Dover £80m framework spots
6 days ago

Caddick looking for subcontractors across the North East

Meet the Buyer event to highlight work opportunities: Register now
7 days ago

Reds10 brings steel fabrication in-house

Modular contractor invests in ESL Fabrication Engineers
6 days ago