Construction falls 20% in Build to Rent sector

Grant Prior 2 months ago
Share

Work has contracted sharply in the Build to Rent (BtR) sector with the number of homes under construction down 20% year-on-year.

Latest analysis by Savills reveals the slow-down despite numbers from the British Property Federation (BPF) showing that the total number of purpose-built rental homes has reached more than 120,000 – a 23% increase over the past 12 months.

A drop in construction has been an ongoing trend in 2024, with the number of completions consistently outpacing the number of starts.

This gap is continuing to widen, with 12,400 more homes completing in 2024 than starting. The slow down in construction is being seen more acutely in the regions, which dropped by 23% to 34,500 homes, than in London where numbers fell by 11% to 15,500 homes.

The number of BtR homes currently complete, under construction or in various stages of planning is over 273,700, with the sector growing 5% year-on-year. But while the sector pipeline remains robust with 103,000 homes in the planning system, including 54,500 homes with planning consent, the number of new applications coming forward has dropped by 12% in the last quarter.

The slow down in construction and new planning applications is a result of increased cost pressures (partly as a result of regulatory change) and points to a potentially longer-term supply challenge.

The abolition of Multiple Dwellings Relief (MDR) in June, is already impacting the ability for schemes to progress due to viability challenges, and the BPF estimates that the number of homes foregone could be between 13,000 and 25,000.

Ian Fletcher, Director of Policy, British Property Federation, said: “Build-to-Rent has made a critical contribution to housing over the last 12 years with £40bn invested to date and 120,000 new homes built. The sector provides housing across the country for a wide range of people, especially since its diversification into low-rise homes for families.

“However, increased regulatory and other costs that have faced the sector for the last few years is starting to take its toll on new schemes, as evidenced through a drop in construction starts and new planning applications.

“Investors continue to be interested in Build-to-Rent for the UK market but we need to see policy that encourages schemes to progress and attracts the £250bn of further investment that is needed to meet demand.”

Guy Whittaker, Head of UK Build to Rent Research at Savills, added: “In the past year, a tenth of all new home completions came via Build-to-Rent developments, twice the contribution it made in 2019, five years earlier.

“But starting new sites remains a challenge and the reduction in the construction pipeline is reflective of wider development challenges facing all forms of housing delivery.

“Viability remains a hurdle in the current climate, with elevated debt and construction costs,  as does the planning system, particularly in London. If these obstacles can be navigated there is no shortage of investor demand to deliver new homes for rent, with more and more investors re-allocating capital from traditional investment sectors to Living sectors.”

 

Latest news

Bid rigging probe launched into school repair work

Firms raided this week with focus on roofing contracts
18 hours ago

Government commits to four new prisons in seven years

£2.3bn pledged for new prison build programme
17 hours ago

Go-ahead to revamp former London city hall

Project will straighten the building's leaning profile with terraces to every level
6 hours ago

Credit insurance saves Billington from ISG hit

Steel specialist puts on extra shifts at its plants to cope with demand
22 hours ago

M&E specialist Dodd doubles profit on retrofit surge

Family-owned Telford specialist delivers record revenue of nearly £250m
22 hours ago

Go-ahead for 800-home Croydon dual towers

One Lansdowne Road build to rent scheme to cost £260m to build
22 hours ago

Construction inflation set to return raising tender prices

End of 2024 to mark the bottom of present inflationary trough
22 hours ago

Start date for vast Balfour and Costain carbon capture power job

£4bn Teesside project to start construction next year creating 3,000 jobs
2 days ago

Plans go in to start revamp of North Finchley town centre

Developer Regal unveils first details of Barnet masterplan
22 hours ago

Glencar bags £18m Big Yellow London store

Six-storey stoarage centre to be built at Staples Corner
21 hours ago

Plan unveiled for 31-storey London Fenchurch Street tower

Demolition work to start in 2026 for new office tower
2 days ago

Vinci Building buys tower cranes for first time

Contractor invests in two WOLFFKRAN all-electric cranes at £138m Sheffield site
2 days ago

30 local firms land United Utilities £500m framework

Minor works deal win for North West civils and M&E specialists
2 days ago

Restructure pays off as Higgins returns to profit

Housing contractor recovers from £25.9m loss last year
2 days ago

Former Heathrow boss joins Mace in board rejig

Firm completes string NED appointments to expanded group board
3 days ago

Planning officers to get powers to bypass committee stage for housing

Rayner reform plan to cut out local council planning committees
3 days ago

National Insurance hike to delay construction recovery

Arcadis paints varied picture with full recovery delayed until 2026
3 days ago

Gratte Bros rides out cost rises with profit increase

M&E specialist warns of further upward pressure on wage costs
3 days ago

Sellar’s 36-storey London City office tower approved

Demolition work to start in 2026 at 60 Gracechurch Street site
5 days ago

Roofers caught using phone lights to work at night

Roofing boss handed suspended prison sentence for lack of edge protection
3 days ago

£380m North West housing framework out for bid

St Helens-based Torus aims to build 9,000 homes by 2029
3 days ago

Historic property magazine to close

Estates Gazette has been in business since 1858
6 days ago

M&S Marble Arch rebuild approved after three-year planning fight

Plans were delayed when Michael Gove backed carbon campaigners
7 days ago

£191m revamp funding approved for London Barbican Centre

Construction to start in 2027 on five-year programme
6 days ago

RED Construction tops £100m turnover

Builder maintains profit margin at 1.7% as business nearly doubles in size
6 days ago

Timber designs shortlisted for roads ‘footbridge of the future’

Three of five designs for National Highways propose timber structures over busy highways
6 days ago

PM pledges to fast-track 150 infrastructure schemes

Fresh promise to speed up planning decisions on infrastructure and house building
7 days ago

Amey FM firm fined after legionella kills prisoner

Court fines company £600,000 for prison upkeep failures
6 days ago

Buyers report boom in commercial work

Construction bucks slowdown in general economy
7 days ago

Plans in for £250m Stockport 8 housing-led scheme

Work to start on phase 1 by the end of next year
7 days ago

Contractor services